Analysis of the reliability value of building safety System (nkskb) and level of occupants readiness in facing Fire at johar market, semarang, central java (south johar) Esterida, Berliana; Jaryati, Jaryati; Suwandi, Putri Anggi Permata; Rizani, Mohammad Debby
International Journal of Sustainable Building, Infrastructure and Environment (IJOSBIE) Vol 3, No 1 (2022)
Publisher : Science and Technology Research Centre, Universitas PGRI Semarang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26877/ijosbie.v3i1.12715

Abstract

Abstract. Public buildings are buildings used by people from various walks of life, which are built or intended not for the benefit of private residences, but for the general public which are identical to community service centers (Siti Azizah, 2013). One of the public buildings is the Johar market, Semarang. An important aspect of a public building is fire safety. The purpose of this study was to determine the level of reliability of the public building security system against fire hazards in the Johar Semarang market (Johar Selatan), and the readiness of the occupants of the Johar Semarang market building in the face of fire disasters. The method used in this research is descriptive-quantitative research method which is collecting data obtained from interviews, field notes, personal documentation, researcher notes, and other supporting documents. The results of the analysis of the utility component assessment of the four variables resulted in a Building Safety System Reliability Value (NKSKB) of 86.12%, based on these results it can be concluded that the reliability value of the building is in good and safe condition. The level of readiness of residents in facing the danger of fire disasters is still in the poor category with an average level of readiness of residents of 51.12%. This shows the need for increased application of protection systems and rescue facilities, especially for several protection systems that are still damaged and not functioning as well as socialization to residents regarding the use of fire extinguishers, fire simulations, and the need to provide adequate PPE.Keywords: Public Buildings, Level of Reliability, Occupancy Readiness
Six Sigma-DMAIC (Define, Measure, Analyze, Improve, And Control) Analysis in Reducing Building Structural Defects (Case Study: Emirates Indonesia Cardiology Hospital Project) Mustika, Risti; Suwandi, Putri Anggi Permata; Kristiawan, Agung
International Journal of Sustainable Building, Infrastructure and Environment (IJOSBIE) Vol 6, No 2 (2025)
Publisher : Science and Technology Research Centre, Universitas PGRI Semarang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26877/ijosbie.v6i2.24619

Abstract

Abstract. Construction projects often face challenges in maintaining quality, one of which is structural defects that can affect the quality and safety of the building. This study aims to analyze the level of defects in column, beam, and slab structures using the Six Sigma DMAIC method and provide solutions to improve these defects. The study was conducted on the Emirates Indonesia Cardiology Hospital Building Construction Project in Surakarta. The method used is a quantitative descriptive approach with the stages of Define, Measure, Analyze, Improve, and Control. Data were obtained through field observations, interviews, documentation, and secondary project data. The analysis results show that the average sigma level value is above 3, with the highest level in the column structure reaching 4.3 sigma for the type of concrete flow defect. The main causes of defects come from human factors, work methods, materials, and supervision. Improvement solutions are formulated using a fishbone diagram analysis approach and the assistance of NVIVO software for qualitative data analysis. This study shows that the Six Sigma DMAIC method is effective in identifying and reducing defects in concrete structure work and can be used as a quality control strategy in construction projects.Keywords: Six Sigma, DMAIC, Structural Defects, Construction Quality, NVIVO
ANALYSIS OF PARKING CHARACTERISTICS AND THE EFFECT OF ON STREET PARKING ON TRAFFIC PERFORMANCE Zulvia, Avita; Rizani, Mohammad Debby; Suwandi, Putri Anggi Permata
International Journal of Sustainable Building, Infrastructure and Environment (IJOSBIE) Vol 3, No 1 (2022)
Publisher : Science and Technology Research Centre, Universitas PGRI Semarang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26877/ijosbie.v3i1.12903

Abstract

The space are available for park vehicle on the edge road in the area center city and along main street thing to do with permanent there is restrictions and controls as well as Settings or often called on street parking(Clarkson Grg Lesby and Bary Hicks, 1988). Study this background behind by trouble performance then traffic that is less than optimal is caused by the presence of on street parking on lane bicycle on Kartini Street, Salatiga City. In resolve problem the required existence analysis about characteristics parking and influence on-street parking along Kartini Street, Salatiga City. Method used in study this that is method approach descriptive quantitative. Collecting the data obtained from results interview, notes field, documentation private, notes researchers, and documents residents other. Study this show that characteristics parking and influence on-street parking to performance then traffic on Kartini Street, Salatiga City for duration parking belong to Category 1 and significant high turnover duration short, in general vehicle parking not enough from one hour with duration parking short in general for parking in the center spending, with capacity street 2489,22 pcu/hour, speed current free 37,665 km/hour vehicles as well as level service belong to category Level Of Service (LOS) B (0.20-0.44) with characteristics current stable, speed a little limited by past traffic, driver still could free in choose the speed.
Analysis of The Effect of Change Orders on Implementation Time and Construction Labor Costs in The Development Project of The Joint Lecture Building III at Unimus Rinaldi, Bramantyo; Suwandi, Putri Anggi Permata; Kristiawan, Agung
International Journal of Sustainable Building, Infrastructure and Environment (IJOSBIE) Vol 6, No 1 (2025)
Publisher : Science and Technology Research Centre, Universitas PGRI Semarang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26877/ijosbie.v6i1.21537

Abstract

Change orders resulted in a total time deviation of 45 days (18.75%) from the initial plan, with the most substantial delays in structural and MEP work. Regarding labor costs, MEP work experienced the largest deviation at 25% (IDR 150,000,000), followed by foundation work (16.67%), structural work (15%), and architectural work (10%). Change orders also impacted labor productivity, particularly in MEP work (-25%), followed by foundation (-16%), structural (-12.5%), and architectural work (-12.5%). These productivity decreases resulted from changes in work methods, increased complexity, and adaptation requirements to new specifications. The study recommends several measures to minimize change order impacts: more thorough design reviews before implementation, allocation of time and cost buffers, improved documentation and approval systems, and more flexible workforce planning. Effective change order management is crucial for maintaining overall project success.
ANALISIS FAKTOR-FAKTOR KETERLAMBATAN PADA PROYEK PEMBANGUNAN EXPAND & ENHANCEMENT NEUCENTRIX PUGERAN YOGYAKARTA MENGGUNAKAN SPSS Pinuji, Putri; Permata Suwandi, Putri Anggi; Rizani, Mohammad Debby
Jurnal Teknik Sipil Giratory UPGRIS Vol 6, No 1: Juni 2025
Publisher : Universitas PGRI Semarang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26877/giratory.v6i1.24096

Abstract

The 2023 Neucentrix Expand Enhancement Development Project Pugeran Yogyakarta is planned to last 19 weeks. However, there was a delay due to the large amount of additional work and new items that were not listed in the BoQ. This research aims to identify the main factors causing project delays. The data used came from a questionnaire and then factor analysis was carried out using SPSS. A total of 11 managerial team respondents filled out the questionnaire, producing 18 valid variables that were very reliable. The results of the analysis show 5 rankings of the main factors causing delays, namely: delayed payments have an impact on project delays; changes in costs due to additional work; less than optimal labor productivity; error in basic price estimation in the Cost Budget Plan; difficulty in finding materials and/or equipment due to certain specialties; submission and request for changes to completed work from the project owner; changes in work methods by contractors; lack of adequate workforce; owner's delay in making decisions; changes to the scope of work (SOW) during implementation; and lack of workforce discipline regarding attendance and attendance, which hampers work time
ANALISIS MANAJEMEN KONSTRUKSI DENGAN METODE POAC (PLANNING, ORGANIZING, ACTUATING, CONTROLLING) PADA PROYEK PONDOK PESANTREN AL-AMANAH 4 KOTA SEMARANG Kuncara, Dana; Hsada, Ibnu Toto; Permata Suwandi, Putri Anggi
Jurnal Teknik Sipil Giratory UPGRIS Vol 6, No 2: Desember 2025
Publisher : Universitas PGRI Semarang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26877/giratory.v6i2.27921

Abstract

The success or failure of a project depends on how construction management manages and utilizes available resources, as well as how it handles problems when they arise. With a company or individual that is professional in the field of construction management, project owners will find it easier to manage their projects effectively and efficiently. In this development, there needs to be adequate construction management system management. With this in mind, the researcher conducted a construction management analysis study on the Al-Amanah 4 Islamic Boarding School Development Project in Amanah City. This research aims to identify the factors that affect the performance of construction management, determine the steps that need to be taken to overcome problems that arise, so that the implementation of construction management performance in the project can run smoothly, and analyze the implementation of construction management perfo
ANALISIS KOEFISIEN KEBUTUHAN MATERIAL DAN TENAGA DENGAN METODE ANALISIS BURGERLIJKE OPENBARE WERKEN (BOW) DAN METODE ANALISIS SNI 2008 TERHADAP EFISIENSI ALUR PENGADAAN MATERIAL DI PROYEK (Studi Kasus : Bangunan Tenant-150, Project Awann Costa POJ, Semarang) Octaviana, Luthfia Dea; Permata Suwandi, Putri Anggi; Rizani, Mohammad Debby
Jurnal Teknik Sipil Giratory UPGRIS Vol 5, No 2: Desember 2024
Publisher : Universitas PGRI Semarang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26877/giratory.v5i2.21970

Abstract

The development of construction planning, especially in the construction of building structures, calculates unit prices using a tool called Construction Cost Analysis (ABK), where until now the method often used by contractors and consultants is the BOW (Burgerlijke Openbare Werken) guideline. However, as time went by, it was realized that the BOW guidelines were only segmentally suitable for projects in the form of labor-intensive work that utilized conventional equipment and less professional workforce, which resulted in very expensive planning costs if this approach was still used purely. The 2008 Indonesian National Standard (SNI) analysis method is an update of the 1921 BOW (Burgerlijke Openbare Werken) analysis during the Dutch government, in other words, the SNI analysis is an updated BOW analysis. This SNI analysis was issued by the Center for Settlement Research and Development. The cost preparation system using SNI analysis is almost the same as the calculation system using BOW analysis. The basic principle of the SNI method is that a list of coefficients for materials and labor costs has been determined to analyze the price or costs required to make a unit price for building work. From these two coefficients we will get a calculation of the materials needed and a calculation of the wages of those doing the work. The comparative composition and arrangement of materials and labor for one job has been determined, which is then multiplied by the price of materials and wages prevailing in the market.
ANALISIS PEMANFAATAN LIMBAH ABU BONGGOL JAGUNG CAMPUR ABU SEKAM PADI TERHADAP KUAT TEKAN BETON MUTU K200 Maulana, Arya Dwi; Syakirul Iman, Abdika Setiawan; Kristiawan, Agung; Permata Suwandi, Putri Anggi
Jurnal Teknik Sipil Giratory UPGRIS Vol 6, No 2: Desember 2025
Publisher : Universitas PGRI Semarang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26877/giratory.v6i2.27917

Abstract

Along with the development of science and technology, many studies have been carried out to implement environmentally friendly concrete innovations. One of them uses agricultural waste as a concrete mixture, in Sewaka Village, Pemalang District, Pemalang Regency, agricultural waste from corn cobs and rice husks. The purpose of this study is to utilize waste as an additive to cement for concrete mixtures in the quality of K200 concrete with mixed materials in the form of corn cob ash mix rice husk ash. This research was carried out by mixing design, by making a standard concrete sample with K200 quality as a control, then making a concrete sample with several variations of corn cob ash substitution mixtur mix rice husk ash 5%, 10%, 15% to the weight of cement. The specimen sample uses a cube mold (15cm x 15cm x 15cm). From the test results on the concrete of corn cob ash substitution mixture mixed rice husk ash with a percentage of 5%, 10%, 15% of the 7 days and 14 days of age experienced a decrease in the compressive strength of the K200 plan, from the test it was obtained that the average compressive strength value of 5% variation of 7 days old was 136.00 (kg/cm2) and the age of 14 days was 151.11 (kg/cm2), 10% variation at 7 days of age 169.71 (kg/cm2) and 14 days of age at 164.85 (kg/cm2), variation of 15% at 7 days of age 153.44 (kg/cm2) and 14 days of age at 115.91 (kg/cm2).
PENGARUH KOMPETENSI, MOTIVASI, DAN DISIPLIN TERHADAP KINERJA SDM PADA PROYEK KONSTRUKSI BANGUNAN GEDUNG Ibnu Toto Husodo; Putri Anggi Permata Suwandi; Agung Kristiawan
Journal of Economic, Business and Engineering (JEBE) Vol. 7 No. 2 (2026): April
Publisher : Universitas Sains Al Qur'an

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32500/jebe.v7i2.11057

Abstract

Proyek konstruksi bangunan gedung memiliki kompleksitas tinggi yang sering memicu permasalahan kinerja, seperti keterlambatan, penurunan kualitas, dan rendahnya produktivitas tenaga kerja. Kondisi ini menegaskan bahwa keberhasilan proyek tidak hanya bergantung pada aspek teknis, tetapi juga pada efektivitas pengelolaan sumber daya manusia (SDM). Penelitian ini mengkaji pengaruh kompetensi, motivasi, dan disiplin kerja terhadap kinerja SDM menggunakan pendekatan kuantitatif dengan analisis SEM-PLS berbasis data kuesioner. Hasil penelitian menunjukkan bahwa ketiga variabel tersebut berpengaruh positif dan signifikan, dengan kompetensi sebagai faktor paling dominan. Temuan ini mengindikasikan bahwa peningkatan kinerja tenaga kerja konstruksi memerlukan pengelolaan SDM yang terintegrasi melalui penguatan kompetensi, peningkatan motivasi, dan penerapan disiplin kerja secara konsisten.
ANALISIS PRODUKTIVITAS PEKERJA DENGAN METODE TIME STUDY PADA PEKERJAAN KOLOM (STUDI KASUS PROYEK REHABILITASI PASAR JOHAR KOTA SEMARANG) Sandi, Cahyo Kurnia; Cahyono, Ndaru; Husodo, Ibnu Toto; Permata Suwandi, Putri Anggi
Jurnal Teknik Sipil Giratory UPGRIS Vol 1, No 1: Juni 2020
Publisher : Universitas PGRI Semarang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26877/giratory.v1i1.5421

Abstract

Pembangunan gudang logistik Polres Lamongan, sebagai salah satu elemen infrastruktur publik, perlu dilakukan pengawasan dengan tingkat efisiensi yang tinggi untuk mendukung kebutuhan operasional kepolisian. Beberapa masalah operasional telah muncul yang menghambat penyelesaian tepat waktu. Salah satu masalah utama yang dihadapi adalah keterlambatan dalam pengiriman material yang sangat mempengaruhi kelancaran pekerjaan. Penelitian ini bertujuan untuk menganalisis faktor-faktor yang mempengaruhi keterlambatan dalam proyek pembangunan Gudang Logistik Polres Lamongan, dengan fokus pada peran kontraktor, supplier, konsultan, dan pemilik proyek. Melalui pendekatan kuantitatif, penelitian ini mengidentifikasi faktor-faktor internal dan eksternal yang dapat menyebabkan keterlambatan proyek konstruksi. Metode yang digunakan dalam penelitian ini meliputi analisis regresi linier berganda untuk menentukan hubungan antara variabel independen (lingkungan kerja, keterlambatan material, peralatan, tenaga kerja, dan perubahan desain) dengan keterlambatan pelaksanaan pekerjaan.Hasil penelitian menunjukkan bahwa faktor tenaga kerja memiliki pengaruh terbesar terhadap keterlambatan proyek, dengan nilai beta 0,455, diikuti oleh perubahan desain yang memiliki pengaruh positif meskipun kecil. Sementara itu, faktor lingkungan kerja, keterlambatan material, dan peralatan tidak menunjukkan pengaruh signifikan. Untuk mengatasi keterlambatan, penelitian ini merekomendasikan perbaikan dalam koordinasi antar pihak terkait, manajemen sumber daya yang lebih baik, dan perencanaan yang lebih matang. Penelitian ini memberikan wawasan yang penting untuk meningkatkan pengelolaan proyek konstruksi dan mencegah keterlambatan yang tidak terduga pada proyek-proyek serupa di masa depan.