Claim Missing Document
Check
Articles

Found 3 Documents
Search
Journal : DINAMIKA Jurnal Ilmiah Teknik Mesin

RANCANGAN SISTEM KELISTRIKAN PLTS ON GRID 1500 WATT DENGAN BACK UP BATTERY DI DESA TIMAMPU KECAMATAN TOWUTI Muhammad Naim; Setyo Wardoyo
Dinamika : Jurnal Ilmiah Teknik Mesin Vol 8, No 2 (2017)
Publisher : Jurusan Teknik Mesin, Universitas Halu Oleo

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (596.913 KB) | DOI: 10.33772/djitm.v8i2.2379

Abstract

Salah satu solusi untuk mengatasi permasalahan listrik di Desa Timampu Wilayah Kecamatan Towuti adalah penyediaan sumber energi baru dan terbarukan yang ramah lingkungan sebagai alternatif untuk penambahan suplai listrik yaitu sistem kelistrikan PLTS On Grid dengan Backup battery. Tujuan dari penelitian ini adalah untuk merancang sistem kelistrikan PLTS On Grid Backup Battery dengan Kapasitas 1500 Watt di Desa Timampu kecamatan Towuti.PLTS On Grid dengan Backup Battery merupakan sistem kelistrikan yang terintegrasi dengan jaringan PLN sehingga energi listrik dari jaringan PLN tetap menjadi pemasok utama kemudian PLTS sebagai tambahan. Sementara itu Battery diharapkan sebagai sumber energi cadangan jika terjadi kondisi gangguan ataupn mendesak.Hasil penelitian menunjukkan bahwa peralatan yang dibutuhkan untuk mendukung sistem kelistrikan. PLTS On Grid 1500 Watt dengan Backup Battery adalah 6 buah Photovoltaic berkapasitas 250 Wp, Solar Charge Controller jenis MPPT berkapasitas 1500 Watt, AKI basah 2 x 100 Ah dan 2 x 60 Ah dengan tegangan 24 Volt dan kapasitas 160 Ah, Inverter jenis Pure Sine Wave dengan kapasitas 1500 Watt dan KWH meter jenis piringan dengan 2 arah putaran. Kata Kunci:  PLTS On Grid, kelistrikan, photovoltaic, integrasi
Rancangan Pembangkit Listrik Tenaga Mikro Hidro Di Kampung Dongi Kecamatan Nuha Muhammad Naim; Ichsan Ristiawan
Dinamika : Jurnal Ilmiah Teknik Mesin Vol 9, No 2 (2018)
Publisher : Jurusan Teknik Mesin, Universitas Halu Oleo

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (311.839 KB) | DOI: 10.33772/djitm.v9i2.4185

Abstract

One solution to solve electrical problems in the Dongi village of Nuha District is the provision of new and renewable energi sources that are environmentally friendly as an alternative to electricity supply. Source of new energi and renewable environmentally friendly in question is Hydro Micro Power Plant. The purpose of this research is to design a PLTMH in Dongi village, Nuha sub-district, East Luwu regency, so that it can solve the electricity problem in this area. The results showed that the components of PLTMH support in Dongi village were dam with dump type with concrete layer, take-up building with debit 12,00 m3 /second and door width of intake 2 unit, Trapezoidal carrier channel from stone pair plastered with discharge of 11.00 m3 /sec and equipped with drainage channels and control boxes and culverts, tranquilizers with construction of pairs of stone plastered with a basin base of corrosion concrete (without reinforcement) waterproof, fast pipe which will be mounted from PVC pipe type with diameter 3 inchi with total length 30 meter, Power House, drainage with bottom width 2 x 4.0 m, water height 1.0 m, and length 15 m, Turbine Cross-flow with turbine specification Age wear; at least 10 years, Reliability; 300 hours per year, Overhaul; 3 years, bearing, water seal, belt, Efficiency at least 55%, Casing does not leak, Asynchronous Generator with type specification: Induction Motor As Generator, horizontal axle, foot mounted, TECO or equivalent, Double Bearing, power rating: 40 hp, 30 kW, 3 phase, 50 Hz, 220/380 V, operational rating: continous duty, warranty efficiency: 87%, 4 pole pairs, Control system uses load settings so that the amount of power generator output is always equal to load, and Power distribution network is designed using NYY wire with pole in the form of wooden pole. Keywords: Micro hydro, Weir, Turbine, Asynchronous generator
RANCANGAN SISTEM KELISTRIKAN PLTS OFF GRID 1000 WATT DI DESA MAHALONA KECAMATAN TOWUTI Muhammad Naim
Dinamika : Jurnal Ilmiah Teknik Mesin Vol 9, No 1 (2017)
Publisher : Jurusan Teknik Mesin, Universitas Halu Oleo

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (507.677 KB) | DOI: 10.33772/djitm.v9i1.3216

Abstract

Salah satu solusi untuk mengatasi permasalahan listrik di Desa Mahalona Wilayah Kecamatan Towuti adalah penyediaan sumber energi baru dan terbarukan yang ramah lingkungan sebagai alternatif untuk penambahan suplai listrik yaitu sistem kelistrikan PLTS Off Grid. Tujuan dari penelitian ini adalah untuk merancang system kelistrikan PLTS Off Grid dengan Kapasitas 1000 Watt di desa Mahalona  kecamatan Towuti  Kabupaten Luwu Timur agar nantinya dapat mengatasi permasalahan kelistrikan yang terjadi di wilayah ini. Hasil penelitian menunjukkan bahwa peralatan yang dibutuhkan untuk mendukung sistem kelistrikan.PLTS Off Grid 1000 Watt adalah  Photovoltaic ( PV ) atau sel Surya berjumlah 4 buah dengan spesifikasi teknis; type cell monocrytalline, effisiensi cell > 15 %, daya maksimum 260 Wp. Solar Charge Controller yang menggunakan teknologi MPPT dengan spesifikasi teknis; tegangan kerja PV max 140 VDC, tegangan kerja baterai 48 VDC, Arus Output max 60 A, efisiensi >97 %, dan kapasitas 1000 Watt. Battery bank Deep cycle dengan spesifikasi teknis; type baterai  Deep Cycle OPzV, tegangan nominal 2 V/cell, Cycle life >1200, DOD 80 %, dan kapasitas 160 Ah. Dan Bidirectional inverter dengan Spesifikasi teknis; DC input Volt (nominal) 50,4 V, input Voltage limit 40-64 V, input Current 131 A, Charging Current 100 A, Type of signal True Sine Wave 50 Hz, Continous Output Power 1 KVA. Kata Kunci:  PLTS Off Grid, kelistrikan, photovoltaic, spesifikasi