Penyebab Rendahnya Nilai Internal Control Pada Proyek X PT XYZ 2023 Di Kota Balikpapan Aziz Kurnain; Maslina Maslina; Muhamad Ramdan
Jurnal Ners Vol. 7 No. 1 (2023): APRIL 2023
Publisher : Universitas Pahlawan Tuanku Tambusai

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/jn.v7i1.13675

Abstract

Perseroan Terbatas (PT) XYZ pada dasarnya ialah salah satu perusahaan yang bergerak di bidang industri oil and gas, pada proses penggarapan usaha tersebut ini tentunya mempunyai berbagai macam kemungkinan adanya kecelakaan kerja. Pada hasil laporan internal control HSE yang dilakukan oleh PT XYZ memiliki nilai rendah terhadap 2 (dua) elemen SMK3 Nasional yaitu elemen 2: tentang pembuatan dan rencana strategi K3 dan elemen 7: tentang standar pemantauan. Penelitian ini dilakukan dengan menggunakan metode kualitatif. Sumber data dalam penelitian ini diantaranya ialah wawancara serta dokumen perusahaan. Analisis data dilakukan menggunakan content analysis. Hasil penelitian dengan menggunakan teori 4M1E dikemukakan bahwasanya unsur penyebab rendahnya nilai Internal Control pada proyek X PT XYZ 2023 di Kota Balikpapan ialah unsur Man, Method. Mengacu pada hasil penelitian perlu adanya penggembangan sistem pemantauan yang lebih efektif, pembuatan form checklist dan prosedur tindakan perbaikan yang jelas, serta pelatihan dan sosialisasi yang lebih baik tehadap karyawan tentang pentingnya partisipasi aktif dalam memastikan keselamatan kerja di area proyek.
ANALISIS PENJADWALAN PROYEK REHABILITASI JALAN PRESERVASI JALAN KERANG – KUARO KALIMANTAN TIMUR MENGGUNAKAN METODE PDM DAN PERT: SCHEDULING ANALYSIS OF THE REHABILITATION PROJECT PRESERVATION ROAD KERANG ROAD – KUARO EAST KALIMANTAN USING PDM AND PERT METHODS Maslina Maslina; Reno Pratiwi; Adi Muhammad Ridho
Jurnal Ilmiah Teknik Sipil TRANSUKMA Vol. 5 No. 2 (2023): Jurnal Penelitian Transukma
Publisher : Program Studi Teknik Sipil, Fakultas Teknik Sipil dan Perencanaan, Universitas Balikpapan

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Pekerjaan rehabilitasi jalan merupakan penanganan suatu ruas jalan yang mengalami rusak ringan dengan mengganti atau memperbaiki struktur lapisan pondasi aspal (LPA) dan aspal jalan. Kendati dalam proyek rehabilitasi jalan ini mengalami keterlambatan selama 14 hari kerja maka akan dilakukan analisis terhadap penjadwalan proyek menggunakan metode PDM (Precedence Diagram Method) dan metode PERT (Program Evaluation and Review Technique), tujuannya adalah untuk mengetahui berapa lama durasi yang didapatkan menggunakan metode tersebut dan berapa probabilitas efektif proyek tersebut dapat selesai dengan baik. Dari data kurva S yang diolah dengan bantuan Microsoft project 2013 untuk memperoleh hubungan antar pekerjaan menggunakan metode PDM yang kemudian akan dapat dilihat lintasan kritis pada proyek tersebut, sehingga dari lintasan kritis tersebut menjadi acuan mencari durasi yang diharapakan (te) yang kemudian dihitung nilai deviasi standar (S) dan varians sehingga didapat probabilitas proyek tersebut dapat selesai. Hasil penelitian yang didapat adalah durasi proyek rehabilitasi jalan yang sebelumnya mengalami keterlambatan 14 hari, dan saat dilakukan penelitian pada penjadwalan proyek tersebut menggunakan kombinasi metode PERT dan PDM mendapati probabilitas target dengan 161 hari dapat tercapai sebesar 89%, sehingga proyek dapat dikatakan masih dapat selesai tepat waktu. A road rehabilitation project handles a lightly damaged road segment by replacing or repairing the structure of the asphalt foundation layer (LPA) and asphalt road. Although the road rehabilitation project experienced a delay of 14 working days, an analysis of the project schedule will be carried out using the PDM (Precedence Diagram Method) and PERT (Program Evaluation and Review Technique) methods, the aim is to find out how long the duration is obtained using these methods. and what is the effective probability of the project being successfully completed. From the S curve data processed with the help of Microsoft project 2013 to obtain the relationship between jobs using the PDM method, we will then be able to see the critical path of the project so that the critical path becomes a reference for finding the expected duration (te) which is then calculated the standard deviation value. (S) and variance so that the probability of the project can be completed. The results obtained are the duration of the road rehabilitation project which previously experienced a delay of 14 days. When the research was conducted on the project schedule using a combination of PERT and PDM methods, it found that the target probability of 161 days could be achieved by 89%, so the project can still be said to be completed on time.
KAJIAN RISIKO KECELAKAAN KERJA PADA PROYEK KONSTRUKSI PEMBANGUNAN KANTOR DINAS LINGKUNGAN HIDUP SAMARINDA: ANALYSIS OF RISK ACCIDENTS ON CONSTRUCTION PROJECT FOR THE SAMARINDA ENVIRONMENT SERVICE OFFICE Maslina Maslina; Muhammad Kurnia; Natasya Amalia Iswanto Putri
Jurnal Ilmiah Teknik Sipil TRANSUKMA Vol. 5 No. 2 (2023): Jurnal Penelitian Transukma
Publisher : Program Studi Teknik Sipil, Fakultas Teknik Sipil dan Perencanaan, Universitas Balikpapan

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Pada hakikatnya Keselamatan dan Kesehatab Kerja (K3) merupakan kegiatan yang menjadi hal prioritas dalam kegiatan pekerjaan konstruksi guna mengantisipasi kemungkinan timbulnya kecelakaan kerja pada pekerjaan-pekerjaan konstruksi. Pada umumnya kecelakaan kerja dalam bidang konstruksi mayoritas disebabkan oleh faktor manusia dan faktor lingkungan kerja. Kecelakaan kerja pada proyek konstruksi tinggi, namun program keselamatan kerja masih kurang mendapat perhatian, maka yang dapat dilakukan antara lain mengidentifikasi apa-apa saja risiko dan bahaya serta faktor-faktor penyebab yang mungkin terjadi suatu kecelakaan kerja di lokasi tersebut. Tujuan penelitian ini untuk mengidentifikasi resiko dan bahaya-bahaya yang mungkin terjadi pada proyek tersebut sehingga kecelakaan yang terjadi dapat diminimalisir. Hasil dari penelitian ini didapatkan risiko kecelakaan kerja yang dominan atau tinggi pada Proyek Pembangunan Kantor Dinas Lingkungan Hidup Samarinda yaitu pada pekerjaan perakitan bekisting dengan berisiko tergores material. Faktor dari risiko kecelakaan kerja yang dominan berdasarkan teori domino yaitu Lack of control/ management, Basic cause/ origins. Immediate cause/ symptoms, dan Incident Loss. In essence, Occupational Safety and Health (K3) is an activity that becomes a priority in construction work activities in order to anticipate the possibility of work accidents in construction works. In general, the majority of work accidents in the construction sector are caused by human factors and work environment factors. Work accidents on construction projects are high, but the work safety program is still not getting enough attention, so what can be done is to identify the risks and hazards as well as the factors that may cause a work accident at that location. The purpose of this study is to identify the risks and hazards that may occur in the project so that accidents that occur can be minimized. The results of this study obtained a dominant or high risk of work accidents in the Samarinda Environmental Office Development Project, namely in the formwork assembly work with the risk of being scratched by the material. The dominant factors of occupational accident risk based on domino theory are Lack of control / management, Basic cause / origins. Immediate cause/symptoms, and Incident Loss.