Journal : Rekayasa Sipil

Model Strategi Pemasaran Jasa Konsultansi Kontraktor Di Kalimantan Selatan Candra Yuliana; Retna Hapsari Kartadipura
Rekayasa Sipil Vol 11, No 2 (2017)
Publisher : Department of Civil Engineering, Faculty of Engineering, University of Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (528.55 KB) | DOI: 10.21776/ub.rekayasasipil/2017.011.02.4

Abstract

Most of the general public of service users have not understood the value of construction consultancy services. This inhibits market opportunities in the private sector for construction consulting services particularly in South Kalimantan. The objective of the research is to create an appropriate marketing strategy for corporation construction consultancy services in South Kalimantan.Strategies can be identified by SWOT analysis, AHP analysis and Importance Performance Analysis. This research is done by giving questionnaire to the service users and construction consulting firms in South Kalimantan. The result of the research are, a model of the marketing strategy of the construction consulting service, Strength-Opportunity strategy, grow and build strategy, service pricing strategy, and a basic strategy. This is a collaboration between the marketing-mix and service quality. 
Manajemen Risiko Kontrak Untuk Proyek Konstruksi Candra Yuliana
Rekayasa Sipil Vol 11, No 1 (2017)
Publisher : Department of Civil Engineering, Faculty of Engineering, University of Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (351.265 KB) | DOI: 10.21776/ub.rekayasasipil.2017.011.01.2

Abstract

Construction projects often pose a risk of adverse impact on the cost, time and quality of the project during implementation. The risks are included in the category of dominant risk can be avoided and eliminated. The study was conducted by distributing questionnaires to the expert who competence in the implementation of the project at the Department of Public Works, to determine the risks of any risk identified and the dominant influence of the project. The dominant risk has a risk value between 5 and 25. There are 34 major risks, consisting of 5 unacceptable risk and 29 unacceptable risks. There are 44 action for risk mitigation unacceptable and undesirable. 
ANALISIS RESOURCE LEVELING SUMBER DAYA ALAT MENGGUNAKAN METODE BURGESS Candra Yuliana; Retna Hapsari Kartadipura; Satria Wijaya
Rekayasa Sipil Vol 13, No 2 (2019)
Publisher : Department of Civil Engineering, Faculty of Engineering, University of Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21776/ub.rekayasasipil.2019.013.02.6

Abstract

Dalam mengalokasikan sumber daya diperlukan logika saling ketergantungan antar kegiatan dalam suatu proyek konstruksi. Semakin banyak kegiatan atau pekerjaan yang terdapat dalam suatu proyek maka semakin rumit pula pengalokasian sumber daya tersebut. Karena kerumitan tersebut, maka alokasi sumber daya yang direncanakan tidak terdistribusi secara ideal sehingga mengakibatkan alokasi sumber daya yang bersifat tidak tetap. Penelitian dilakukan pada dua proyek jalan yaitu pada proyek Jalan Kiram-Simpang 3 Tahura-Mandiangin dan Jalan Gunung Kupang-Kiram-Tambang Ulang, dengan pembahasan khusus pada sumber daya alat. Pemanfaatan alat berat pada suatu proyek konstruksi dapat memberi insentif pada efisiensi dan efektifitas pada tahap pelaksanaan maupun hasil yang dicapai maka  diperlukan upaya penelitian dengan menerapkan perataan sumber daya (resource leveling) peralatan menggunakan metode burgess terhadap dua proyek sekaligus. Setelah dilakukan resource leveling pada aktifitas-aktifitas non kritis ,penggunaan alat dan biaya langsung perminggu lebih stabil. Penundaan sebanyak 4 minggu pada pekerjaan pasangan batu dengan mortar pada proyek 2, dan penundaan sebanyak 7 minggu pada pekerjaan pasangan batu dengan mortar pada proyek 1.