Manajemen Risiko pada Pelaksanaan Pekerjaan Bendung Batang Pagian Kabupaten Dharmasraya Junaidi, Junaidi; Zarfinal, Zarfinal; Anif, Bahrul
Jurnal Talenta Sipil Vol 7, No 2 (2024): Agustus
Publisher : Universitas Batanghari Jambi

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33087/talentasipil.v7i2.601

Abstract

Risks in construction project work are events or occurrences that are uncertain but can have a positive or negative impact on the sustainability of a project. In this research, the author carried out an analysis of risks, impacts and risk responses caused by failure in the construction work of the Batang Pangian weir construction project. The aim is to identify potential risks and the impact of risks that occur in the implementation of the Batang Pagian weir project work, as well as to obtain risk responses that can be carried out. The research was conducted qualitatively through field surveys and interviews with respondents involved in the field. Next, a risk assessment was carried out referring to the Godfrey development method. Based on the results of research analysis, it was found that the flood disaster was the main trigger for failure in the implementation of construction work for the Batang Pangian Dam. The impact of the flood disaster resulted in the main irrigation canal being closed so that water flow became obstructed and had an impact on the agricultural sector. The risk responses carried out include creating alternative channels and conducting outreach to the community regarding this problem.
Pengaruh Peran Konsultan pada Performa Proyek Jalan di Kabupaten Dharmasraya Albar, Yuda E. D.; Yulius, Nursyaifi; Anif, Bahrul
Jurnal Civronlit Unbari Vol 9, No 2 (2024): Oktober
Publisher : Universitas Batanghari

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33087/civronlit.v9i2.136

Abstract

In the development of road infrastructure development, many are still found to be less than optimal in its implementation, not on time, and contract termination. One of them is road improvement work in Dharmasraya Regency. This study aims to identify the role of consultants in the performance of road projects in Dharmasraya Regency and to assess the most dominant role of consultants that influence the success of a road construction project. This research was conducted using a quantitative method. The data source uses primary data obtained from interviews and secondary data obtained from literature reviews. The research population was 81 respondents consisting of the owner, namely the Dharmasraya Regency PU Service, supervisory consultants, and implementing contractors involved in road construction and improvement projects in Dharmasraya Regency for the 2020 to 2022 budget years. The research sample used was the entire population. Data analysis techniques used factor analysis and multiple regression analysis. The results of the study found 61 sub-factors or variables that were the role of consultants in the successful implementation of road construction projects in Dharmasraya Regency. The dominant factor that is the role of consultants in controlling the implementation of road supervision in Dharmasraya Regency is the task factor with the sub-factor of coordinating all construction supervision personnel for each implementation of field measurements or engineering. The factors that are the role of consultants in controlling the implementation of road supervision in Dharmasraya Regency greatly influence costs, quality, and time with levels of influence reaching 48.3%; 56.8%; and 55.7% respectively.
FAKTOR KETERLAMBATAN PEKERJAAN PEMBANGUNAN GEDUNG PADA KABUPATEN SIJUNJUNG Nurhayati, Nurhayati; Anif, Bahrul; Heldi, Heldi
SIGMA TEKNIKA Vol 7, No 2 (2024): SIGMATEKNIKA, VOL. 7, N0. 2, NOVEMBER 2024
Publisher : Fakultas Teknik, Universitas Riau Kepulauan

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33373/sigmateknika.v7i2.6711

Abstract

Keterlambatan proyek dalam pembangunan berpengaruh terhadap waktu pelaksanaan. Keterlambatan faktor kritis dalam proyek konstruksi, berdampak kerugian, menimbulkan persoalan sanksi denda dan pemutusan kontrak secara sepihak.Tujuan penelitian adalah mengindentifikasi faktor-faktor penyebab keterlambatan dan menganalisis faktor yang paling dominan penyebab keterlambatan pekerjaan pembangunan gedung pada Kabupaten Sijunjung. Metoda yg digunakan metoda kuantitatif dan kualitatif dengan cara penyebaran kuesioner kepada responden berjumlah 70 responden. Selanjutnya dilakukan pengujian dan analisis faktor terhadap variable yang diperoleh dari hasil kuesioner dengan menggunakan SPSS versi 20. Hasil penelitian terdapat 5 faktor penyebab keterlambatan yang terdiri dari faktor sumber daya manusia (SDM) dan peralatan, faktor bahan (material), faktor keuangan (financial), faktor lingkungan proyek, dan faktor manajerial. Secara keseluruhan kelima faktor mampu menjelaskan 74,672% penyebab keterlambatan pekerjaan pembangunan gedung pada Kabupaten Sijunjung. Faktor dominan penyebab keterlambatan pekerjaan pembangunan gedung pada Kabupaten Sijunjung adalah faktor sumber daya manusia dan peralatan sebesar 42,919%.
Analisis Risiko Penyebab Keterlambatan Pekerjaan Konstruksi Gedung Zali, Syatria; Mulyani, Rini; Anif, Bahrul
Jurnal Teknik Sipil Institut Teknologi Padang Vol 12 No 1 (2025): Jurnal Teknik Sipil institut Teknologi Padang
Publisher : ITP Press

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21063/jts.2025.V1201.009-017

Abstract

Proyek konstruksi merupakan proyek yang berisiko dengan kompleksitas tinggi, menimbulkan ketidakpastian, dan pada akhirnya menimbulkan berbagai risiko. Tidak teridentifikasi dan tertanganinya faktor - faktor risiko dalam pelaksanaan proyek tersebut dapat mengakibatkan kendala dalam pencapaian tujuan proyek dibidang waktu (time), biaya (cost) dan kualitas (quality). Penelitian ini bertujuan untuk mengidentifikasi faktor-faktor risiko penyebab keterlambatan yang dihadapi oleh pelaku konstruksi gedung di Kabupaten Sijunjung, melakukan penilaian tingkat risiko dan merencanakan respon risiko. Metode yang digunakan adalah metode kuantitatif dengan identifikasi risiko yang dilakukan adalah melakukan studi literatur, penilaian frekuensi/probabilitas risiko dan penilaian dampak risiko menggunakan Severity Index dan Probability Impact Matrix. Sedangkan untuk merencanakan respon risiko dilakukan dengan melakukan studi literatur dan meminta pendapat ahli. Dari hasil analisis diperoleh kesimpulan bahwa terdapat 3 risiko dengan kategori risiko tinggi yaitu: 1. ketersediaan keuangan selama pelaksanaan/ penyediaan aliran kas yang cukup; 2. Tidak adanya dukungan keuangan dari bank untuk penambahan modal kerja; dan 3. Gangguan keamanan di lokasi proyek. Rencana respon yang didapat adalah dengan strategi mengurangi (mitigate), menghindari (avoid) dan mengalihkan (transfer) dan terdapat 7 rencana tindakan yang dapat dilakukan untuk menghindari keterlambatan sebagai dampak negatif dari risiko.
PERFORMANCE ANALYSIS OF USAU BATANG TIMPEH IRRIGATION NETWORK MANAGEMENT IN DHARMASRAYA DISTRICT Darmawan, Tedi; Utama, Lusi; Anif, Bahrul
Rang Teknik Journal Vol 8, No 1 (2025): Vol. 8 No. 1 Januari 2025
Publisher : Fakultas Teknik Universitas Muhammadiyah Sumatera Barat

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31869/rtj.v8i1.5698

Abstract

Irrigation has a huge impact on meeting water needs for rice fields. Good irrigation needs to pay attention to irrigation management so that it can meet the water needs of the population's rice fields. In this research, the assessment of irrigation management performance is based on five variables, namely physical infrastructure, documentation, personnel, water user farmer associations, and planting productivity. Data collection was carried out by giving questionnaires to water managers and users and the results showed that the irrigation management performance of the Batang Timpeh Usau Irrigation Area was in very poor condition. This condition has an impact on the lack of harvest yields, the lack of farming per year, and the quality of the rice produced being less than optimal. Some improvement efforts that can be carried out include rehabilitating weir buildings, cleaning irrigation channels, assigning special personnel to manage irrigation networks, and providing outreach to the community.
ANALYSIS OF USER SATISFACTION WITH PARIAMAN PEOPLE'S MARKET ASSETS AND FACILITIES Laura, Fedwina; Wardi, Wardi; Anif, Bahrul
Rang Teknik Journal Vol 8, No 1 (2025): Vol. 8 No. 1 Januari 2025
Publisher : Fakultas Teknik Universitas Muhammadiyah Sumatera Barat

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31869/rtj.v8i1.5252

Abstract

User satisfaction has an influence on customer retention, purchase intention and willingness to repeat business. Satisfied users tend to be loyal, while dissatisfied users tend to leave the transaction. The aim of the research is to analyze factors and determine the dominant factors in user satisfaction with Pariaman people's market facilities. Then look for solutions to increase user satisfaction at the Pariaman People's Market. The research method used was qualitative by interviewing informants. The results of the research found that the dominant factors in user satisfaction with the Pariaman People's Market facilities were: The condition and atmosphere of the market was not congested, all traders were of the opinion that the condition and atmosphere of the not congested market had not yet reached the level of user satisfaction with the Pariaman People's Market facilities
Faktor Penyebab Rendahnya Kualitas Pekerjaan Jalan di Kabupaten Sijunjung Firdaus, Ilyas; Jumas, Dwifitra Y; Anif, Bahrul
Jurnal Talenta Sipil Vol 8, No 1 (2025): Februari
Publisher : Universitas Batanghari Jambi

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33087/talentasipil.v8i1.804

Abstract

The quality of road work determines the level of safety and comfort of road users. Many road construction works are found to be damaged before their design life, due to the low quality of the road work. Many factors influence the quality of road work. The aim of this research is to identify the factors causing the low quality of road work in Sijunjung Regency, to find the dominant factors, and to find solutions so that the quality of road work meets the established specifications. This research uses a combination approach (mixed methods). A quantitative approach is used to identify the dominant factors causing the low quality of road work in Sijunjung Regency, while a qualitative approach uses research and literature studies such as articles, journals, guidebooks and documents about the quality of road work. From the research results, it was found that the factors that influence the low quality of road work in Sijunjung Regency are Human Resources, Materials, Equipment, Finance, Work Methods and Environment. Meanwhile, the dominant factor that has the most influence is the material factor. Solutions that can be implemented include increasing control and supervision over the management and use of materials, as well as increasing the competence of workers and construction service businesses through outreach, technical guidance, education and training. In addition, it is necessary to provide sanctions or punishment in accordance with applicable regulations to contractors who are negligent in carrying out road work, so that irregularities do not occur again which will cause low quality of road work in the future.
Analisis Keterlambatan Proyek Konstruksi Bidang PSDA di Dinas PUPR Padang Pariaman Kurniawan, Rinto; Anif, Bahrul; Suherman, Hendra
Jurnal Ilmiah Rekayasa Sipil Vol 21 No 2 (2024): Oktober 2024
Publisher : Pusat Penelitian dan Pengembangan Masyarakat (P3M), Politeknik Negeri Padang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30630/jirs.v21i2.1347

Abstract

Pada Dinas Pekerjaan Umum Kabupaten Padang Pariaman unit kerja yang mengelola sumber daya air adalah Bidang Pengelolaan Sumber Daya Air (PSDA). Pada PSDA banyak ditemukan proyek irigasi yang terlambat. Adapun penyebab keterlambatan proyek irigasi tersebut rata-rata diakibatkan karena pengaruh cuaca yang buruk pada saat pelaksanaan pekerjaan, sehingga sering tertundanya bahkan terhentinya pekerjaan dilapangan. Tujuan dari penelitian ini yaitu untuk mendapatkan faktor apa yang menjadi penyebab keterlambatan pelaksanaan proyek konstruksi bidang PSDA di Dinas PUPR Padang Pariaman, faktor dominan dan solusi penanganan agar terhindar dari keterlambatan proyek pada masa yang akan datang. Metode penelitian yang digunakan yaitu metode penelitian secara kuantitatif yaitu dengan menyebar kusioner kepada para responden. Hasil penelitian yang dilakukan terdapat 6 faktor yang menjadi penyebab keterlambatan pelaksanaan proyek konstruksi bidang PSDA di Dinas PUPR Padang Pariaman yaitu faktor tenaga kerja, faktor karakteristik tempat (site characteristic), faktor manajerial (managerial), Faktor Lingkungan Kerja, faktor bahan (material), dan faktor Keuangan (financial).
FAKTOR KEBERHASILAN UTAMA PADA PEKERJAAN PROYEK KONSTRUKSI JALAN DI PROVINSI SUMATERA BARAT Fisher, Mart; Utama, Lusi; Anif, Bahrul
Rang Teknik Journal Vol 8, No 2 (2025): Vol. 8 No. 2 Juni 2025
Publisher : Fakultas Teknik Universitas Muhammadiyah Sumatera Barat

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31869/rtj.v8i2.6699

Abstract

The success of a project is the primary goal for companies engaged in construction services. The aim of this study is to identify the factors influencing the main success of contractors in road construction projects in West Sumatra Province and to propose solutions for improving contractor performance in future construction projects using the POAC method. This study employs a quantitative approach, utilizing questionnaires to collect data. The research results reveal six key factors affecting the primary success of contractors in road construction projects in West Sumatra Province: Physical Evidence, Reliability, Responsiveness, Assurance, Empathy, and Workforce factors.Keywords: Success, Project, Factors, POAC
Kajian Faktor Sumber Daya Manusia dalam Keterlambatan Proyek Jalan di Kabupaten Solok Selatan Wulandari, Telsa; Wardi, Wardi; Anif, Bahrul
Jurnal Civronlit Unbari Vol 10, No 1 (2025): April
Publisher : Universitas Batanghari

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33087/civronlit.v10i1.143

Abstract

A construction project can be said to be successful if it is completed on time, on budget and meets the specified quality. Many factors influence the success of a project, one of which is resource management. In the road construction project in South Solok Regency, the percentage of delays in completing the road project is relatively high in the medium-scale category. The purpose of the study was to identify human resource factors and dominant factors that cause delays in the implementation of road construction projects in South Solok Regency. This study will be conducted on a medium-scale road project from 2022 - 2023 on contractors who experienced delays in the implementation of road project work in South Solok Regency. In this study, purposive sampling techniques were used and questionnaires were distributed to respondents, then KMO and Bartlett tests, validity tests, reliability tests, MSA tests and rankings were carried out. The results of the analysis showed that the Project Manager, Site Manager, Site Engineer, and Executor factors were identified factors and this was proven by the analysis stages that had been carried out. The dominant factor causing delays in road construction projects in South Solok Regency based on the results of the ranking analysis, namely the Project Manager factor with an average value of 1.38519 with a standard deviation of 0.48093.