STUDY OF FACTORS CAUSING DELAYS IN BUILDING PROJECT IMPLEMENTATION IN PASAMAN DISTRICT Jamal, Akmal; Wardi, Wardi; Anif, Bahrul
Rang Teknik Journal Vol 7, No 2 (2024): Vol. 7 No. 2 Juni 2024
Publisher : Fakultas Teknik Universitas Muhammadiyah Sumatera Barat

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31869/rtj.v7i2.5064

Abstract

Very important for contractor For finish work appropriate time, because matter That will profitable for owners, contractors, consultants and other parties who play a role in activities. And vice versa lateness work will very influential to reputation contractor. Objective study that is For Identify factors determine factor become dominant reason lateness implementation project buildings in the district Pasaman. Method research used that is method study in a manner quantitative that is with spread questionnaire to para respondent. Results research conducted there are 9 factors reason delay that occurred on project building in the District Passover that is that is factor Power Work, factor Managerial, Monitoring Evaluation factors, factors implementation Occupation, factor Location, factor Other, factor Characteristics Place, factor Environment, factor Constraint Implementation.
ANALISIS KETERLAMBATAN PROYEK KONSTRUKSI JALAN YANG MENGAKIBATKAN PUTUS KONTRAK DI KEPULAUAN MENTAWAI Asril, Asril; Anif, Bahrul; Wardi, Wardi
SIGMA TEKNIKA Vol 8, No 2 (2025): SIGMATEKNIKA, VOL. 8, N0. 2, NOVEMBER 2025
Publisher : Fakultas Teknik, Universitas Riau Kepulauan

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33373/sigmateknika.v8i2.8338

Abstract

In the Mentawai Islands Regency, West Sumatra Province, Indonesia, during the 2019–2024 period, five road construction projects with contract values exceeding five billion rupiah (non-small qualified contractors) experienced critical delays that resulted in contract termination. The study aims to identify the factors causing delays in road construction projects that resulted in contract termination in the Mentawai Islands Regency, as well as to analyze the most influential dominant factors. The research method used a quantitative approach with a questionnaire instrument distributed to 127 respondents consisting of owners, consultants, and contractors. The sampling technique was purposive sampling, while data analysis was carried out using SPSS software with multivariate statistical methods. The results of the study indicate that there are ten main factors that influence delays in road construction projects resulting in contract termination, namely managerial factors (11.087%), labor (9.164%), equipment (8.903%), supply chain management (7.953%), financial (7.505%), design (7.370%), weather and natural disasters (6.494%), geography and environment (5.128%), procurement of materials (4.506%), and payment (4.107%). The dominant factor causing delays in road construction projects resulting in contract termination in the Mentawai Islands is managerial factors with a contribution of 11.087%.