Claim Missing Document
Check
Articles

Found 2 Documents
Search
Journal : Nuansa Informatika

SISTEM PENDUKUNG KEPUTUSAN PEMBERIAN CUTI KARYAWAN (Studi Kasus PT.Duta Hadir Kuningan) Bambang Wahyudi; Yesi Agustina
NUANSA INFORMATIKA Vol 6, No 02 (2011)
Publisher : FKOM UNIKU

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.25134/nuansa.v6i02.53

Abstract

Vacation form work is generally called by the term ‘cuti’. ‘Cuti’ or vacation form work provided by the company, agency or institution to its employees. The company delivers cuti as a form of refreshment for the employess to be not stressed and bored at work. Based on the interest, then the vacation form work be come a right of employees must be provided by the company. Many companies already provided the vacation form work to it’s employees, but the process of granting it is still using manual mechanisms. PT.Duta Hadir is one of the companies located in kuningan regency still use the manual way in giving the vacation of work of its employees. The process of granting the vacation runs manually, so it has many problems in entering data and delays in the licensing process itself. This decision support system using the method forward chaining. Forward chaining method is process tracking which begins by displaying a collection of data or facts that convincingly towards the final conclusion. Concept forward chaining method is first beginning of the input information (if), then to the conclusion (then) and can be modeled as follows, IF (information input), THEN (conclusion) input information, can be data, evidence, findings or observations. This application uses PHP as the programming language and MySQL as database builder, as well as the design of the built using RUP methodology. Application of decision support systems provider employee’s vacation helps Human Resources to manage employee’s vacation, and they could manage the system more effectively and efficiently.Key words :employees’ vacation, decision support system, forward chaining, Web
IMPLEMENTASI METODE CPM (CRITICAL PATH METHOD) MODEL AOA (ACTIVITY ON ARCH) PADA APLIKASI PENJADWALAN PROYEK Bambang Wahyudi; Dadang Hamdani; Gigin Ginanjar
NUANSA INFORMATIKA Vol 5, No 02 (2011)
Publisher : FKOM UNIKU

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.25134/nuansa.v5i02.121

Abstract

Planning and scheduling of project activities are very important because they can be used as the base for implementing the project in order to finish the projects by the optimal time. The level of the estimated project duration is determined by the level of the estimated duration of each activity in the project. Therefore, analysis of the optimization project duration is needed to know how long a project is completed and for the possibility of accelerating project duration. One popular technique in scheduling is a network planning. Network planning is one of the models that is widely used in the project implementation, which can provide information about the activities in the network diagram. Critical path method with activity on arch model is one of the techniques in network planning. Critical path is a path of critical activities concerning in project scheduling, because the project is late or does not depend on the activities in the critical path. However, in determining the critical path, it is always found the complicated calculations, so in this paper the author will make a software using the critical path method with activity on arch model which will help simplifying the calculation of the critical path and to build network diagram. By using the software, it is hoped that it can help analizing project scheduling. So that it becomes easier for calculating the critical activities of the project and we can see the duration of activities, such as result of forward pass and backward pass. This software is capable to present a network diagram of the project.