Claim Missing Document
Check
Articles

Studi Potensi Energi Terbarukan dengan Solar Rooftop On-Grid pada Gedung Business and Science Center (BSC) Nita Nurdiana; M. Saleh Al Amin; Emidiana; Yudi Irwansi; Febri Pratama Putra
Jurnal Surya Energy Vol. 9 No. 2 (2025)
Publisher : Teknik Elektro, Universitas Muhammadiyah Palembang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32502/jse.v9i2.433

Abstract

Penelitian ini menganalisis potensi teknis dan ekonomi penerapan sistem Pembangkit Listrik Tenaga Surya (PLTS) On-Grid di Gedung Business and Science Center (BSC) Universitas PGRI Palembang. Studi dilakukan dengan perangkat lunak PVsyst versi 7.4 menggunakan konfigurasi sistem yang terdiri dari 55 panel surya berkapasitas 250 Wp, dengan total kapasitas 13,6 kWp. Hasil simulasi menunjukkan sistem ini dapat menghasilkan energi sebesar 48,96 kWh per hari, mencukupi kebutuhan energi harian aula gedung sebesar 48,93 kWh. Dengan biaya investasi sebesar Rp 200.500.000, sistem ini memiliki masa pengembalian investasi sekitar 6 tahun, penghematan bersih tahunan Rp 33.740.800, serta nilai Net Present Value (NPV) sebesar Rp 131.461.417. Efisiensi energi yang dihasilkan optimal dengan mempertimbangkan potensi iradiasi matahari rata-rata 4,527 kWh/m²/hari di Kota Palembang. Hasil penelitian membuktikan bahwa PLTS On-Grid tidak hanya mendukung keberlanjutan lingkungan, tetapi juga memberikan manfaat ekonomi jangka panjang bagi pengelola gedung.
Evaluasi Sistem Proteksi Motor Induksi 3 Fasa sebagai Mesin Bubut di CV. Multi Teknik Perkasa (MTP) Ahmad Dahlan; M. Saleh Al Amin; Perawati Perawati; Yudi Irwansi
Jurnal Teknik Mesin, Industri, Elektro dan Informatika Vol. 3 No. 3 (2024): September : JURNAL TEKNIK MESIN, INDUSTRI, ELEKTRO DAN INFORMATIKA
Publisher : Lembaga Pengembangan Kinerja Dosen

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.55606/jtmei.v3i3.4163

Abstract

Cv.Multi Teknik Perkasa (MTP) is an individual company which operates in the field of tools, commonly known as lathes. This company handles repair, cutting and scraping of working media such as iron, steel and others. CV. Multi Teknik Perkasa (MTP) uses a 3 phase induction motor for each production process. One of the lathe driving machines used is a 3 phase 380V induction motor with 6KVA power. This induction motor has a Mini Circuit Breaker (MCB), Contactor, and Thermal Overload Relay (TOR) protection system, which functions as an overload controller so that the electric motor is not easily burned or damaged due to overload. For Mini Circuit Breaker (MCB), which in accordance with the standards of the National Electrical Manufactures Association (NEMA). According to research results, the correct size is 25 A while the installed one is 20 A, which of course is not appropriate. For contactors, which are installed at 65 A while the analysis results are 12 A, the three-phase induction motor protection system must be updated or improved. Previously using DiazedFuse (fuse), replaced with a contactor with a current setting of 12 A, so that the motor can avoid being damaged or burned due to the load. Moreover, to find out the power requirements of the induction motor to carry out the turning process, you need the tools to do it, including amper pliers, thermogun, tachometer, so the motor power for turning without load is 5.5A while with a 0.5mm tire the motor power increases to 6A and the maximum load limit is 1mm turning motor power 12A.