Claim Missing Document
Check
Articles

Found 15 Documents
Search

Indonesian Pharmaceutical Companies: Capital Structure, Business Risk, Company Value and Firm Size as A Moderating Variable Analysis Anisah Anisah; Moh. Ali Murad; Asriadi Asriadi; Suryadi Samudra; Dilah Magfirah
International Journal of Social Service and Research (IJSSR) Vol. 3 No. 1 (2023): International Journal of Social Service and Research (IJSSR)
Publisher : CV. Ridwan Publisher

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.46799/ijssr.v3i1.223

Abstract

This study looks into how firm size affects the relationship between capital structure and business risk in determining firm value. This study makes use of panel data from ten pharmaceutical companies sourced from their annual reports from 2015 to 2021. The data analysis method employed the Structure Equation Modeling (SEM) method via the Partial Least Squares (PLS) method with WarpPLS 6.0 software. According to the findings of this study, capital structure had no effect on firm value, whereas business risk had a significant negative effect on firm value. Only firm size can moderate the relationship between capital structure and firm value. Thus, managers' primary concern in order to maximize the value of pharmaceutical companies in Indonesia is to ensure that the amount of income received by the company remains stable in order to avoid income volatility, which can trigger increased business risk for the company. Furthermore, when developing a policy to determine how much debt or equity is used to finance the company in order to maximize the company's value, the size of the company must be considered.
INVESTIGASI DAN PENILAIAN STRUKTUR BANGUNAN GEDUNG INDOMARET BASUKI RAHMAT KOTA SORONG A. Didik S. Purwantoro; Asriadi; M. N. Fajar
Jurnal Teknik Sipil : Rancang Bangun Vol. 9 No. 1 (2023): April 2023
Publisher : Universitas Muhammadiyah Sorong

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33506/rb.v9i1.2332

Abstract

Kegagalan struktur adalah kondisi bangunan yang apabila ditinjau dari segi teknis tidak berfungsi secara keseluruhan, terjadi apabila tidak mengikuti standart perencanaan dan pelaksanaan, kesalahan input data preliminary design. Metode yang digunakan dalam penelitian ini adalah observasi dan Structural Analysis, Concrete Hammer Test (CHT), Dutch Cone Penetrometer Test (DCP-T). Hasil penelitian menunjukkan, mutu beton (fc’) struktur pelat lantai 100% tidak terpenuhi, struktur portal kolom dan struktur balok rata-rata 40.95% mutu beton (fc’) tidak terpenuhi, Soil-test diperoleh nilai conus resistance (qc) 5-10 kg/cm2 digolongkan jenis tanah lunak. Kapasitas dukung tanah dipakai nilai  = 44,73 kN/m2, tegangan tanah maksimum pada dasar fondasi = 234,844 kN/m,  > , tidak aman. Rekomendasinya antara lain pengurangan beban, titik-titik pondasi lebar foot-plat ditarik menjadi plat menerus mengikuti balok sloof, dan dilakukan improvement soil atau reinforced soil dengan consolidation grouting atau jet grouting.
DAMPAK AKIBAT AKTIFITAS PENAMBANGAN PASIR DI KOTA SORONG Asriadi Asriadi; Irwan Ridwan Rahim; Abdul Rahman Djamaluddin
JURNAL INOVASI PENDIDIKAN DAN SAINS Vol 4 No 1 (2023): April
Publisher : Lembaga Penelitian dan Pengabdian kepada Masyarakat (LPPM) Universitas Nahdlatul Wathan Mataram

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.51673/jips.v4i1.1472

Abstract

Pasir merupakan salah satu kebutuhan pokok konstruksi, kebutuhannya pun sangat tinggi permintaannya dalam kegiatan pembangunan Kota Sorong antara lain pekerjaan struktur dan infrastruktur, salah satu material yang pokok adalah pasir. penelitian ini bertujuan menganalisis seberapa besar dampak ekonomi terhadap masyarakat akibat kegiatan penambang pasir dan memberikan usulan pengelolaan penanggulangan dampak banjir terhadap kegiatan penambangan pasir di Kota Sorong khususnya wilayah km 10 Kampung Bugis. rancangan penelitian ini dalam bentuk program kerja yang disusun untuk memudahkan dalam melaksakan penelitian secara efektif dan efisien. dalam tahapan ini akan dilakukan aerialgraphy dan overlay peta wilayah daerah tambang sehingga dapat teridentifikasi seberapa besar luasan tambang dari tahun ke tahun, tahapan dalam penelitian dikelompok dari studi peRpustakaan, pengumpulan data, survey dan observasi lapangan. serta teknik analisis data menggunakan metode eclac dan metode ahp. hasil penelitian ini menunjukkan bahwa terjadi peningkatan luas galian menjadi 60% sehingga area genangan banjir meluas menjadi 88%, terjadi kenaikan biaya setiap tahun, kenaikan tertinggi pada tahun 2016, dimana besar biaya kerusakan dan kerugian sebesar Rp 12,6 milyar dengan total komulatif yang dicapai sampai dengan tahun 2016 adalah sebesar Rp. 77,14 milyar. dalam upaya pengelolaan penanggulangan banjir didapat 5 kriteria upaya pengelolaan antara lain biaya,ketersediaan,pelaksanaan,waktu dan ramah lingkungan. dengan 3 alternatif yaitu perkuatan hukum, pembangunan fisik dan rekayasa sosial.
Optimalisasi Biaya dan Waktu Pekerjaan Perumahan Griya Pekerja Sejahtera Widodo, Slamet; Asriadi, Asriadi; Sutiono, Wilis; Desembardi, Faried; Fauzi, Hafidz N.; Fajar, Muhammad Nur
Konstruksia Vol 15, No 1 (2023): Jurnal Konstruksia Vol 15 No. 1 Tahun 2023
Publisher : Universitas Muhammadiyah Jakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24853/jk.15.1.27-33

Abstract

Distrik Malasilen merupakan salah satu distrik di Kota Sorong yang termasuk dataran tinggi dan daerah pengembangan di Kota Sorong, daerah ini mulai berkembang salah satunya proyek pembangunan perumahan subsidi yang sementara ini berkembang sangat pesat di Kota Sorong. Hal ini memaksa pengusaha untuk memikirkan bagaimana menyelesaikan proyek dan mengoptimalkan biaya dalam jangka waktu yang relatif singkat. Dalam penelitian ini menggunakan aplikasi Primavera P6 dengan memasukkan RAB (Rencana Anggaran Biaya), durasi pekerjaan dan Analisa harga satuan. Metode yang digunakan yaitu Time Cost Trade Off dengan penambahan jam kerja 1 dan 2 jam. Hasil dari penelitian ini biaya paling optimum didapat pada penambahan dua jam kerja dengan biaya Rp.147.788.791,03 terjadi pengurangan biaya sebesar Rp.5.619.053,6 dari biaya total normal sebesar Rp.153.407.844,63 dipersingkat 19 hari dari biasanya 97 hari menjadi 78 hari. Satu jam kerja akan mengurangi waktu penyelesaian proyek sebesar 11 hari dari biasanya 97 hari menjadi 86 hari, sehingga mengurangi biaya sebesar Rp 3.952.267,54 dari biasanya sebesar Rp 153.407.844,63. 149 455 577 ,09.
PERSEPSI MANFAAT DAN KEPERCAYAAN MASYARAKAT TERHADAP KEPUTUSAN BERTRANSAKSI NON TUNAI MENGGUNAKAN QRIS Muis, Yuyun Ramadhani; Santi, Ira Nuriya; Bachri, Syamsul; Asriadi, Asriadi
Jurnal Inovasi Bisnis Indonesia (JIBI) Vol. 1 No. 4 (2024): June
Publisher : PT. Tangrasula Tekno Kreatif

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.61896/jibi.v1i4.49

Abstract

Abstrak Sistem pembayaran merupakan salah satu pilar penopang stabilitas sistem keuangan pada suatu Negara. Kemajuan teknologi telah membawa banyak perkembangan pada sistem pembayaran bahkan menggeser peran uang tunai (currency) sebagai alat pembayaran menjadi non tunai yang dianggap lebih efisien penggunaannya. Penelitian ini bertujuan untuk melihat preferensi masyarakat Provinsi Sulawesi Tengah dalam mengambil keputusan bertransaksi non-tunai menggunakan QRIS melalui beberapa faktor yang dapat mempengaruhi yaitu persepsi manfaat dan kepercayaan. Metode yang digunakan adalah metode kuantitatif dengan menggunakan analisis regresi linear berganda, uji asumsi klasik pengujian hipotesis dan koefisien determinasi. Jumlah sampel pada penelitian adalah 100 responden. Berdasarkan hasil analisis dari regresi linear berganda diperoleh kesimpulan bahwa variabel Persepsi Manfaat dan kepercayaan berpengaruh positif dan signifikan terhadap Keputusan Penggunaan transaksi non tunai menggunakan QRIS. Implikasi dari penelitian ini sangat relevan bagi pihak pelaku bisnis online, penyedia jasa sistem pembayaran dan manajemen agar mempertimbangkan faktor persepsi manfaat dan kepercayaan untuk meningkatkan layanan transaksi non tunai. Kata Kunci: Persepsi Manfaat, Kepercayaan, Sistem Pembayaran, non tunai. Abstract The payment system is one of the pillars supporting the stability of the financial system in a country. Technological advances have brought many developments to the payment system and even shifted the role of cash (currency) as a means of payment to non-cash which is considered more efficient to use. This study aims to look at the preferences of the people of Central Sulawesi Province in making non-cash transaction decisions using QRIS through several factors that can influence, namely perceived benefits and trust. The method used is quantitative method using multiple linear regression analysis, classical assumption test hypothesis testing and coefficient of determination. The number of samples in the study were 100 respondents. Based on the results of the analysis of multiple linear regression, it is concluded that the perceived benefits and trust variables have a positive and significant effect on the decision to use non-cash transactions using QRIS. The implications of this research are very relevant for online business actors, payment system service providers and management to consider the perceived benefits and trust factors to improve non-cash transaction services. Keywords: Perception of Benefits, Trust, Payment Systems, non-cash.
EVALUATION OF THE WASTE WATER TREATMENT INSTALLATION OF THE SELE BE SOLU REGIONAL PUBLIC HOSPITAL SORONG CITY Dwangga, Mierta; Asriadi, Asriadi; Noor Irawan, Mochammad Aziz
BIOLINK (Jurnal Biologi Lingkungan Industri Kesehatan) Vol. 11 No. 1 (2024): Biolink Agustus
Publisher : Universitas Medan Area

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31289/biolink.v11i1.12499

Abstract

The Hospital Wastewater Treatment Plant (WWTP) is a system of hospital wastewater treatment designed based on the characteristics of waste water entering from several sources of waste discharge. The research location is at Sele Be Solu Regional Hospital, Sorong City, West Papua. The land owned by Sele Be Solu Regional Hospital is approximately 120,000 m2, and the number of beds is 158. This study uses laboratory tests to measure the quality of wastewater and the wastewater treatment plant. From the calculated results, the maximum discharge produced by Sele Be Solu Regional Hospital is 4343 m3/month. With the actual pollution load for the BOD parameters of 26.36 kg/month, COD of 157.98 kg/month, and TSS of 38,343 kg/month, all three are greater than the maximum pollution load allowed, namely for the BOD of 12,708 kg/month, COD of 105.9 kg/month, and TSS of 211.8 kg/month. The quality of wastewater from the Sele Be Solu Regional Hospital's wastewater treatment plant in 2017, which was tested by PT. Kehati Lab Indonesia, showed that all parameters met the quality standard requirements of the Minister of Environment Regulation Number P.68 of 2016. Meanwhile, the quality of processed wastewater in 2019 and 2021 showed that the parameters for Coli Group germs exceeded the permitted quality standards, while other parameters still meet the quality standards.
Perbandingan Metode Percepatan Pekerjaan Terhadap Biaya Langsung dan Biaya Tidak Langsung. Desembardi, Faried; Nur Fajar, Muhammad; Widodo, Slamet; Asriadi, Asriadi; Yon Saputri, Lintang Tiara
Konstruksia Vol 16, No 1 (2024): Jurnal Konstruksia Vol 16 No. 1 Tahun 2024
Publisher : Universitas Muhammadiyah Jakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24853/jk.16.1.58-66

Abstract

Pada pelaksanaan proyek kontruksi seringkali terjadi keterlambatan penyelesaian kegiatan proyek dari waktu yang telah ditetapkan, maka untuk itu diperlukan penerapan manajemen proyek pada sebuah proyek konstruksi agar proyek dapat selesai tepat waktu bahkan lebih cepat dari waktu yang telah ditentukan. Penelitian ini bertujuan untuk mengoptimalkan waktu dan mengendalikan biaya proyek konstruksi. Dalam penelitian ini menggunakan software Primavera p6 dengan memasukkan RAB (Rencana Anggaran Biaya), durasi pekerjaan dan AHSP (Analisa Harga Satuan Pekerjaan). Metode yang digunakan yaitu TCTO (Time Cost Trade Off) dengan penambahan jam kerja 3 dan 5 jam serta penambahan sumber daya (tenaga kerja). Hasil penelitian menunjukkan bahwa penggunaan Primavera p6 berhasil meningkatkan efisiensi waktu penyelesaian proyek sebesar 34,65% dan mengurangi biaya tidak terduga sebesar 1,40%. Dimana penyelesaian proyek konstruksi yang berdurasi 228 hari, setelah dilakukan percepatan dengan penambahan 3 jam dan 5 jam kerja menjadi 168 hari, dan dengan percepatan penambahan tenaga kerja menjadi 149. Dengan biaya proyek awal sebesar Rp. 7.201.201.201,21 dengan alternatif percepatan 3 jam kerja menjadi Rp. 7.170.712.385,64 , dengan alternatif penambahan 5 jam kerja menjadi Rp. 7.263.851.179,14 dan dengan alternatif penambahan tenaga kerja menjadi Rp. 7.100.525.428,99.
Studi Pemetaan Tingkat Kerusakan Jalan Akibat Air Genangan Pada Ruas Di Jalan Jendral Sudirman Di Kota Irwan; Asriadi; Mierta Dwangga; A. Didik S. Purwantoro
Jurnal Ilmiah Teknik Sipil (JIMATS) Vol. 2 No. 1 (2023): Jurnal Ilmiah Teknik Sipil (JIMATS)
Publisher : Universitas Muhammadiyah Sorong

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33506/jimats.v2i01.2212

Abstract

Pada Ruas Jalan Jendral Sudirman segmen 1 (depan SMA 3 Kota Sorong) dan Segmen 2 (Depan SPBU Jalan Baru) sering terjadi kerusakan jalan akibat genangan air yang sering terjadi pada badan jalan. Metode Penelitian ini di mulai dari pengumpulan data-data yang diperoleh dari lokasi penelitian dengan survei visual, Tahap 1 penelitian ini di mulai dari mengukur panjang jalan yang akan di teliti, Tahap 2 survei kerusakan yaitu untuk mengetahui jenis-jenis kerusakan jalan dan mengukur jenis -jenis kerusakan jalan dan mengukur dimensi kerusakan jalan dan me dokumentasi segala jenis kerusakan jalan..Peneltian ini bertujuan untuk mitigasi tingkat kerusakan jalan akibat genangan air di kota sorong dan memberikan alternatif penanganan kerusakan jalan akibat genangan air. Alternatif penanganan kerusakan jalan di jalan Jendral Sudirman. Segmen 1 Alternatif penanganan kerusakan jalan pada segmen I di buat dalam modifikasi desain atau saluran resapan menggukan paving block. Segmen 2 perlu adanya perbaikan secara berkala untuk penanganan jalan yang rusak akibat genangan air.
Kepuasan Pelanggan Rumah Makan Sidrap Kota Palu Dari Aspek Suasana, Harga, Keragaman Menu dan Waktu Tunggu Ladong, Fadhilah S.; Wahyuningsih, Wahyuningsih; Muzakir, Muzakir; Asriadi, Asriadi
Journal of Economic, Management, Accounting and Technology (JEMATech) Vol 8 No 1 (2025): Februari
Publisher : Fakultas Teknik dan Ilmu Komputer, Universitas Sains Al-Qur'an (UNSIQ) Wonosobo

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32500/jematech.v8i1.8761

Abstract

Industri kuliner semakin berkembang dengan banyaknya pilihan yang membuat pelanggan lebih selektif. Semakin ketatnya persaingan industri kuliner, yang memaksa setiap usaha untuk terus berinovasi menghadapi tantangan dan memenuhi ekspektasi pelanggan yang terus berkembang. Hal ini membuat Rumah Makan Sidrap perlu memahami faktor-faktor yang memengaruhi kepuasan pelanggan, seperti suasana, harga, keragaman menu dan waktu tunggu untuk tetap kompetitif. Penelitian ini penting untuk memberikan wawasan strategis yang dapat meningkatkan layanan dan daya saing di pasar. Tujuan penelitian ini adalah untuk mengukur seberapa pengaruh suasana, harga, keragaman menu, dan waktu tunggu terhadap kepuasan pelanggan di Rumah Makan Sidrap Kota Palu. Studi ini menggunakan metode kuantitatif dan teknik purposive sampling dalam pemilihan sampel sebesar 100 responden. Data dianalisis menggunakan metode Regresi Linier Berganda melalui perangkat lunak SPSS. Hasil analisis menunjukkan adanya pengaruh secara simultan suasana, harga, keragaman menu, dan waktu tunggu terhadap kepuasan. Serta secara parsial menunjukkan bahwa harga, keragaman menu, dan waktu tunggu memiliki pengaruh terhadap kepuasan pelanggan, sedangkan suasana tidak memiliki pengaruh. Waktu tunggu ditemukan sebagai faktor paling dominan memengaruhi kepuasan pelanggan. Penelitian ini merekomendasikan peningkatan efisiensi pelayanan, inovasi dalam menu, serta pengelolaan harga yang kompetitif dalam meningkatkan kepuasan pelanggan. Selanjutnya, diharapkan untuk terus memperhatikan kepuasan pelanggan, terutama waktu pelayanan yang efisien, keragaman menu yang inovatif, dan harga kompetitif. Serta, terus mengevaluasi aspek lainnya, seperti suasana, meskipun dalam penelitian ini tidak ditemukan pengaruh, tetapi berguna menciptakan pengalaman. Dengan mengoptimalkan faktor-faktor tersebut, usaha kuliner dapat meningkatkan kepuasan serta kesetiaan pelanggan.
PERENCANAAN TEKNIS PEMBANGUNAN JEMBATAN SUNGAI KLAIGI MAIBO KABUPATEN SORONG PROVINSI PAPUA BARAT DAYA Asriadi, Asriadi; Didik Setyo Purwantoro; Slamet Widodo
Journal of Innovation Research and Knowledge Vol. 4 No. 9: Februari 2025
Publisher : Bajang Institute

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.53625/jirk.v4i9.9835

Abstract

Perencanaan teknis pembangunan Jembatan Sungai Klaigi di Maibo, Kabupaten Sorong, barat daya Papua, bertujuan untuk meningkatkan konektivitas transportasi dan mendukung pengembangan ekonomi lokal. Kajian tersebut mencakup analisis topografi, geoteknik, dan hidrologi untuk merancang jembatan yang aman dan efektif sesuai dengan kondisi geografis setempat. Perhitungan struktur dilakukan untuk memastikan jembatan mampu menahan beban dan tahan terhadap kondisi cuaca ekstrim. Selain itu, rencana tersebut juga mempertimbangkan potensi dampak pembangunan terhadap lingkungan dan sosial serta mengembangkan strategi mitigasi yang diperlukan. Dengan demikian, konektivitas antar wilayah diharapkan dapat ditingkatkan, arus barang dan manusia diperlancar, serta pertumbuhan ekonomi di wilayah barat daya Papua akan terdorong.