Claim Missing Document
Check
Articles

Found 7 Documents
Search

Sosialisasi Peningkatan Pemahaman Keselamatan dan Kesehatan Kerja (K3) sebagai Antisipasi Kecelakaan Kerja Rezqi Malia; Raina Parmitalia Dnda; Alvisyahri; Safrika
SEWAGATI: Jurnal Pengabdian Masyarakat Indonesia Vol. 2 No. 2 (2023): juni : Jurnal Pengabdian Masyarakat Indonesia
Publisher : BADAN PENERBIT STIEPARI PRESS

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.56910/sewagati.v2i2.585

Abstract

Badan Penyelenggara Jaminan Sosial (BPJS) Ketenagakerjaan mencatat, jumlah kecelakaan kerja di Indonesia sebanyak 265.334 kasus sejak Januari-November 2022. Jumlah tersebut naik 13,26% dibandingkan tahun 2021 yang sebesar 234.270 kasus. Kemenaker mendorong sosialisasi untuk meningkatkan kesadaran pengusaha, tenaga kerja, dan masyarakat, sehingga memiliki kompetensi dan kewenangan bidang K3. Oleh sebab itu dilakukan sosialisasi peningkatan pemahaman keselamatan dan kesehatan kerja (K3) sebagai antisipsi kecelakaan kerja yang diberikan kepada mahasiswa yang akan mengikuti program magang Merdeka Belajar-Kampus Merdeka dan mahasiswa praktek lapangan pada proyek Tol SIBANCEH (Sigli-Banda Aceh). Alur pelaksanaan pengabdian yang dilakukan di Universitas Ubudiyah Indonesia, yaitu sosialisasi, brainstroming, dan tanya jawab mengenai topik ini. Kegiatan ini berjalan dengan lancar. Para peserta kegiatan pun sangat antusias mengikuti kegiatan ini. Hal ini dapat dilihat pada saat sesi terakhir, yaitu sesi tanya jawab, para peserta banyak yang ingin mengetahui lebih lanjut mengenai Keselamatan dan Kesehatan Kerja (K3) sebagai antisipasi kecelakaan kerja serta resiko dan bahaya apa saja yang akan dihadapi pada proyek Tol SIBANCEH.
Analysis Server Security Assessment of Staffing Management Information System Using the NIST SP 800-115 Method at UIN Ar-Raniry Banda Aceh Irfan Murti Raazi; Malahayati Malahayati; Basrul Basrul; Rezqi Malia; Mulkan Fadhli
Circuit: Jurnal Ilmiah Pendidikan Teknik Elektro Vol 8, No 1 (2024)
Publisher : PTE FTK UIN Ar-Raniry

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.22373/crc.v8i1.20808

Abstract

Ar-Raniry State Islamic University management information system has been implemented based on technology. It becomes vulnerable to attacks brought on by weaknesses (vulnerabilities). The degree to which institutions are able to improve their access to authority inside the system is gauged by this research. To evaluate the server's dependability based on confidentiality, integrity, and availability, penetration testing is necessary. The NIST SP 800-115 approach, which comprises of four testing stages—planning, discovery, attack, and reporting—is used to conduct the server security assessment. The findings demonstrate the Security Management Information System contains nine vulnerabilities in various ways with varying improvements. Two of these vulnerabilities are classified as high threat: DNS Server Spoofed Request Amplification DDoS by blocking access from the public network or rejecting the query; and Interception Attack by enhancing the SSL/TLS protocol through a stunnel. The remaining seven vulnerabilities are classified as medium threat. However, Ar-Raniry's campus server vulnerability level is categorized as medium threat
Pemanfaatan Kotoran Hewan Sebagai Pupuk Kompos Untuk Tanaman Obat dan Sayur-Sayuran Malahayati Malahayati; Rezqi Malia; Safrika Safrika; Khaleed Alhamzi; Tri Sutrisno; Farhan Abad; M. Yoga Agustiranda; Baqiatush Shalihat; Salma Auliannisa; Taria Adila; Catur Putri Khairun Nisa
SEWAGATI: Jurnal Pengabdian Masyarakat Indonesia Vol. 3 No. 2 (2024): Juni: Jurnal Pengabdian Masyarakat Indonesia
Publisher : BADAN PENERBIT STIEPARI PRESS

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.56910/sewagati.v3i2.1469

Abstract

One of the places in the Kuta Baro sub-district, Aceh Besar Regency, Aceh Province, is Lambunot Paya Village. Due to Lambunot Paya village's location in a rice field settlement, the majority of the population makes their living as farmers. The surrounding community does not give enough attention to a number of issues, including the problem of freed cattle, which results in an abundance of animal waste in the area, according to the THEMATIC Community Service Lecture (KPM) of the Faculty of Science and Technology (FST) UIN Ar-Raniry, which was held for 40 days in Lambunot Paya Village. During the work program implementation phase, students complete a number of agreed-upon work programs based on their respective scientific disciplines. One such program involves teaching the residents of Lambunot Paya Village science through hands-on compost fertilizer production. The pupils' next work program involves utilizing processed fertilizer to sow vegetables and toga plants.
Studies of Level of Service (LOS) at Signalized Intersection With Mix Traffic Flow Alvisyahri, Alvisyahri; Malia, Rezqi; Dinda, Raina Parmitalia; Idris, Fadli; Rahman, Aulia; Tripoli, Bambang; Farizal, Teuku
Jurnal Teknik Sipil dan Teknologi Konstruksi Vol 9, No 2 (2023): Jurnal Teknik Sipil dan Teknologi Konstruksi
Publisher : Universitas Teuku Umar

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.35308/jts-utu.v9i2.8378

Abstract

One of the signalized intersections with four approaches is the BPKP’s intersection at Banda Aceh.  The intersection will be analyzed in the current condition and remodeled using the software SIDRA intersection 8.0. This Software can choose a predetermined minimum capacity for each little movement. Utilizing a video from a collected in the study area, the institute provided the information. Data from a video included vehicle volume, downstream distances, upstream distances, and negotiation distances, as well as transit time. in its current condition. The total flow of demand is 1060 pcu/h. degree of saturation is 1,406, and level of service is F. The remodel of this intersection is analyze the signalized intersection's traffic light cycle time. It is necessary to be able to handle the current that enters the intersection. Total flow of demand in remodel condition of BPKP's intersection at Banda Aceh is 1060 pcu/h, degree of saturation is 0,765, and level of service is C.
OPTIMIZATION OF DELAY AT INTERSECTION IN ANTICIPATE STUCK ON THE TRAFFIC BY USING SOFTWARE SIDRA INTERSECTION 8.0 (CASE STUDY : SIMPANG BPKP BANDA ACEH) Malia, Rezqi; Dinda, Raina Parmitalia; Alvisyahri, Alvisyahri; Chaira, Chaira
Journal of Civil Engineering Vol 38, No 2 (2023)
Publisher : Institut Teknologi Sepuluh Nopember

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.12962/j20861206.v38i2.16860

Abstract

Simpang BPKP Banda Aceh is one of the signalized intersection with four approaches. so there are 16 crossing, 8 diverging, and 8 merging, between vehicles such as delay and congestion. This research aims to analysis the intersection in existing condition and redesign condition by using SIDRA Intersection 8.0 as a software. Software SIDRA Intersection 8.0 (analytical model) is a fixed minimum capacity for each minor movement is set by the user. The data was collected from institute from a video by using cctv at research area. The data from a video was include volume of vehicle, distances (upstrem, downstream, and negotiation) and travel time. In existing condition. Total demand flow is 1060 pcu/h. Approach delay 96,8 sec and level of service is F. The geometry for redesign condition is designing roundabout at that intersection. This assumption is made in the condition an unsignalized intersection.  Total demand flow in redesign condition at Simpang BPKP Banda Aceh is 1060 pcu/h. Approach delay 3,8 sec and level of service is A.
Sosialisasi Komunikasi Informasi dan Edukasi Daerah Rawan Bencana di SMP Negeri 2 Meureubo, Kabupaten Aceh Barat Rita Fazlina; Raina Parmitalia Dinda; Fadli Idris; Fachruddin Fachruddin; Astiah Amir; Veranita Veranita; Dewi Purnama Sari; Rezqi Malia; Dian Febrianti; Teuku Farizal; Alvisyahri Alvisyahri; Rinaldy Rinaldy; Zulyaden Zulyaden; Roni Agusmaniza; Aulia Rahman; Andi Yusra; Delfian Masrura
Jurnal Pengabdian Masyarakat: Darma Bakti Teuku Umar Vol 6, No 2 (2024): Juli-Desember
Publisher : Universitas Teuku Umar

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.35308/baktiku.v6i2.10427

Abstract

The Socialization of Communication, Information, and Education (KIE) for Disaster-Prone Areas in Aceh Barat Regency in 2024 aims to enhance public understanding and preparedness for various natural disasters, such as fires, earthquakes, and tsunamis. This activity is a collaboration between the Regional Disaster Management Agency (BPBD) of Aceh Barat and the Civil Engineering Department lecturers from the Faculty of Engineering, Universitas Teuku Umar. The socialization took place at SMP Negeri 2 Meureubo, with students as the main participants. The program included educational presentations about the risks and mitigation measures for different types of disasters and concluded with an earthquake simulation. The students participated enthusiastically, showing an intense interest in understanding how to protect themselves and respond correctly during a disaster. The earthquake simulation provided participants with the opportunity to practice their ability to react to emergency situations directly. The results of the activity demonstrated an increase in students' awareness and understanding of the importance of disaster preparedness. It is hoped that this program will be continuously implemented in other schools across Aceh Barat to help build a more resilient community in facing future disaster threats.
Faktor-Faktor Pemborosan Material Pekerjaan Arsitektural Pada Proyek Perumahan Griya Gigeh Putroe Ijo Rita Fazlina; Rinaldy Rinaldy; Raina Parmitalia Dinda; Zulyaden Zulyaden; Fadli Idris; Astiah Amir; Rezqi Malia
VOCATECH: Vocational Education and Technology Journal Vol 7, No 2 (2025): December
Publisher : Akademi Komunitas Negeri Aceh Barat

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.38038/vocatech.v7i2.274

Abstract

Abstract In residential construction, one of the major issues encountered is material waste, referring to the excessive use or presence of materials that do not add value to the construction work. There are several causes of material waste in construction, including the overconsumption of resources, the consolidation and expansion of technical specifications across multiple buildings, the reduction in material quality due to handling processes or mobilization errors, the deterioration of materials caused by weather conditions or improper storage, the lack of documentation for materials received and utilized, construction debris, as well as surplus materials resulting from preparation and finishing works.This study focuses on analyzing the factors that influence material waste in architectural works and identifying the dominant factors contributing to material waste in the architectural phase of the Griya Gigeh Putroe Ijo housing project, using the index method. Based on the research findings, the most dominant factor affecting material waste in architectural works is the variable Residual/Excess Material and Implementation, which consists of indicators such as worker errors, adverse weather conditions, unusable material offcuts, incorrect cutting dimensions, and inappropriate material orders resulting from inaccurate estimations. This is supported by the highest mean value of 4.86. The calculation using the index method indicates that the percentage value of the material waste index factor in architectural works is 92.04%, which falls within the 90%–100% range. Therefore, it can be categorized as Highly Influential in causing material waste in architectural activities within the Griya Gigeh Putroe Ijo housing development project, located in Meulaboh City, West Aceh Regency.Keywords:Waste; Material; Architectural Work; Housing Project; Griya Gigeh Putroe Ijo.Abstrak Dalam konstruksi perumahan, salah satu masalah yang ditemui adalah pemborosan material atau jumlah material yang berlebihan yang tidak memberikan nilai tambah pada pekerjaan. Terdapat beberapa macam penyebab pemborosan material dalam konstruksi, diantaranya meliputi konsumsi sumber daya yang berlebihan, penyatuan dan pengembangan spesifikasi teknis dari sejumlah bangunan, penurunan mutu material efek proses penanganan atau kesalahan mobilisasi, penurunan mutu material karena cuaca dan penyimpanan logistik yang tidak sesuai, kurangnya dokumentasi material yang diterima dan digunakan, limbah konstruksi, serta kelebihan material dari pekerjaan persiapan dan penyelesaian. Studi ini difokuskan pada analisis faktor-faktor yang mempengaruhi pemborosan material dalam pekerjaan arsitektur dan mengidentifikasi faktor dominan yang mempengaruhi pemborosan material dalam pekerjaan arsitektur pada proyek perumahan Griya Gigeh Putroe Ijo dengan menggunakan metode indeks. Berdasarkan hasil penelitian, faktor yang paling dominan mempengaruhi pemborosan material dalam pekerjaan arsitektur adalah variabel Sisa/Kelebihan Material dan Pelaksanaan, yang terdiri dari indikator-indikator seperti kesalahan yang disebabkan oleh pekerja, cuaca buruk, potongan material yang tidak dapat digunakan, kesalahan dimensi pemotongan, dan pemesanan material yang salah akibat tidak sesuaikebutuhan. Hal ini dibuktikan dengan nilai mean tertinggi sebesar 4,86. Perhitungan menggunakan metode Indeks menunjukkan bahwa nilai persentase faktor indeks pemborosan material dalam pekerjaan arsitektur adalah 92,04% dalam rentang skala 90%-100%, sehingga dapat dikategorikan sebagai Sangat Berpengaruh dalam menyebabkan pemborosan material dalam pekerjaan arsitektur pada proyek pengembangan perumahan Griya Gigeh Putroe Ijo di Kota Meulaboh, Kabupaten Aceh Barat.Kata Kunci:Pemborosan; Material; Pekerjaan Arsitektural; Proyek Perumahan; Griya Gigeh Putroe Ijo.