PONCOL SEMARANG STATION PARKING CAPACITY ANALYSIS Masykuroh, Ifana; Rizani, Mohammad Debby; Yudaningrum, Farida
International Journal of Sustainable Building, Infrastructure and Environment (IJOSBIE) Vol 4, No 2 (2023)
Publisher : Science and Technology Research Centre, Universitas PGRI Semarang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26877/ijosbie.v4i2.17626

Abstract

Currently, train stations are still busy for train passengers, parking capacity requirements are also being considered. This research is motivated by the problem of parking capacity, where there are several points that cause congestion and the direction of the parking lane is less than optimal at Poncol Semarang Station. In overcoming this problem, it is necessary to analyze parking capacity, evaluate problems and alternatives that can be used to solve existing problems. The method used in this research is a descriptive approach. This means that the data collected is not in the form of numerical data, but rather data originating from interview scripts, field notes, personal documents, researcher notes or memos and other official supporting documents which aim to enable researchers to describe the empirical reality behind the conditions that occur at train stations. Poncol Semarang. This research produces parking capacity at the station where the parking area can accommodate 554 SRP for cars and 241 SRP for motorbikes with the most parking accumulation getting the most results on Sunday, August 20 2023, namely in the morning at 06.00-09.00 WIB. Amounting to 157 motorbikes and 100 cars. Alternatives for handling traffic jams during peak parking hours are: moving the motorbike taxi post, improving the direction of the parking lane and moving entrance 2.Keywords: parking, capacity, alternative, station
Design of WWTP Anaerobic System at Tempe Factory JAMANTO, YOGA LESTIYANTO; Anggraini, Yossi Dewi; Rizani, Mohammad Debby; Ikhwanudin, Ikhwanudin
International Journal of Sustainable Building, Infrastructure and Environment (IJOSBIE) Vol 5, No 1 (2024)
Publisher : Science and Technology Research Centre, Universitas PGRI Semarang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26877/ijosbie.v5i1.16337

Abstract

The tempe industry is a food industry that has the potential to pollute the environment from the liquid waste it produces. Liquid waste from the  tempe processing process if it is immediately disposed of without going through the  management process first will have an impact on environmental pollution. In Semarang City, precisely in Gunung Pati District, there is a medium-scale tempe processing factory. So far, the tempe factory's liquid waste is directly disposed of into a ditch behind  the  factory without processing the liquid waste first. This  research  is a quantitative research presented in the form of  numbers     and then explained in the form of descriptions. From the results of the wastewater quality test, the pollutant parameters BOD = 369 mg/L; COD = 28,000 mg/L; TSS  =  0.991 mg/L; and pH = 4.3. According to the Regional Regulation of the Province of Central Java Number 5 of 2012 concerning Amendments to the Regional Regulation of the Province of Central Java Number 10 of 2004, this value still does not meet the requirements. The wastewater treatment plant that the  researchers are planning is in the form of a holding tank;  Equalization Tub; Anaerobic Digesters; Gas Holder; Initial Settling Tub; Anaerobic Biofilter using bioball filter media and steel nets as a barrier for bioballs where bacteria are grown; and Final Settling Tank. With an estimated effluent from the processing of BOD, COD, and TSS of 7.47225 mg/L; 189mg/L; and 0.00669 mg/L which means it meets the quality standard. From the planning  results, it was obtained that the total budget plan for planning the tempe factory wastewater treatment plant was Rp. 111.280.021,49.
PEMILIHAN MODA TRANSPORTASI OLEH MAHASISWA MENUJU KAMPUS 1 UNIVERSITAS PGRI SEMARANG Imawan, Heggy; Rizani, Mohammad Debby; Ariawan, Donny
Jurnal Teknik Sipil Giratory UPGRIS Vol 5, No 1: Juni 2024
Publisher : Universitas PGRI Semarang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26877/giratory.v1i1.19457

Abstract

Transportation activities themselves require facilities and infrastructure to be used by the community in carrying out transfer activities to their destination. Congestion is a transportation problem caused by the increasing volume of motorized vehicles without being matched by road capacity. The choice of transportation mode is a separate reason for each person and will reflect the interest of one of the modes of transportation itself. Data collection used an online questionnaire, namely via the Google form which was distributed randomly to students studying at Campus 1 Universitas PGRI Semarang. And data processing of travellers was analyzed using descriptive statistics, and vehicle modes were analyzed using a binary difference logit model with the help of multiple linear regression equations. And produce student profile data that has been obtained, that the dominant student is from the FTI faculty, the dominant one is traveling, namely semester 4. The sex is dominated by male, the dominant mode of vehicle used is motorcycle, and the dominant driver's license is SIM C. Characteristics of ability found that students travel based on the amount of pocket money, expenses or vehicle operations and considerations for traveling.
EFEKTIVITAS PENGGUNAAN JALUR LAMBAT PADA RUAS JALAN DR. LUKMONOHADI DAN DR. RAMELAN KUDUS DI KABUPATEN KUDUS Kholil, Munawar; Fauzan, Nur Maulana; Rizani, Mohammad Debby; Yudaningrum, Farida
Jurnal Teknik Sipil Giratory UPGRIS Vol 4, No 1: Juni 2023
Publisher : Universitas PGRI Semarang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26877/giratory.v4i1.16196

Abstract

Kudus street is a national road that connects Jakarta-Semarang-Surabaya-Banyuwangi, on this north coast road as the need for mobility of goods delivery or mobility of residents between cities. On the way Dr. Lukmonohadi – Dr. Ramelan has a slow lane on the left side of the road. The purpose of the existence of the slow lane on  road  DR. Lukmonohadi-Dr. Ramelan is to smooth traffic and reduce the fatality rate of  accidents in the fast lane, but due to very high shopping and industrial activities that can interfere with performance on these roads. The purpose of this research study is to review the effectiveness of the slow lane on the Dr. Lukmonohadi-Dr. The Ramelan is working properly or not. From the results of the analysis of traffic performance measured using the degree of saturation (DS) for Road  Dr. Lukmonohadi of 0.57, while Road  Dr. Ramelan is 0.61. From the level of congestion that can be obtained from the value of the side barriers that Dr. Lukmonohadi until Dr. Ramelan is included in the medium side resistance class (M). Based on the comparison of the accident rate from 2016-2021 the number of accidents continues to increase. The recommended recommendations are that it is necessary to repair and add road facilities such as repair of separator paint, faded road markings, addition of zebra crossings in pedestrian-congested locations and asphalt repairs on slow lanes because there is a lot of asphalt that is peeling and has holes, it is very dangerous for road users crossing it. Based on the results of the analysis for the slow lane, it can be concluded that the slow lane has been effective in facilitating traffic flow to reduce the number of accidents on the fast lane.
ANALISIS KEBUTUHAN PENANGANAN SIMPANG EMPAT JALAN KARANGAWEN KM-18 DI KABUPATEN DEMAK Irvan, Aditya Muhammad; Rizani, Mohammad Debby; Ariawan, Donny
Jurnal Teknik Sipil Giratory UPGRIS Vol 4, No 1: Juni 2023
Publisher : Universitas PGRI Semarang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26877/giratory.v4i1.16191

Abstract

The development of transportation in Demak Regency has an impact on increasing the movement of people, goods, and services. This is also very demanding for the improvement of transportation facilities and infrastructure in Demak Regency. This study aims to determine the performance of the uncited intersection of field conditions based on the 1997 MKJI guidelines, from the results of research in the field and the calculation of the Karangawen interchange interchange km 18 that the busiest traffic occurred on Sundays at 17.30-17.45 with a total traffic flow value of 1269 smp / hour, and obtained analytical data With an intersection capacity value of 1372.8 width of the interchange approach 2,821 fak tor road median adjustment with value 1, faktor city size adjustment with value 1, faktor road environment type adjustment by 0.85 faktor left turn adjustment by 1.170 faktor turn right adjustment by 0.233 Minor road ratio misrepresentation factor of 0.726 with a saturation degree of 0.924 interchange traffic delay of 56.54 seconds/smp,  main road traffic delay of 13.66 seconds/smp, minor road traffic delay of 61.67 seconds/smp, interchange geometry delay of 4, interchange delay of 60.54 Seconds/smp and queue opportunity for lower limit of 21.26 And queue opportunity for upper limit of 34.249.So the Karangawen km 18 intersection needs improvement at the intersection because it is seen from the value of the degree of saturation based on MKJI guidelines if the saturation value 0.75 then there is a need for interchange improvement.
ANALISIS STABILITAS TIMBUNAN DENGAN MEMBANDINGKAN BRANKAL DAN GEOTEKSTIL Adhi, Bagas Wahyu; Setiyanto, Beni; Kurniawan, Andri; Pristyawati, Tantin; Rizani, Mohammad Debby
Jurnal Teknik Sipil Giratory UPGRIS Vol 4, No 2: Desember 2023
Publisher : Universitas PGRI Semarang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26877/giratory.v4i2.18032

Abstract

Construction activities in road infrastructure development are never separated from earthworks which often become obstacles due to differences in land contours due to excavation and embankment work which is closely related to geotechnical engineering. Embankment and excavation are very interesting things to study because they are closely related to slope safety factors and require special handling. In this research, we examine the use of geotextiles by comparing the handling using safes on embankment stability using PLAXIS Version 8.2 software. The results of embankment stability analysis with safes, settlement at 1 year consolidation was 5.6 cm and settlement at 10 years consolidation was 5.7 cm. in accordance with applicable criteria. The results of the analysis using 2 layers of geotextile showed that the settlement at 1 year consolidation was 4 cm and at 10 years consolidation was 4.1 cm, which is in accordance with the applicable criteria.. Meanwhile, the results of the slope safety factor using bract treatment at 1 year consolidation were 1.475 and the safety factor for 10 year consolidation was 1.478, not in accordance with the design criteria of 1.5. The results of the safety factor using 2-layer geotextile treatment at 1 year consolidation was 1.853 and the safety factor for 10 year consolidation was 1.855, which is in accordance with the design criteria of 1.5.
ANALISIS FAKTOR-FAKTOR KETERLAMBATAN PADA PROYEK PEMBANGUNAN EXPAND & ENHANCEMENT NEUCENTRIX PUGERAN YOGYAKARTA MENGGUNAKAN SPSS Pinuji, Putri; Permata Suwandi, Putri Anggi; Rizani, Mohammad Debby
Jurnal Teknik Sipil Giratory UPGRIS Vol 6, No 1: Juni 2025
Publisher : Universitas PGRI Semarang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26877/giratory.v6i1.24096

Abstract

The 2023 Neucentrix Expand Enhancement Development Project Pugeran Yogyakarta is planned to last 19 weeks. However, there was a delay due to the large amount of additional work and new items that were not listed in the BoQ. This research aims to identify the main factors causing project delays. The data used came from a questionnaire and then factor analysis was carried out using SPSS. A total of 11 managerial team respondents filled out the questionnaire, producing 18 valid variables that were very reliable. The results of the analysis show 5 rankings of the main factors causing delays, namely: delayed payments have an impact on project delays; changes in costs due to additional work; less than optimal labor productivity; error in basic price estimation in the Cost Budget Plan; difficulty in finding materials and/or equipment due to certain specialties; submission and request for changes to completed work from the project owner; changes in work methods by contractors; lack of adequate workforce; owner's delay in making decisions; changes to the scope of work (SOW) during implementation; and lack of workforce discipline regarding attendance and attendance, which hampers work time
KERUGIAN BBM AKIBAT TUNDAAN DAN PANJANG ANTRIAN DI PERSIMPANGAN JALAN RAYA DENGAN REL KERETA API SEBIDANG (Studi Kasus Jalan Hasanudin Semarang) Ananda, Fina Kurnia; Yaqin, Wafi Ainul; Rizani, Mohammad Debby; Yudaningrum, Farida
Jurnal Teknik Sipil Giratory UPGRIS Vol 4, No 2: Desember 2023
Publisher : Universitas PGRI Semarang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26877/giratory.v4i2.18027

Abstract

Due to the high mobility of those passing by and the presence of trains that cross the intersection between the highway and the railroad, also known as level crossings, Jalan Hasanudin experiences heavy traffic during rush hour. Additionally, because of the large volume of train traffic at the Poncol station and the proximity of this intersection to the station, there is frequently a buildup of vehicles at the level crossing on Jalan Hasanudin. As a result, researchers will determine how Jalan Hasanudin Semarang performed. After conducting research, it was discovered that the highest vehicle queue length occurred on Monday, February 27 2023 from Jalan Hasanudin - Imam Bonjol at closing time 16.45 with a queue length of 123 meters and the highest stop delay occurred on Saturday, March 4 2023 from the direction of Jalan Hasanudin - Imam Bonjol with an average stop delay duration of 372.00 seconds. Therefore, the occurrence of long lines led to fuel losses for the drivers; their total gasoline loss over the course of the three research days was IDR 886,550.7. The researchers offer recommendations based on the findings of the research analysis to control street vendors and people near railroad tracks and railroad crossings that result in side barriers and long lines during stop delays, install traffic signs like those that prohibit stopping, prohibit parking, and prohibit raising and lowering passengers on roads, and so that there is no congestion along Jalan Hasanudin and around railroad crossings.
ANALISIS LAYANAN FASILITAS TERMINAL PENGGARON SEMARANG TERHADAP KEPUASAN PENGGUNA DENGAN METODE IMPORTANCE PERFOMANCE ANALYSIS (IPA) Navis, Ahmad Akbar; Rizani, Mohammad Debby; Yudaningrum, Farida
Jurnal Teknik Sipil Giratory UPGRIS Vol 4, No 2: Desember 2023
Publisher : Universitas PGRI Semarang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26877/giratory.v4i2.18033

Abstract

Penggaron Terminal is a type B terminal in the Pedurungan District area which serves departments such as Mangkang, Karang Ayu, Solo, Wonosobo, Kebumen, Cepu, Purwodadi, and cities or regencies within the province of Central Java. This research aims to determine the level of service at the Penggaron terminal using the importance performance analysis (IPA) method. This research was conducted at the Penggaron type-B terminal for two weeks, the first week the questionnaires were distributed to respondents on Mondays and Sundays in the morning at 07:00-10:00 WIB and in the afternoon at 16:00-18:00 WIB. This research is included in the quantitative research with a descriptive research approach. Data collection uses primary data, namely data obtained from the answers of the respondents to the questions posed by the researcher. Secondary data from literature study in the form of documents, laws and regulations, journals, scientific papers, supporting data relating to the problem under study. Based on the results of data analysis and processing using the Importance Performance Analysis (IPA) method in the Cartesian diagram, the service facilities at the Penggaron bus terminal are dominant in quadrant 2, which shows high expectations and reality, and quadrant 4, which means expectations of low use and high reality. However, there are a small number of service facilities that are in the quadrant, which means that the expectations from users are high but the reality is low. So, based on user evaluation, the service at the Penggaron terminal is quite good.
ANALISIS STABILITAS TIMBUNAN DENGAN PLAXIS MEMBANDINGKAN 2 METODE AKIBAT KETERBATASAN LAHAN Adhi, Bagas Wahyu; Setiyanto, Beni; Hidayawan, Ahmad; Rizani, Mohammad Debby
Jurnal Teknik Sipil Giratory UPGRIS Vol 4, No 1: Juni 2023
Publisher : Universitas PGRI Semarang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26877/giratory.v4i1.16187

Abstract

In the Cibitung - Cilincing Ramp 3-1 Toll Road development project, where the road alignment is an embankment construction with subgrade conditions that have dominant soil layers with sand and limited land. Then the implementation of subgrade improvement is carried out by comparing 2 methods, namely the first Replace 1.5 m (50 cm Limestone + Geomembrane + 50 cm Granular backfill + Geotextile Non Woven) + Sheet Pile with a length of 15 meters + Retaining Wall and the second Replace 1.5 m (50 cm Limestone + Geomembrane + 50 cm Granular backfill + Geotextile Non Woven) + Retaining Wall with Bore Pile D60 Int. 2 meters + Retaining Wall.The analysis of the two treatments used Plaxis with the results for the 1 year and 10 year consolidation of the two treatments meeting the requirements. The safety factor for the embankment slopes also meets the requirements. The results of the Horizontal Displacement in the first treatment are still very large, namely 6.73 cm, not in accordance with the AASTHO criteria of 3.8 cm and it can be seen from the profile bending moment on the Sheet Pile that the Sheet Pile is not pinched so that for this case the handling suitable is to use the second treatment, namely Replace 1.5 m (50 cm Limestone + Geomembrane + 50 cm Granular backfill + Geotextile Non Woven) + Retaining Wall with Bore Pile D60 Int. 2 meters + Retaining Walls 
Co-Authors Ahmad Hidayawan, Ahmad Ainun Nahar, Mukhamad Ilham Akhmad F. K. Khitam Al Fikri, Afrizal Yusuf Aminarti Laela Ananda, Fina Kurnia ANDRI KURNIAWAN Anggi Permata , Putri Anggraeni, Yossi Dewi Anggraini, Yossi Dewi Anindia, Rossa Varadella Annisa' Carina Antoni, Ahmad Aprillianto, Hery Aprilya, Fenina Rizky Ardian, Muhammad Ryan Ariawan, Donny Arieska Avianda Rachmayanie Asikin, Asep Assehab, Muhammad Ali Bagas Wahyu Adhi, Bagas Wahyu Bintara, Aditya Surya Dirman, Eris Nur Eka Silvi Nur Fianty Esterida, Berliana Fadillah, M. Sadam Farida Yudaningrum Fauzan, Nur Maulana Ferdiansyah, Ridho Fiki Nur Fitriani Fikri, Fajar Ikhsanul Galih Widyarini Hermawan, Matholiul Fatani Hidayat, Muhammad Mansur Hizballah, M Firoos Ibnu Toto Husodo, Ibnu Toto Iffah, Khilya Milkhatul Ikhwanudin Ikhwanudin Ikhwanudin Ikhwanudin Imawan, Heggy Indra Permana Indra Permana Indriani, Ayu Afrina Intan Mayasari Irvan, Aditya Muhammad JAMANTO, YOGA LESTIYANTO Jaryati Jaryati, Jaryati Jauhari, Muhammad Tantowi Joko Supriyanto Khobad, Andrian Majid Khusen, Fahri Kukuh Wisnuaji Widiatmoko Kurniawan, Fernando Dwi Leksana, Rudi Lestiyanto, Yoga Lindawati M Chamim Nufis M Ridwan Mahendra, Andyka Zulfa Masykuroh, Ifana Miftakhul Huda Miftakhul Janah Mimin Aminah Yusuf Mochammad Qomaruddin Mohammad Ridwan Muhammad Adi Nugroho Muhammad Zidan Fathur Rohman Munawar Kholil Nafilarizqi, Angie Belvavarian Navis, Ahmad Akbar Ndaru Ahmad Rizqi Nugroho, Hengky Setyo Nur Aksin, Nur Nurchamin, Nafiz Octaviana, Luthfia Dea Oktavia, Afifah Maulimatun Paripurna, Drian Pinuji, Putri Praptiningrum, Retno Dwi Prayogi, Gilar Maynalda Putri Anggi Permata Suwandi, Putri Anggi Putri Anggi Permata, Putri Anggi Putriani, Putriani Rahmasari, Maria Asysyifa Sadewo, Wasis Aziz Septiari, Andik Setiyanto, Beni Slamet Budirahardjo Slamet Budirahardjo Solichin, Muhammad Nafiul Supaphorn Akkapin Suwandi, Putri Anggi Permata Suzanna Ratih Sari Tantin Pristyawati Teguh Imam Rahayu Teguh Imam Rahayu Teguh Imam Rahayu Teguh Imam Rahayu Teguh Imam Rahayu Wahyu Bagus Pratama, Wahyu Bagus Wibowo, Adi Tri Yaqin, Wafi Ainul Yudaningrum, Farida Zakariya, Rif’an Zakhy Muhammad Luthfi Zuliyanto, Muhammad Dwi Zulvia, Avita