COMPARATIVE ANALYSIS OF PRECAST HALF SLAB COST BUDGET PLANS WITH CONVENTIONAL CONCRETE PLATES Hizballah, M Firoos; Suwandi, Putri Anggi Permata; Rizani, Mohammad Debby
International Journal of Sustainable Building, Infrastructure and Environment (IJOSBIE) Vol 5, No 2 (2024)
Publisher : Science and Technology Research Centre, Universitas PGRI Semarang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26877/ijosbie.v5i2.19761

Abstract

The development of construction methods used in construction has progressed from year to year and in planning the construction of a building it is necessary to select several construction methods. Among them are casting methods that can be done conventionally in a more modern and practical way, namely by using precast. In this research, the floor slab construction method is planned using the conventional floor slab method and the precast half slab method in the Kajen Regional Hospital construction project. The purpose of this research is to analyze the cost efficiency and construction time between the conventional floor slab method and the precast half slab method. The results of the comparison analysis of the conventional floor slab method require a cost of Rp797,269,777.81 with an implementation time of 64 days while the precast half slab method requires a cost of Rp1,470,907,469.89 with an implementation time of 72 days.
ANALISIS KOEFISIEN KEBUTUHAN MATERIAL DAN TENAGA DENGAN METODE ANALISIS BURGERLIJKE OPENBARE WERKEN (BOW) DAN METODE ANALISIS SNI 2008 TERHADAP EFISIENSI ALUR PENGADAAN MATERIAL DI PROYEK (Studi Kasus : Bangunan Tenant-150, Project Awann Costa POJ, Semarang) Octaviana, Luthfia Dea; Permata Suwandi, Putri Anggi; Rizani, Mohammad Debby
Jurnal Teknik Sipil Giratory UPGRIS Vol 5, No 2: Desember 2024
Publisher : Universitas PGRI Semarang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26877/giratory.v5i2.21970

Abstract

The development of construction planning, especially in the construction of building structures, calculates unit prices using a tool called Construction Cost Analysis (ABK), where until now the method often used by contractors and consultants is the BOW (Burgerlijke Openbare Werken) guideline. However, as time went by, it was realized that the BOW guidelines were only segmentally suitable for projects in the form of labor-intensive work that utilized conventional equipment and less professional workforce, which resulted in very expensive planning costs if this approach was still used purely. The 2008 Indonesian National Standard (SNI) analysis method is an update of the 1921 BOW (Burgerlijke Openbare Werken) analysis during the Dutch government, in other words, the SNI analysis is an updated BOW analysis. This SNI analysis was issued by the Center for Settlement Research and Development. The cost preparation system using SNI analysis is almost the same as the calculation system using BOW analysis. The basic principle of the SNI method is that a list of coefficients for materials and labor costs has been determined to analyze the price or costs required to make a unit price for building work. From these two coefficients we will get a calculation of the materials needed and a calculation of the wages of those doing the work. The comparative composition and arrangement of materials and labor for one job has been determined, which is then multiplied by the price of materials and wages prevailing in the market.
ANALISIS KEBUTUHAN DAN KETERSEDIAAN AIR BERSIH DI KECAMATAN KLEGO KABUPATEN BOYOLALI Leksana, Rudi; Rizani, Mohammad Debby; Ikhwanudin, ikhwanudin; Aksin, Nur
Jurnal Teknik Sipil Giratory UPGRIS Vol 5, No 2: Desember 2024
Publisher : Universitas PGRI Semarang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26877/giratory.v5i2.21963

Abstract

Clean water is one of important needs for human in their daily life. According to Central Statistic Department of Boyolali in 2018 TO 2021, the population of society in Klego District increased in 2022. It caused the clean water needs also increased. The services of infrastructure and clean water availability was not maximal yet causes the society must to look for the alternative sources of clean water to fulfill their clean water needs. The purposes of this research are to know the water needs and water ability and to know the reservoir capacity to be accomodate of the clean water. This research contains aboot the water needs and availability in Klego, Boyolali District. The researcher start the research by secondary data collection such as population data, the customer data, source capacity data and clean water production discharge data. In the calculation of society population, the researcher used population data in last 5 years with calculation prediction until 2032. To calculate the data, the researchers used Geometry method, Arithmetic method, and Linier Regression method. Then from the calculation, the researcher choose Arithmethic method because it have the smaller values. According to the calculation of the data by using Arithmetic method, so it is obtained the number of clean water needs, there is 66,69 liter/second in 2032 from the calculation of society population data, beside that, the clean water needs, there is 0,67 liter/second in 2032 from PDAM’s customer calculation. The clean water availability, there are 10 liter/second for source capacity and 1,9 liter/second for the production discharge in 2031. Then, the reservoir capacity is 15, 482 m3.
REDESIGN JEMBATAN SUNUT KABUPATEN SEMARANG MENGGUNAKAN STRUKTUR PELENGKUNG TIPE A- HALF THROUGH ARCH BRIDGE Rahmasari, Maria Asysyifa; Praptiningrum, Retno Dwi; Budirahardjo, Slamet; Rizani, Mohammad Debby
Jurnal Teknik Sipil Giratory UPGRIS Vol 5, No 2: Desember 2024
Publisher : Universitas PGRI Semarang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26877/giratory.v5i2.21964

Abstract

The Sunut Bridge is a bridge that crosses the Jragung River which connects Semarang Regency and Demak Regency. The initial planning for the Sunut Bridge used a prestressed concrete structure with a total length of the main bridge of 60 meters. This bridge is divided into 4 parts. From the author's assessment, the use of prestressed concrete structures with many pillars is considered to cause design waste and give the impression of stiffness to the bridge. Apart from that, seeing that the condition of the river during floods often brings flooding, thereby reducing the effective linear waterway of the river, a bridge construction was re-planned with minimal pillars using an arch structure. In this planning, the Sunut Bridge was re-planned to use a steel arch structure type A Half Through Arch Bridge. From the planning results, the vechile floor plat tickness was 23 cm. The longitudinal girder profile used is WF 800x300x16x30 and the cross girder profile WF 900x300x16x28. The next stage of calculating the primary and secondary structures is carried out by calculating the working loads which refer to SNI 1725:2016 and RSNI T-02-2005 regulations to obtain a box prifile for the main structure of the arch bridge.
EFEKTIVITAS PELAYANAN BUS RAPID TRANSIT (BRT) TRANS SEMARANG (KORIDOR MANGKANG-PENGGARON) Ainun Nahar, Mukhamad Ilham; Assehab, Muhammad Ali; Husodo, Ibnu Toto; Rizani, Mohammad Debby
Jurnal Teknik Sipil Giratory UPGRIS Vol 5, No 2: Desember 2024
Publisher : Universitas PGRI Semarang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26877/giratory.v5i2.21966

Abstract

Many people still use private vehicles, making BRT's function as a solution to overcome congestion not optimally realized. The aims of this study were: 1) to determine the supporting and inhibiting factors for the Trans Semarang Bus Rapid Transit (BRT) service (Mangkang-Penggaron Corridor); 2) determine the effectiveness of the Trans Semarang Bus Rapid Transit (BRT) service (Mangkang-Penggaron Corridor). This research uses a quantitative approach. Data collection techniques are observation, interviews, and documentation. Data analysis technique is descriptive statistics. The research results show that the supporting factors for the BRT Trans Semarang service are the dominant flat and wide roads, so that large buses can be used. The inhibiting factors in BRT Trans Semarang services are the absence of a special lane for BRT Trans Semarang, so waiting times and fleet intervals are still very dependent on existing traffic conditions. How to overcome the inhibiting factors in BRT Trans Semarang services, namely planning a special route for the Jrakah intersection to the Pedurungan intersection with a length of 12.8 km to improve service and reduce passenger waiting time, as well as improve fleet intervals. While the effectiveness of BRT Trans Semarang service corridor I Mangkang-Penggaron obtained a total average percentage value of 84% in the very good category. The results of the one sample t-test that have been carried out obtained a sig 2-tailed value of 0.000 0.05, indicating that Ho was rejected, so the average value of the effectiveness of the Trans Semarang Bus Rapid Transit (BRT) service corridor I Mangkang-Penggaron is not the same with 80. It can be concluded that the effectiveness of the Trans Semarang Bus Rapid Transit (BRT) service (Mangkang-Penggaron Corridor) has been running effectively.
ANALISA FAKTOR PENYEBAB KERUSAKAN RUAS JALAN JAKENAN – WINONG KABUPATEN PATI Hermawan, Matholiul Fatani; Rizani, Mohammad Debby; Yudaningrum, Farida
Jurnal Teknik Sipil Giratory UPGRIS Vol 5, No 2: Desember 2024
Publisher : Universitas PGRI Semarang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26877/giratory.v5i2.21967

Abstract

Roads are a transportation infrastructure that plays a very important role in the economic, social, political, defense and security fields. With the increasing number of vehicles, it is possible that the road will be damaged in a relatively short time. The Jakenan-Winong route can be said to be an alternative route that connects the Rembang-Pati areas. Jalan Raya Jakenan - Winong is included in the provincial road and according to road class it is included in the primary collector road. The purpose of this study, among others, is to determine the type of damage to the road using the Bina Marga Method, to identify the factors that cause road damage, and to find solutions to minimize damage to the road segment. Methods of data collection by observation or direct observation. The results of this study are: the total area of road damage is 2041.78 m2 or 0.1982310%. Consists of several types of damage, the most dominant is collapse with a total damage area of 250 m2 or 2.4271844% and an overall crack of 50.8 m2 or 0.4932038%. Based on an analysis of the condition of the types of road damage on the Jakenan-Winong road section, among others: subsidence, longitudinal cracks, edge cracks, slip cracks, loose grain, peeling of the surface layer, holes, patches, pavement edge damage. Of the many types of damage that occurred, the most common types of damage were collapse and cracks that occurred on these roads. The road damage factors are caused by excessive vehicle weight, poor implementation, material quality, poor drainage system, rainfall, soil and natural factors which damaged the Jakenan-Winong road. Repair solutions or handling strategies are carried out with corrective and maintenance actions in accordance with the type and level of damage that occurs on the Jakenan-Winong road section, each type and level of road damage requires repair and maintenance according to the damage. Repairs are made to restore comfort and safety for road users.
EVALUASI PENERAPAN SISTEM PROTEKSI DAN SARANA PENYELAMATAN PADA BANGUNAN PASAR JOHAR SEMARANG Rizani, Mohammad Debby; Anggi Permata , Putri; Jaryati; Esterida, Berliana
Journal of Research and Technology Studies Vol 1 No 2 (2022): Journal of Research and Technology Studies (JRTS)
Publisher : LP3M

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Pasar Johar merupakan salah satu bangunan publik yang menjadi pusat perdagangan jual beli di Kota Semarang dan merupakan pasar terbesar serta termodern di Asia Tenggara sekitar tahun 1980-an. Salah satu aspek penting yang harus dimilik oleh bangunan publik adalah keselamatan dari ancaman kebakaran. Tujuan dari penelitian ini adalah untuk mengetahui penerapan sistem proteksi dan sarana penyelamatan di pasar Johar Semarang. Metode yang digunakan dalam penelitian ini yaitu metode penelitian deskriptif kuantitatif dengan melakukan pengumpulan data dari hasil wawancara, catatan lapangan, dokumentasi pribadi, catatan peneliti, dan dokumen pendukung lainnya. Hasil analisa menunjukkan bahwa sistem proteksi aktif dengan persentase 20%, kelengkapan tapak dengan persentase 20%, dan sarana penyelamatan dengan persentase 20%, dalam kondisi baik, serta untuk sistem proteksi pasif dengan persentase sebesar 10% dalam kondisi rendah dikarenakan ada beberapa komponen yang terpasang namun tidak berfungsi. Hal ini menunjukkan bahwa penerapan sistem proteksi dan sarana penyelamatan di Pasar Johar Semarang dalam kategori cukup yaitu sebesar 70%.
ANALISA DEBIT BANJIR RENCANA PADA ALIRAN SUNGAI BANGER DI WILAYAH KOTA SEMARANG Debby Rizani, Mohammad; Ikhwanudin; Nurchamin, Nafiz; Ridwan, Mohammad
Journal of Research and Technology Studies Vol 2 No 1 (2023): Journal of Research and Technology Studies (JRTS)
Publisher : LP3M

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Sungai Banger merupakan salah satu daerah aliran sungai di Kota Semarang yang berfunsi sebagai infrastruktur pengendalian banjir. Dalam penelitian ini, peneliti melakukan beberapa analisa terkait kemampuan sungai Banger dalam menampung debit air maksimal, proses hidrolika dengan menggunakan aplikasi HEC-RAS, dan solusi untuk pengendalian banjir. Tujuan penelitian ini adalah untuk megetahui kemampuan debit Sungai Banger sehingga dapat diketahui seberapa besar dapat menampung air. Untuk mengetahui proses analisa hidrolika dengan menggunakan aplikasi HEC-RAS. Kemudian untuk mengetahui solusi yang tepat dalam pengendalian banjir. Jenis penelitian ini adalah penelitian kuantitatif. Penelitian ini menganalisa pengendalian banjir pada Sungai Banger dengan analisa HEC-RAS pada wilayah Kota Semarang. Perhitungan dan analisis yang diterapkan dalam penelitian ini menggunakan metode HEC-RAS. Data primer berupa long dan cross pada Daerah Aliran Sungai Sungai Banger. Data sekunder adalah curah hujan, peta Daerah Aliran Sungai dan informasi yang didapat dari Badan Besar Wilayah Sungai Pemali Juana.Hasil penelitian dengan metode terpilih yaitu metode rasional didapatkan nilai Qmax atau debit maksimum sebesar 95.184 m³/detik. Melalui simulasi Hec-Ras akan menunjukkan debit banjir rencana Sungai Banger yaitu sebesar 199 m³/detik, sehingga dalam realitanya Sungai Banger tidak dapat menampung debit banjir rencana. Solusi dari permasalahan banjir dari Sungai Banger adalah dengan cara normalisasi sungai, meninggikan tanggul, dan juga memberikan peraturan agar masyarakat tidak buang sampah di sungai.
Cost and Time Control Analysis in the Neucentrix Building Renovation Project Using the Earned Value Method Pinuji, Putri; Suwandi, Putri Anggi Permata; Rizani, Mohammad Debby
International Journal of Sustainable Building, Infrastructure and Environment (IJOSBIE) Vol 6, No 1 (2025)
Publisher : Science and Technology Research Centre, Universitas PGRI Semarang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26877/ijosbie.v6i1.20122

Abstract

In the Neucentrix renovation project, an addendum caused an extension. This study analyzes the weekly performance of the 2023 Neucentrix Pugeran Yogyakarta Project in terms of cost and time using the Earned Value method. The data analyzed using the Earned Value method using ACWP, BCWS, and BCWP indicators. From these indicators, CV, SV, CPI, SPI, EAS and EAC values are obtained. The analysis reveals cost savings from the first to the seventeenth week, with initial acceleration in the first four weeks followed by delays from weeks five to seventeen. The project is expected to take 19 weeks to complete, with a final estimated cost of IDR 2,294,673,540.
Factors Influencing the Management of Penggaron Terminal Facilities Based On Importance Performance Analysis (IPA) Method Results Navis, Ahmad Akbar; Rizani, Mohammad Debby; Yudaningrum, Farida
International Journal of Sustainable Building, Infrastructure and Environment (IJOSBIE) Vol 5, No 1 (2024)
Publisher : Science and Technology Research Centre, Universitas PGRI Semarang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26877/ijosbie.v5i1.16442

Abstract

Penggaron Terminal is a type B terminal located in Pedurungan District which serves majors in the cities of Central Java Province. This study aims to determine the factors that influence the management of facilities at Penggaron Terminal. This research was conducted at the Penggaron terminal for two weeks, Questionnaires were distributed on Mondays and Sundays, in the morning at 07:00-10:00 WIB and in the afternoon at 16:00-18:00 WIB. This research is included in the quantitative research. Data collection uses primary data, namely data obtained from respondents' answers. Secondary data in the form of literature as a support related to research. Based on the data analysis, the results of the factors that influence the management of facilities at Penggaron Terminal are the availability of main and supporting facilities. Meanwhile, facilities that are not yet available at Penggaron Terminal are green open spaces and storage areas for goods.Keywords: service level, user, Penggaron Terminal.