Claim Missing Document
Check
Articles

Found 21 Documents
Search

Perencanaan drainase kelurahan Sukamulya Baniva, Ratih; Usman, Fathoni; Destania, Henggar Risa; Amalia, Ghina; Firmansyah, Ockta
SELAPARANG: Jurnal Pengabdian Masyarakat Berkemajuan Vol 9, No 3 (2025): May
Publisher : Universitas Muhammadiyah Mataram

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31764/jpmb.v9i3.30354

Abstract

Abstrak Adanya berbagai pembangunan di wilayah Kelurahan Sukamulya dan jumlah penduduk yang meningkat pada saat musim penghujan mengakibatkan sering terjadi masalah drainase seperti limpasan dan genangan dipermukaan jalan yang diakibatkan karna hanya ada drainase alami di kelurahan Sukamulya Kecamatan Sematang Borang Kota Palembang. Dalam mengatasi limpasan dan genangan yang terjadi di kelurahan Sukamulya Kecamatan Sematang Borang Kota Palembang perlu dilakukan perencanaan drainase yang disertai perhitungan Rencana Anggaran Biaya (RAB) sehingga pelaksanaan PkM ini bertujuan untuk memberikan bantuan perencanaan drainase di kelurahan Sukamulya dengan melibatkan lurah Sukamulya, ketua RT.017 dan 5 warga RT.017. Tahapan PkM yang dilakukan yaitu survei lokasi, perencanaan drainase, penyusunan RAB yang disesuaikan dengan gambar desain drainase dan perhitungan menggunakan analisis harga satuan pekerjaan (AHSP) setempat dan melakukan sosialisasi kepada masyarakat dan lurah. Hasil dari PkM menunjukkan hasil rekapitulasi Rencana Anggaran Biaya (RAB) pada perencanaan drainase kelurahan Sukamulya dengan panjang saluran 100 m yaitu sebesar Rp. 129.996.800. Perhitungan biaya ini dapat dijadikan dasar dalam membangun saluran drainase di kelurahan Sukamulya kedepanya nanti. Kesimpulan dari PkM ini adalah diharapkan dengan adanya hasil perhitungan dapat membantu masyarat kelurahan Sukamulya dan lurah dalam membangun drainase kedepannya dan dana ini dapat dianggarkan atau diajukan kepada pemerintah setempat. Kata kunci: perencanaan drainase; Rencana Anggaran Biaya (RAB); Sukamulya. AbstractThe existence of various developments in the Sukamulya Urban Village area and the increasing population during the rainy season results in frequent drainage problems such as runoff and puddles on the road surface caused because there is only natural drainage in Sukamulya Village, Sematang Borang Subdistrict, Palembang City. In overcoming runoff and inundation that occurs in Sukamulya village, Sematang Borang sub-district, Palembang city, it is necessary to carry out drainage planning accompanied by the calculation of the Budget Plan (RAB) so that the implementation of this PkM aims to provide drainage planning assistance in Sukamulya village by involving the Sukamulya village head, the head of RT.017 and 5 RT.017 residents. The PkM stages carried out are location surveys, drainage planning, preparation of RAB adjusted to the drainage design drawings and calculations using local work unit price analysis (AHSP) and socializing to the community and village head. The results of the PkM  show the results of the recapitulation of the Budget Plan Cost (RAB) in the drainage planning of Sukamulya village with a channel length of 100 m, which amounted to Rp. 129,996,800. This cost calculation can be used as a basis for building drainage channels in Sukamulya village in the future. The conclusion of this PkM is that it is hoped that the results of the calculation can help the Sukamulya village community and the village head in building drainage in the future and these funds can be budgeted or submitted to the local government. Keywords: drainage planning; cost budget plan; Sukamulya.
SISTEM INFORMASI SEBARAN POTENSI DAN PELUANG INVESTASI INDUSTRI BATU ALAM,BATIK, DAN ROTAN KABUPATEN CIREBON MENGGUNAKAN SISTEM INFORMASI GEOGRAFIS Amalia, Ghina; M, Tati Harihayati; Widianti, Utami Dewi
Jurnal Penelitian Mahasiswa Teknik dan Ilmu Komputer (JUPITER) Vol. 1 No. 2 (2021): JUPITER : Jurnal Penelitian Mahasiswa Teknik Dan Ilmu Komputer
Publisher : Fakultas Teknik dan Ilmu Komputer - Universitas Komputer Indonesia (UNIKOM)

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (1213.045 KB) | DOI: 10.34010/jupiter.v1i2.6692

Abstract

Kabupaten Cirebon merupakan salah satu kabupaten yang berada di Provinsi Jawa Barat. Letak geografis Kabupaten Cirebon berada pada posisi 6°30’–7°00’ Lintang Selatan dan 108°40’-108°48’ Bujur Timur. Luas daerah Kabupaten Cirebon, yaitu 990,36 Km2. Akses menuju Kabupaten Cirebon sangat mudah. Adanya kemudahan akses menuju Kabupaten Cirebon contohnya Bandara Internasional Jawa Barat, Tol Cipali, dan Pelabuhan Internasional yang menjadikan investor tertarik untuk menanamkan modalnya di Kabupaten Cirebon.Seksi Kajian dan Pengembangan Penanaman Modalyang berada dibawah Dinas Penanaman Modal dan Pelayanan Terpadu Satu Pintu (DPMPTSP) pada saat ini dalam memberikan informasi mengenai potensi dan peluang investasi industri unggulan kabupaten Cirebon melalui penyelenggaraan kegiatan penyuluhan menggunakan bantuan power point dan ikut serta dalam pameran yang diselenggarakan oleh pihak ketiga. Cara tersebut sering kali mengakibatkan para investor tidak mempunyai gambaran dengan jelas mengenai industri potensial mana saja yang ada di Kabupaten Cirebon yang memiliki peluang investasi. Selain itu Kepala Seksi Kajian dan Pengembangan Penanaman Modalkesulitan dalam memonitoring industri-industri yang memiliki peluang investasi positif beserta sebarannya.Indikator yang digunakan dalam menentukan peluang investasi adalah perizinan, jarak menuju tol, jumlah tenaga kerja, dan kondisi lingkungan dan metode yang digunakan adalah metode fuzzy logic. Hasil dari pengujian terhadap sistem yang dibangun menunjukkan bahwa sistem ini cukup membantu pihak-pihak terkait dalam mendapatkan informasi mengenai sebaran serta peluang investasi yang potensial pada industri-industri unggulan yang ada di kabupaten Cirebon.
Kajian Respon Emosi Musikal dan Semiotika: Studi Kasus K-Popers Banten Amalia, Ghina; Septiyan, Dadang Dwi; Rizal, Syamsul
Jurnal Pendidikan Tambusai Vol. 9 No. 2 (2025): Agustus
Publisher : LPPM Universitas Pahlawan Tuanku Tambusai, Riau, Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/jptam.v9i2.29374

Abstract

Penelitian ini bertujuan untuk menganalisis makna denotatif dan konotatif dalam lirik lagu K-Pop serta mengidentifikasi respon emosi musikal yang ditimbulkan terhadap perilaku penggemar K-Pop di Banten. Melalui pendekatan kualitatif deskriptif dan studi kasus, data diperoleh lewat wawancara, observasi, dokumentasi, dan studi pustaka. Hasil analisis menunjukkan bahwa lirik lagu K-Pop seperti Spring Day, Boom, Hello Future, dan Wannabe memunculkan respons emosional (rindu, semangat, harapan) dan perubahan perilaku (imitasi, ekspresi identitas). Dengan analisis semiotik Roland Barthes, ditemukan bahwa lirik K-Pop tidak hanya menyampaikan makna, tetapi juga membentuk identitas diri dan relasi emosional yang mendalam, menjadikan musik sebagai medium penting dalam kehidupan sosial dan emosional penggemar.
Analisis Kerusakan Jalan Pada Ruas jalan Nasional Kertosono Nganjuk Jawa Timur (Studi Kasus Km. 107+000-115+000) daiyan, Muhammad Daiyan Saputra; Nisumanti, Sartika; Amalia, Ghina
Jurnal Tekno Global Vol. 14 No. 01
Publisher : UNIVERSITAS INDO GLOBAL MANDIRI

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.36982/jtg.v14i01.5195

Abstract

ABSTRACT Highways are transportation infrastructure that is very important in supporting land transportation as a link between regions. Apart from that, road infrastruc ture is also the lifeblood of economic, political, socio-cultural and national security defense. This research aims to determine the types of damage and differences in the percentage assessment of road damage between the Surface Distress Index method and the International Roughness Index method on the Nganjuk -kertosono National Road section KM.107+000 – 115+000. Based on the analysis and discussion of the types of damage that occurred on the Kertosono-Nganjuk KM 107+000-115+000 National Road, namely cracked crocodile skin, loose grains, longitudinal cracks, expansion, collapse, patches, block cracks, holes and grooves. The difference in the assessment of road damage conditions obtained using the Surface Distress Index method in good condition has a percentage of 0%, moderate condition is 43.75%, slightly damaged condition is 31.25% and heavily damaged condition is 25.00%, whereas International Roughness Index method with road conditions in the good category at 31.25% and road condition s in the moderate category at 68.75%. Road conditions using the SDI method are heavily damaged so reconstruction needs to be carried out and road conditions using the IRI method are moderate so routine/periodic maintenance needs to be carried out.  Keywords :. Surface Distress Index, International Roughness Index and Type of Road Damage   ABSTRAK Jalan raya merupakan infrastruktur transportasi yang sangat vital untuk mendukung mobilitas darat dan menghubungkan berbagai daerah. Selain itu, infrastruktur jalan juga berfungsi sebagai tulang punggung kehidupan ekonomi, politik, sosial budaya, dan pertahanan keamanan negara. Penelitian ini bertujuan untuk menganalisis jenis-jenis kerusakan serta perbandingan persentase kerusakan jalan antara metode Surface Distress Index dan International Roughness Index) pada ruas Jalan Nasional Nganjuk-Kertosono KM 107+000 – 115+000. Berdasarkan hasil analisis, jenis-jenis kerusakan yang terjadi pada ruas jalan ini antara lain retak kulit buaya, butiran lepas, retak memanjang, mengembang, amblas, tambalan, retak blok, lubang, dan alur. Perbedaan penilaian kondisi kerusakan jalan dengan metode Surface Distress Index  diperolehd yang termasuk dalam kategori baik tidak ada (0%), sedangkan 43,75% dalam kategori sedang, kategori rusak ringan sebesar 31,25%, dan 25,00% dalam kategori rusak berat. Sementara berdasarkan metode International Roughness Index, nilai kondisi jalan dengan kategori baik mencapai 31,25%, dan kondisi jalan dalam kategori sedang mencapai 68,75%. Berdasarkan hasil penilaian kedua metode, yang menunjukkan kondisi jalan mengalami kerusakan berat yang membutuhkan penanganan rekonstruksi adalah metode SDI, sementara penilaian dengan metode IRI menunjukkan kondisi jalan dalam kategori sedang yang memerlukan pemeliharaan rutin atau berkala.  Kata Kunci : Surface Distress Index, International Roughness Index dan Jenis kerusakan jalan
Slope Stability Analysis of Sekayu-Mangun Jaya Road STA 127+350 Reinforced with Retaining Walls Minaka, Utari Sriwijaya; Uanza, Roby; Nisumanti, Sartika; Amalia, Ghina
CIVED Vol. 10 No. 3 (2023): September 2023
Publisher : Universitas Negeri Padang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24036/cived.v10i3.462

Abstract

Economic growth that increases the traffic load on national roads requires these roads to have decent, safe and comfortable services. Landslide was occurred on the Sekayu-Mangun Jaya STA 127+350 road section which disrupted traffic activity. This occurrence caused the major road to shift sideways and deteriorate, rendering the route's service capacity insufficient. The road section has been repaired and is planned to use soil retaining wall reinforcement as a countermeasure. This study aims to determine the slope stability of the Sekayu-Mangun Jaya road before and after reinforcement is carried out. Slope stability analysis was performed by empirical methods using infinite slope theory and the finite element method using the Plaxis program. The calculation results show that the safety factor of the slope before the retaining wall is installed at BH-01 is 0.9. This value falls under the category of unstable slope. The safety factor at the BH-02 location was obtained at 1.3 in the moderate stability category. Slope stability after strengthening with the installation of embankments and retaining walls shows an increase in the safety factor at BH-01 to 2.59. After the slope reinforcement was carried out, the slope deformation decreased significantly to 1.5 m. The results implicated that with slope reinforcement, slope stability increases and the possibility of landslides decreases.
Analisis Eksperimental Nilai Kuat Tekan Bebas Tanah Gambut Akibat Substitusi Geopolimer Amalia, Ghina; Minaka, Utari Sriwijaya
Jurnal Teknik Sipil Institut Teknologi Padang Vol 11 No 2 (2024): Jurnal Teknik Sipil institut Teknologi Padang
Publisher : ITP Press

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21063/jts.2024.V1102.088-94

Abstract

Peningkatan pembangunan infrastruktur di Indonesia berdampak pada peningkatan penggunaan lahan. Hanya saja tidak semua lahan memiliki karakteristik geoteknik yang memenuhi persyaratan untuk dibangun suatu infrastruktur di atasnya. Lahan yang tidak memenuhi persyaratan tersebut disebut tanah bermasalah. Salah satu jenis tanah bermasalah yang paling sering ditemui di Indonesia khususnya pulau Sumatera adalah tanah gambut. Tanah gambut memiliki kandungan air yang tinggi dan berbanding lurus dengan nilai indeks permeabilitasnya. Tanah dengan indeks permeabilitas yang tinggi akan mudah mengalami penurunan yang sangat signifikan sehingga nilai daya dukung tanah ini sangat rendah. Agar tanah gambut tetap dapat digunakan, maka perlu dilakukan stabilisasi salah satu metodenya dengan menggunakan zat kimia. Pada penelitian ini digunakan campuran geopolimer sebagai bahan stabilisasi tanah gambut. Variasi campuran geopolimer yang digunakan adalah 0%, 10%, 15%, 20% dan 25%. Pengujian dilakukan secara eksperimental di laboratorium dengan menggunakan pengujian UCT (Unconfined Compression Test). Pengujian ini mendapatkan nilai qu (kuat tekan bebas) dan nilai kohesi tanah gambut yang telah distabilisasi. Berdasarkan hasil pengujian didapatkan bahwa peningkatan persentase jumlah campuran geopolimer pada tanah gambut akan berbanding lurus dengan meningkatnya nilai qu tanah gambut. Nilai qu tertinggi didapatkan sebesar 0,910 kg/cm2.
Optimasi Proyek Konstruksi Melalui Pelatihan Penggunaan Microsoft Project Untuk Penyusunan Jadwal Proyek Nurmeyliandari, Revianty; Bastam, Mukhlis Nahriri; Panjaitan, Febriyanti; Amalia, Ghina; Febriandi, Yusuf
Jurdimas (Jurnal Pengabdian Kepada Masyarakat) Royal Vol. 8 No. 1 (2025): Januari 2025
Publisher : STMIK Royal

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33330/jurdimas.v8i1.3522

Abstract

This program aims to enhance employees' abilities in creating more efficient and organized project schedules. This need arose due to some employees' limited knowledge and experience in utilizing Microsoft Project to produce accurate and structured work schedules. The training involved four employees, comprising three participants with a background in civil engineering and one from management. The training methods included an introduction to basic project scheduling, the use of Microsoft Project, and the application of real case studies from ongoing projects. Pre-test results showed an average score of 54.25, with the management participant receiving a grade of E, while civil engineering participants received grades of C and D. After the training, the post-test indicated significant improvement, with one participant achieving a grade of A and two others obtaining a grade of B. The management participant improved to a grade of C. The final assignment, creating a project schedule using Microsoft Project, was successfully completed by all participants, demonstrating improved skills in project management and resource optimization. In conclusion, this training successfully enhanced employees' understanding and skills in using Microsoft Project for project schedule optimization at CV. KEINARRA, which has the potential to increase the company's overall efficiency.Keywords: Microsoft Project; project scheduling; training; optimization.  Abstrak: Pengabdian ini bertujuan untuk meningkatkan kemampuan karyawan dalam menyusun jadwal proyek yang lebih efisien dan terorganisir. Permintaan ini timbul karena beberapa karyawan kurang memiliki pengetahuan dan pengalaman dalam memanfaatkan Microsoft Project untuk menghasilkan jadwal kerja yang akurat dan terstruktur. Pelatihan ini melibatkan empat karyawan, terdiri dari tiga peserta dengan latar belakang teknik sipil dan satu dari manajemen. Metode pelatihan meliputi pengenalan dasar penjadwalan proyek, penggunaan Microsoft Project, serta aplikasi studi kasus nyata dari proyek yang sedang berlangsung. Hasil pre-test menunjukkan skor rata-rata sebesar 54,25, di mana peserta dari manajemen mendapatkan nilai E, sedangkan peserta dari teknik sipil mendapatkan nilai C dan D. Setelah pelatihan, post-test menunjukkan peningkatan signifikan dengan satu peserta meraih nilai A dan dua peserta lainnya mendapatkan nilai B. Peserta dari manajemen meningkat ke nilai C. Tugas akhir berupa penyusunan jadwal proyek dengan Microsoft Project berhasil diselesaikan oleh semua peserta, menunjukkan peningkatan keterampilan dalam manajemen proyek dan optimalisasi sumber daya. Kesimpulannya, pelatihan ini berhasil meningkatkan pemahaman dan keterampilan karyawan dalam penggunaan Microsoft Project untuk optimasi jadwal proyek di CV. KEINARRA, yang berpotensi meningkatkan efisiensi perusahaan secara keseluruhan.Kata kunci: Microsoft Project; penjadwalan proyek; pelatihan; optimasi.
Pendampingan Operasi dan Pemeliharaan Alat Hidrologi di Stasiun Klimatologi Bendung Lakitan Baniva, Ratih; Amalia, Ghina; Parwanti, Sri; Yuliany, Eka Haryati; Trikarno, Mohamad Anugrah
E-Dimas: Jurnal Pengabdian kepada Masyarakat Vol 15, No 1 (2024): E-DIMAS
Publisher : Universitas PGRI Semarang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26877/e-dimas.v15i1.15585

Abstract

Kelengkapan data hidrologi yang akurat diperlukan adanya program operasi dan pemeliharaan alat hidrologi secara menyeluruh dengan pemantauan secara langsung ke stasiun klimatologi secara rutin sehingga diharapkan dapat menginventarisasi alat yang masih berfungsi dan yang berkendala bertujuan informasi data yang didapatkan dapat tetap tepat dan benar. Pihak petugas pos klimatologi diharapkan memantau alat-alat hidrologi yang ada di pos klimatologi secara rutin dan berkala. Tujuan dari kegiatan ini adalah memberikan pendampingan operasi dan pemeliharaan alat hidrologi pada stasiun klimatologi Bendung Lakitan kabupaten Musi Rawas agar dapat menginventarisasi dan monitoring terhadap alat hidrologi berdasarkan kondisinya. Kegiatan Pengabdian pada Masyarakat ini bertempat di Desa Selangit Kabupaten Musi Rawas. Tahapan pelaksanaan pada kegiatan Pengabdian pada Masyarakat pada Stasiun Klimatologi Bendung Lakitan dimulai dari tahap Persiapan, survei lapangan, pengisian formulir inspeksi terkait kondisi fisik alat hidrologi yang ada di pos/stasiun. Kegiatan ini dimulai tanggal 9 Oktober-13 Oktober 2023. Hasil dari pengabdian masyarakat ini dapat dilihat pengoperasian alat hidrologi pada stasiun klimatologi Bendung Lakitan Kabupaten Musi Rawas kondisi semua alat berfungsi dengan baik sehingga data yang dihasilkan lengkap dan pemeliharaan alat hidrologi pada stasiun klimatologi Bendung Lakitan Kabupaten Musi Rawas dilakukan pendampingan kalibrasi secara berkala.
Implementasi Pengelolaan Limbah Dalam Membangun Sikap Peduli Lingkungan Siswa di Madrasah Ibtidaiyah DDI Tani Aman Loa Janan Ilir Debiyanti, Nurul; Revilla Malik, Lina; Ulfa Hidayah, Maulida; Nur Rifdah, Khonsaullabibah Maisun; Amalia, Ghina
Samarinda International Journal of Islamic Studies Samarinda International Journal of Islamic Studies, Vol. 1, No. 1, 2024
Publisher : PT. Berkah Smart Academica

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.64093/sijis.v1i1.2

Abstract

Pengelolaan limbah di MI DDI Tani Aman belum sepenuhnya dapat membuat peserta didik untuk peduli terhadap lingkungan sekitarnya. Tujuan dari penelitian yaitu untuk mengetahui implementasi dari pengelolaan limbah dalam membangun sikap peduli lingkungan siswa dan faktor pendukung dan penghambat dalam implementasi pengelolaan limbah dalam membangun sikap peduli lingkungan siswa. Jenis penelitian yang digunakan pada penelitian ini yaitu metode kualitatif dengan pendekatan deskriptif. Jenis instrumen yang digunakan yaitu wawancara, observasi dan dokumentasi. Teknik analisis data yang digunakan ialah Kondensasi data, penyajian data dan penarikan kesimpulan serta verifikasi. Hasil penelitian menunjukkan bahwa implementasi pengelolaan limbah melalui kegiatan 5R (reduce, reuse, recycle, replace, replant) dan Jumat bersih memberikan dampak positif terhadap pembentukan sikap peduli lingkungan pada peserta didik. Dalam kegiatan reduce, terbentuk kebiasaan membawa peralatan makan sendiri dan kesadaran untuk menghindari limbah plastik. Pada reuse, peserta didik menjadi sadar dan peka dalam memanfaatkan kembali limbah. Recycle menghasilkan sikap kreatif dalam mengolah limbah dan memanfaatkan bank sampah di sekolah. Replace menumbuhkan tanggung jawab dan kesadaran untuk tidak menggunakan barang yang tidak dapat diolah kembali. Replant menciptakan kesadaran untuk turut serta dalam menanam, menjaga, dan merawat tanaman sekolah.
Optimalisasi Pembelajaran IPA Pada Siswa Kelas IV Madrasah Ibtidaiyah Ar Raudhah Samarinda Rahmadani; Kadir, Marniati; Adawiyah, Rabiatul; Amalia, Ghina
Samarinda International Journal of Islamic Studies Samarinda International Journal of Islamic Studies, Vol. 1, No. 1, 2024
Publisher : PT. Berkah Smart Academica

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.64093/sijis.v1i1.3

Abstract

Penelitian ini dilatar belakangi optimalisasi pembelajaran IPA pada siswa. Karena pembelajaran IPA pada siswa MI Ar Raudhah samarinda masih belum optimal. Dalam sebuah sistem pembelajaran pasti terdiri dari berbagai komponen yang saling berkaitan. Selain hal itu pada pembelajaran IPA dikelas Guru menggunakan metode ceramah, tanya jawab, dan penugasan. Berdasarkan hal tersebut peneliti ingin melihat optimalisasi pembelajaran. Penelitian ini menggunakan penelitian deskriptif kualitatif. Sumber data dalam penelitian ini adalah guru dan siswa kelas IV Madrasah Ibtidaiyah Ar-Raudhah Samarinda.Teknik Pengumpulan data dilakukan dengan teknik observasi, wawancara, dan dokumentasi. keabsahan data dilakukan dengan tringulasi data dan tringulasi metode. Teknik analisis data pengumpulan data, reduksi data, dan penyajian data dan kesimpulan. Hasil dari penelitian diketahui pada aspek perencanaan guru sudah mempersiapkan kegiatan belajar mengajar dengan baik, terbukti dengan adanya RPP Kurikulum 2013 yang digunakan pada kegiatan belajar siswa. Pelaksanaan Pembelajaran IPA Pada Siswa Kelas IV MI AR-Raudhah Samarinda yang dilaksanakan guru sudah sesuai prosedur mulai dari model Contextual Teaching and Learning,metode ceramah, tanya jawab dan penugasan, sedangkan media menggunakan media langsung yang bersifat kontekstual. Pada aspek Evaluasi yang dilakukan oleh guru meliputi evaluasi kognitif dan afektif untuk mengetahui hasil dari pembelajaran sudah sepenuhnya dilakukan. Pada aspek kognitif guru menggunakan instrumen checklist dengan kriteria – kriteria yang sesuai aspek penilaian, selain itu guru juga menggunakan fortofolio berdasarkan hasil ulangan harian. Aspek sikap guru menggunakan instrumen checklist perilaku sikap.