cover
Contact Name
-
Contact Email
-
Phone
-
Journal Mail Official
-
Editorial Address
-
Location
Kota manado,
Sulawesi utara
INDONESIA
JURNAL ILMIAH MEDIA ENGINEERING
ISSN : 20879334     EISSN : -     DOI : -
Core Subject : Education,
The Pasca Teknik Sipil (S2) Unsrat Open Journal System (PTSU-OJS) consist of Jurnal Ilmiah Media Engineering (Online Not Yet) and Jurnal Ilmiah Media Engineering (Print) are published fourannualy, in Februari, March, July and November.
Arjuna Subject : -
Articles 218 Documents
Trend Sedimen Transport Pada Laut Ariake Utara, Japan Jansen, Tommy
JURNAL ILMIAH MEDIA ENGINEERING Vol 8, No 2 (2018): JURNAL ILMIAH MEDIA ENGINEERING
Publisher : Sam Ratulangi University

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

The sediment balance is the balance of sediment volume entering and exiting a particular section of the coast or an estuary. These consists of the evaluation of sediment fluxes, sources and sinks from different processes that give rise to additions and subtractions within a control section of the coast in order to gain a better understanding of the coast system. The areas as a control volume are placed in north part and south part of the North Ariake Sea. Cross section AA, BB and cross section CC, DD are needed as the area that the flow through the control volume at spring tide and neap tide. The suspended sediment concentration entering and exiting within transport process at 30 August 2004 21:10:00 and 31 August 2004 15:46:40 of rectangular AABB and rectangular CCDD at spring and neap tide. The trend of transport sediment in rectangular AABB effected by tide it tends to catch little more sediment or deposition occurs. The trend of transport sediment in rectangular CCDD effected by tide it tends to export more sediment or erosion occurs. The phenomena in the north Ariake Sea that tidal flats keep existence and the concentration of sediment is higher around Chikugo River estuaries and nearshore, and the resuspension of sediment keep occurring at offshore of the north Ariake Sea. Keywords: sedimen transport, sedimen balance, coast, erosion, estuaries, resuspension
ANALISIS DAMPAK LALU LINTAS (ANDALALIN) KAWASAN KAMPUS UNIVERSITAS SAM RATULANGI Sumajouw, Josef; Sompie, Bonny F.; Timboeleng, James A.
JURNAL ILMIAH MEDIA ENGINEERING Vol 3, No 2 (2013): JURNAL ILMIAH MEDIA ENGINEERING
Publisher : Sam Ratulangi University

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Perubahan tataguna lahan baik perubahan kategori maupun intensitasnya akan membangkitkan lalulintas, sehingga kecil ataupun besar akan mempunyai pengaruh terhadap lalu lintas di sekitarnya. Untuk mengantisipasi terjadinya pengaruh lalu lintas yang cukup besar pada jaringan transportasi di sekitar pembangunan tersebut, perlu dilakukan kajian analisis dampak lalu lintas (traffic impact analysis). Analisis dampak lalu lintas atau sering disebut Andalalin adalah suatu studi khusus yang menilai efek-efek yang ditimbulkan oleh lalu lintas yang dibangkitkan oleh suatu pengembangan kawasan terhadap jaringan transportasi di sekitarnya.Pembangunan gedung baru di beberapa bagian kawasan kampus Unsrat seperti pembangunan Rumah Sakit Kampus, pembangunan gedung kuliah baru di beberapa fakultas, dan pembangunan gedung baru lainnya diperkirakan akan berpengaruh terhadap volume dan sistem pergerakan lalu lintas di beberapa jaringan jalan dalam kampus dan jaringan jalan sekitar kampus Universitas Sam Ratulangi diantaranya adalah ruas Jalan Wolter Monginsidi dan ruas jalan kawasan kelurahan Bahu, sehingga perlu dilakukan kajian analisa dampak lalu lintas (Andalalin). Misalnya pada ruas jalan Wolter Monginsidi, sebagai akibat kondisi tataguna lahan jalan tersebut adalah pertokoan dan merupakan salah satu pintu masuk dan keluar dari kawasan kampus Unsrat, maka di ruas jalan ini sering terjadi kemacetan pada jam puncak pagi, siang dan sore hari. Kondisi yang sama terjadi pula di ruas jalan dalam kawasan kampus. Pada jam-jam tertentu sering terjadi kemacetan.Kata kunci: andalalin, tataguna lahan, pengembangan kawasan, jaringan transportasi.
ANALISIS AKUNTABILITAS SISTEM PENGADAAN SECARA ELEKTRONIK v.3.5 DALAM PROSES E-TENDERING Sumangkut, Roi Y. A.; Dapas, Servie O.; Jansen, Freddy
JURNAL ILMIAH MEDIA ENGINEERING Vol 4, No 3 (2014): JURNAL ILMIAH MEDIA ENGINEERING
Publisher : Sam Ratulangi University

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Pengadaan Barang/Jasa Pemerintah secara elektronik merupakan terobosan dalam pelayanan public untuk mewujudkan akuntabilitas dalam pengadaan barang dan jasa, yang dalam pelaksanaannya di proses melalui suatu aplikasi Sistem Pengadaan Secara Elektronik (SPSE) yang terus berkembang sampai dengan saat ini sesuai dengan perubahan peraturan di bidang Pengadaan Barang/Jasa Pemerintah. Sehingga disadari bahwa berjalan tidaknya Pengadaan Barang/Jasa Pemerintah secara elektronik sesuai dengan tujuannya tergantung dari aplikasi sistem yang digunakan, yang bukan hanya fisibel tapi juga akuntabel. Penelitian ini bertujuan untuk mengetahui dan menganalisis akuntabilitas SPSE v.3.5 dalam pengadaan barang/jasa pemerintah secara elektronik lebih khusus untuk pengadaan secara E-Tendering dalam hal implementasinya terhadap pelaksanaan pengadaan barang/jasa serta untuk mengetahui apakah sistem yang di gunakan ini benar-benar sesuai dengan tujuan yang diamanatkan oleh aturan tentang Pengadaan Barang/Jasa Pemerintah. Penelitian dilaksanakan di Kabupaten Minahasa Selatan dengan menggunakan metode penelitian deskriptif dengan pendekatan kualitatif melalui pengambilan sampel secara purposive sampling yaitu pengguna aplikasi SPSE v.3.5 antara lain Pejabat Pembuat Komitmen, Pokja ULP dan Penyedia Jasa dengan teknik pengumpulan data melalui studi literatur, wawancara serta observasi aplikasi SPSE dengan menggunakan akses dari pengguna SPSE. Melalui penelitian ini dapat disimpulkan bahwa aplikasi SPSE v.3.5 belum menjamin terlaksananya pengadaan sesuai dengan tujuan Pengadaan Barang/Jasa Pemerintah secara elektronik dalam hal untuk meningkatkan akuntabilitas dan transparansi, meningkatkan akses pasar dan usaha persaingan sehat, serta memenuhi akses informasi yang real time, sehingga disarankan agar pihak pengembangan SPSE dalam hal ini Direktorat Pengembangan SPSE Lembaga Kebijakan Pengadaan Barang/Jasa Pemerintah (LKPP) Republik Indonesia untuk melakukan perbaikan terhadap satu-satunya sistem yang digunakan untuk Pengadaan Barang/Jasa Pemerintah secara elektronik saat ini yaitu SPSE v.3.5. Kata kunci: pengadaan, barang/jasa, aplikasi SPSE, akuntabel, transparansi, elektronik
ANALISA NONLINEAR BALOK TINGGI BETON BERTULANG DENGAN MODIFIED COMPRESSION FIELD THEORY Windah, Reky Stenly
JURNAL ILMIAH MEDIA ENGINEERING Vol 1, No 1 (2011): JURNAL ILMIAH MEDIA ENGINEERING
Publisher : Sam Ratulangi University

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

The modified compression field theory, MCFT, an analytical model that is capable of predicting not only the shear strength but also the load-deformation response of reinforced concrete elements subjected to in-plane shear and normal stresses, such as deep beams. This rationalmodel satisfies the three fundamental principles of the mechanics of materials: stress equilibrium, strain compatibility, and the constitutive laws of materials.The accuracy of MCFT method in predicting shear strength of reinforced concrete deep beam is very good. This indicated by the value Ptest/Pmcft of 7,14 %.Keywords: the modified compression field theory, shear strength, load-deformation response, in-plane shear, deep beam.
PEMILIHAN TIPE BANGUNAN PENGAMAN PANTAI DENGAN KEARIFAN LOKAL DI PULAU BUNAKEN Kumaat, Stevanny; Dundu, A. K. T.; Mandagi, Robert J. M.
JURNAL ILMIAH MEDIA ENGINEERING Vol 6, No 2 (2016): JURNAL ILMIAH MEDIA ENGINEERING
Publisher : Sam Ratulangi University

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Pulau Bunaken sebagai kawasan wisata taman laut yang kegiatan utamanya adalah diving,snorkeling,dan submarine touring. Sejalan dengan nilai dan pentingnya kawasan wisata taman laut Bunaken sebagai destinasi para wisatawan mancanegara , di Pulau Bunaken juga terdapat pemukiman penduduk di daerah pesisir pantai yang mendapat prioritas pengamanan dan perlindungan dari kerusakan  akibat abrasi/erosi. Tujuan penelitian ini adalah mengidentifikasi dan menganalisa  kerusakan pantai di lokasi pemukiman penduduk Pulau Bunaken,                memberikan solusi penanganan dengan mendapatkan bangunan pengaman pantai dengan kearifan lokal, mendapatkan cara pengelolaan pantai yang partisipatif bagi masyarakat di Pulau Bunaken dengan menggunakan material dengan kearifan lokal. Metode analisa dilakukan menggunakan metode AHP yang membantu memecahkan persoalan yang kompleks dengan menstruktur suatu hirarki kriteria, pihak yang berkepentingan, hasil dan dengan menarik berbagai pertimbangan guna mengembangkan bobot atau prioritas. Hasil manunjukkan bahwa Perkembangan daerah pantai menjadi daerah pemukiman di Pulau Bunaken menimbulkan permasalahan pantai sehingga menjadi prioritas penanganan. Pengambilan keputusan untuk memilih tipe bangunan pengaman pantai untuk bangunan pengaman pantai yang memiliki kearifan local adalah dengan cara membangun Sand Dune.K Kata-kata Kunci: kearifan lokal, pengaman pantai, bunaken, abrasi, erosi,
KAJIAN PROPORSIONAL MODEL SUMBER DAYA PADA PROYEK KONSTRUKSI GEDUNG Mangare, Jantje Bernhard; Sompie, Bonny F.; Tarore, Huibert
JURNAL ILMIAH MEDIA ENGINEERING Vol 2, No 3 (2012): JURNAL ILMIAH MEDIA ENGINEERING
Publisher : Sam Ratulangi University

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Permasalahan dalam suatu proyek konstruksi bisa dihindarkan jika proporsi penggunaan sumber daya sudah tepat. Sumber daya proyek konstruksi adalah suatu kapasitas potensi yang dapat dimanfaatkan untuk kegiatan konstruksi, yang memerlukan sistem manajemen yang baik agar dapat memanfaatkannya secara optimal. Dalam penelitian ini dilakukan pemodelan untuk menentukan proporsi yang tepat sesuai dengan kebutuhan sumber daya, yang bertujuan mengidentifikasi, menganalisa, dan mencari beberapa variabel, serta hubungan antar variabel yang mempengaruhi ketepatan proporsi sumber daya material, manusia, dan peralatan dalam pelaksanaan suatu konstruksi di Manado dan sekitarnya. Hasil yang diperoleh dapat dijadikan acuan untuk estimasi proporsionalitas sumber daya terhadap X1 (nilai kontrak), X2 (durasi kegiatan), dan X3 (jumlah tingkat) dalam pembangunan struktur bangunan gedung di wilayah Manado untuk jenis bangunan bertingkat satu, dua, dan tiga. Kata Kunci : sumber daya, pemodelan, gedung, proporsional
Implementasi Keselamatan dan Kesehatan Kerja (K3) Proyek-Proyek Transmisi dan Jaringan 150 kV (Studi Kasus: Pekerjaan Proyek Transmisi dan Jaringan Lopana-Teling) Patkur, Hadi; Willar, Debby; Mandagi, Robert J. M.
JURNAL ILMIAH MEDIA ENGINEERING Vol 8, No 2 (2018): JURNAL ILMIAH MEDIA ENGINEERING
Publisher : Sam Ratulangi University

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

The transmission and network project work from one substation to the next substation is thetransmission and electrical network work that will pass through some administrative areas so that: itwill have differences in the customs, culture, language, and geographical location of theadministrative region. This work are very vulnerable and potential to contain the risk of workaccidents, because the location of projects that tend to be in the middle of the forest, through valleys,mountains and yard residents, and the level of difficulty of the work itself that will lead tovulnerabilities in occupational safety and health such as erection work and withdrawal cable that mustwork on altitude of at least 30 meters. With such a risky background, all personnel involved in thiswork, whether directly or indirectly, should be aware of the importance of safety and health (OHS)implementation procedures that must be used at the time of this work process. All personnel should beaware and understand that at the time of the project location they must be obedient, ta'at, anddiscipline to always comply and implement the procedures of Occupational Safety and Health (OSH).This study is limited to the implementation of occupational safety and health (OHS)procedures on the 150 kV Transmission and Network project from Lopana to Teling located in SouthMinahasa, Minahasa Induk and Manado.The aims of this study was to develop a safety and health (OSH) implementation procedure tomotivate employees / workers successfully and successfully to be used or applied to transmission andnetwork project work. The method used is a survey with correlation approach, to reveal the real stateof things experienced by workers.Based on the results of the research and discussion above, it can be concluded that thevariables of OSH (X1) equipment, OSH (X2) training, OSH (X3) discipline, and companymanagement (X4) simultaneously affect the implementation of OSH on transmission and networkproject work of 80 , 7% and the remaining 19.3% are other variables not included in this research,where the effect of OSH equipment on OSH implementation is (0.563) 2 = 31,7%. The effect of OSHtraining on OSH implementation is (0.632) 2 = 39.9%. The magnitude of the effect of OSH disciplineon the implementation of OSH is (0.584) 2 = 34.1%. The magnitude of the effect of corporatemanagement on the implementation of OSH is (0.339) 2 = 11.5%. Keywords: occupational safety and health, work accident, transmission and network project.
PERAN EXCAVATOR TERHADAP KINERJA PROYEK KONSTRUKSI RUMAH TINGGAL DI JAKARTA SELATAN Simanjuntak, Manlian Ronald. A.; Ferrari, -
JURNAL ILMIAH MEDIA ENGINEERING Vol 3, No 1 (2013): JURNAL ILMIAH MEDIA ENGINEERING
Publisher : Sam Ratulangi University

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Alat berat didalam ilmu teknik sipil adalah alat yang digunakan untuk membantu manusia dalam melakukan pekerjaan pembangunan suatu struktur. Penggunaan alat berat yang kurang tepat dengan kondisi dan situasi lapangan pekerjaan akan berpengaruh berupa kerugian antara lain rendahnya produksi, tidak tercapainya schedule yang telah ditentukan, atau kinerja proyek semakin menurun secara keseluruhan. Terdapat beraneka macam alat yang sering digunakan dalam pekerjaan konstruksi saat ini, antara lain: bulldozer, loader, excavator, motor grader, dump truck. Penelitian ini hanya alat konstruksi excavator yang dipakai untuk proyek konstruksi rumah tinggal yang pada saat proses konstruksi memerlukan galian, penggunaan alat konstruksi excavator menjadi penting seperti yang terjadi pada proyek gedung tinggi, jalan, dan jembatan. Untuk itu pada penelitian ini mencoba membuat suatu penelitian untuk proyek rumah tinggal dengan menggunakan excavator sebagai alat gali karena tenaga manusia dianggap kurang. Biaya sewa excavator untuk pekerjaan yang cukup mahal dan besarnya kubikasi galian tanah yang akan dikerjakan, menjadi landasan yang kuat alat konstruksi excavator dibutuhkan untuk meningkatkan kinerja proyek rumah tinggal. Rumah tinggal saat ini sudah banyak memiliki area bawah tanah seperti basement atau ruang-ruang lainnya layaknya gedung-gedung bertingkat. Permasalahan penelitian yang akan dikaji dalam penelitian ini yaitu peran excavator terhadap proyek konstruksi rumah tinggal di Jakarta Selatan. Secara umum salah satu faktor penting dalam proyek konstruksi adalah pemakaian alat konstruksi yang tepat guna memperlancar dan mempercepat kinerja proyek. Pemilihan alat penting untuk dilakukan karena sangat erat kaitannya dengan faktor faktor yang berpengaruh terhadap produktivitas alat itu sendiri. Oleh karena itu, melalui penelitian ini diharapkan akan meningkatkan kinerja pelaksanaan konstruksi khususnya proyek bangunan rumah tinggal di Jakarta Selatan Kata kunci : produktivitas, excavator, kinerja, rumah tinggal
ANALISIS SISTEM MANAJEMEN MUTU DAN PENGARUHNYA DALAM MENINGKATKAN KINERJA OPERASIONAL BANGUNAN GEDUNG TINGGI PERKANTORAN DI JAKARTA PUSAT Simanjuntak, Manlian Ronald A.; Suawa, Skarlet Sinta
JURNAL ILMIAH MEDIA ENGINEERING Vol 4, No 2 (2014): JURNAL ILMIAH MEDIA ENGINEERING
Publisher : Sam Ratulangi University

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Penelitian ini bertujuan untuk menganalisis aspek-aspek dari Sistem Manajemen Mutu serta pengaruh penerapannya terhadap kinerja operasional bangunan gedung tinggi perkantoran di Jakarta Pusat. Dalam penelitian ini, kerangka Sistem Manajemen Mutu dikembangkan sesuai dengan studi literatur yang komprehensif. Kerangka kerja ini menunjukkan hubungan antara Sistem Manajemen Mutu dan kinerja operasional bangunan gedung tinggi perkantoran di Jakarta Pusat. Instrumen penelitian yang digunakan adalah kuesioner yang bertujuan untuk mendapatkan data yang diperlukan bagi penelitian ini. Variabel-variabel penelitian didefinisikan melalui studi literatur, kemudian disusun menjadi daftar pertanyaan dalam bentuk kuesioner. Penyebaran kuesioner dilakukan kepada 70 responden terpilih yang bertanggung jawab langsung terhadap kegiatan building management (35 kuesioner dijawab dan dikembalikan). Analisis data menggunakan program statistik SPSS (Statistical Product and Service Solutions). Analisis yang dilakukan adalah uji validitas, uji reliabilitas, analisis korelasi, analisis faktor, analisis regresi, dan uji model. Hasil penelitian menunjukkan bahwa adanya hubungan positif antara Sistem Manajemen Mutu dan kinerja operasional bangunan gedung tinggi perkantoran di Jakarta Pusat. Hal itu dapat dibuktikan melalui hasil analisis yang diperoleh bahwa hubungan yang terjadi di antara keduanya adalah hubungan yang bersifat linear dengan menghasilkan dua variabel penentu. Kedua variabel tersebut yang merupakan aspek-aspek dari Sistem Manajemen Mutu adalah: a) mengetahui dan memahami kebutuhan dan harapan pemilik gedung dan b) mengambil tindakan perbaikan tepat terhadap hasil kerja yang tidak sesuai standar. Dengan demikian, Sistem Manajemen Mutu berpengaruh dalam meningkatkan kinerja operasional bangunan gedung tinggi perkantoran di Jakarta Pusat. Kata Kunci:     Bangunan Gedung Tinggi, Perkantoran, Kinerja, Tahap Operasional, sistem manajemen mutu
PENGEMBANGAN INFRASTRUKTUR PELABUHAN DALAM MENDUKUNG PEMBANGUNAN BERKELANJUTAN Putra, Adris A.; Djalante, Susanti
JURNAL ILMIAH MEDIA ENGINEERING Vol 6, No 1 (2016): JURNAL ILMIAH MEDIA ENGINEERING
Publisher : Sam Ratulangi University

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Pelabuhan sebagai infrastruktur transportasi laut mempunyai peran yang sangat penting dan strategis untuk pertumbuhan industri dan perdagangan serta merupakan segmen usaha yang dapat memberikan kontribusi bagi perekonomian dan pembangunan nasional  karena merupakan bagian dari mata rantai dari sistem  transportasi maupun logistik. Oleh karena itu dibutuhkan  pengelolaan pelabuhan dilakukan secara efektif, efisien, dan profesional sehingga pelayanan pelabuhan  menjadi lancar, aman, dan cepat. Transportasi laut sangat berperan dalam distribusian barang dan jasa di Indonesia khususnya pulau-pulau di Bagian Timur Indonesia. Untuk menunjang perantersebut dibutuhkan dukungan infrastruktur pelabuhan dengan fasilitas yang mencukupi.Salah satu pelabuhan di kawasan ini yang memiliki posisi staregis yang baik untuk dikembangkan berdasarkan potensi perekonomian untuk meningkatkan pembangunan wilayah adalah Pelabuhan Bungkutoko  Penelitian ini bertujuan untuk menganalisis infrastruktur Pelabuhan dan dan merumuskan strategi pengembangan pelabuhan. Lokasi penelitian terletak di PelabuhanBungkutoko Kendari Sulawesi Tenggara. Penelitian ini bersifat deskriptif dengan pendekatan kualitatif dan kuantitatif, yang bertujuan untuk menggambarkan secara sistematis kebutuhan pelayanan pelabuhan. Desain penelitian yang dilaksanakanmenggunakan metode survey atau langsung ke lokasi penelitian dengan tujuan untuk memperoleh data dan informasi yang akurat. Hasil penelitian menunjukan operasional pelayanan Pelabuhan Bungkutoko Kendari menunjukkan bahwa  rata-rata kapal bekerja di tambatan (ET) yaitu 36.48 jam dan rataratalamanya satu kapal berada di pelabuhan (BT) yaitu 85.41 jam, pemanfaatan dermaga (BOR) kurang baik yaitu 56.50 %. Pemanfaatan gudang/lapangan penumpukan relatif rendah karena menggunakan sistem truck lossing. Kebutuhan dermaga petikemas di Pelabuhan Bungkutoko memerlukan pembangunan 1 unit dermaga, pelayanan angkutan petikemas dan multiguna sangat lambat dibanding kebutuhan sehinggapelayanan waktu kapal dan kelancaran komoditi belum begitu memuaskan masyarakat.Fasilitas dermaga dan lapangan penumpukan pada umumnya kritis untuk menghadapi pertumbuhan lalu lintas angkutan laut untuk periode 5 tahun mendatang. Strategi pengembangan yaitu perluasan pembangunan infrastruktur, dengan kebijakanmeningkatan investasi pemerintah di bidang infrastruktur,meningkatan dan perluasan kapasitas infrastruktur dan peningkatan akses jaringan jalan wilayah pelabuhanKata kunci: Pengembangan,Transportasi,Pelayanan,Pelabuhan

Page 4 of 22 | Total Record : 218


Filter by Year

2011 2024


Filter By Issues
All Issue Vol. 14 No. 3 (2024): Jurnal Ilmiah Media Engineering Vol. 14 No. 2 (2024): JURNAL ILMIAH MEDIA ENGINEERING Vol. 13 No. 1 (2023): JURNAL ILMIAH MEDIA ENGINEERING Vol. 12 No. 3 (2022): JURNAL ILMIAH MEDIA ENGINEERING Vol. 12 No. 2 (2022): JURNAL ILMIAH MEDIA ENGINEERING Vol 11, No 3 (2021): JURNAL ILMIAH MEDIA ENGINEERING Vol 11, No 2 (2021): JURNAL ILMIAH MEDIA ENGINEERING Vol 11, No 1 (2021): JURNAL ILMIAH MEDIA ENGINEERING Vol 10, No 2 (2020): JURNAL ILMIAH MEDIA ENGINEERING Vol 10, No 1 (2020): JURNAL ILMIAH MEDIA ENGINEERING Vol 9, No 1 (2019): JURNAL ILMIAH MEDIA ENGINEERING Vol 8, No 2 (2018): JURNAL ILMIAH MEDIA ENGINEERING Vol 7, No 4 (2017): Jurnal Ilmiah Media Engineering Vol 7, No 3 (2017): JURNAL ILMIAH MEDIA ENGINEERING Vol 6, No 3 (2016): JURNAL ILMIAH MEDIA ENGINEERING Vol 6, No 2 (2016): JURNAL ILMIAH MEDIA ENGINEERING Vol 6, No 1 (2016): JURNAL ILMIAH MEDIA ENGINEERING Vol 5, No 2 (2015): JURNAL ILMIAH MEDIA ENGINEERING Vol 5, No 1 (2015): JURNAL ILMIAH MEDIA ENGINEERING Vol 4, No 4 (2014): JURNAL ILMIAH MEDIA ENGINEERING Vol 4, No 3 (2014): JURNAL ILMIAH MEDIA ENGINEERING Vol 4, No 2 (2014): JURNAL ILMIAH MEDIA ENGINEERING Vol 4, No 1 (2014): JURNAL ILMIAH MEDIA ENGINEERING Vol 3, No 3 (2013): JURNAL ILMIAH MEDIA ENGINEERING Vol 3, No 2 (2013): JURNAL ILMIAH MEDIA ENGINEERING Vol 3, No 1 (2013): JURNAL ILMIAH MEDIA ENGINEERING Vol 2, No 4 (2012): JURNAL ILMIAH MEDIA ENGINEERING Vol 2, No 3 (2012): JURNAL ILMIAH MEDIA ENGINEERING Vol 2, No 2 (2012): JURNAL ILMIAH MEDIA ENGINEERING Vol 2, No 1 (2012): JURNAL ILMIAH MEDIA ENGINEERING Vol 1, No 2 (2011): JURNAL ILMIAH MEDIA ENGINEERING Vol 1, No 1 (2011): JURNAL ILMIAH MEDIA ENGINEERING More Issue