cover
Contact Name
Widodo Kushartomo
Contact Email
widodokushartomo@gmail.com
Phone
+628176869150
Journal Mail Official
jmts@untar.ac.id
Editorial Address
Jl. Letjen S. Parman No. 1, Jakarta 11440
Location
Kota adm. jakarta barat,
Dki jakarta
INDONESIA
JMTS: Jurnal Mitra Teknik Sipil
ISSN : -     EISSN : 2622545X     DOI : http://dx.doi.org/10.24912/jmts
Core Subject : Engineering,
JMTS: Jurnal Mitra Teknik Sipil dikelola oleh Program Studi Sarjana Teknik Sipil, Fakultas Teknik, Universitas Tarumanagara. JMTS: Jurnal Mitra Teknik Sipil merupakan media publikasi hasil penelitian dan studi ilmiah dalam bidang Teknik Sipil yang diterbitkan 4 kali dalam setahun, yaitu pada bulan Februari, Mei, Agustus, dan November. Jurnal ini terbit pertama kali pada 1 Agustus 2018.
Articles 861 Documents
WASTE MATERIAL BETON PADA PROYEK KONSTRUKSI DI JAKARTA Kevin Liman; Hendrik Sulistio
JMTS: Jurnal Mitra Teknik Sipil Volume 3, Nomor 1, Februari 2020
Publisher : Prodi Sarjana Teknik Sipil, FT, Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24912/jmts.v3i1.7066

Abstract

Waste material can be interpreted as undesirable or valueless material for ordinary or primary purposes in the manufacture or use. This study aims to determine how much the remaining material that occurs in concrete construction work and the form of handling carried out to prevent material waste. The purpose of this study was to determine how much material waste occurred, losses caused by material waste and to find out the cause of material waste. The research sample taken was a low rise building project in Jakarta and its surroundings. The method used in data collection is field observations and interviews. Data obtained in the form of Bill of Quantity, working drawings, or monthly reports. Data analysis using quantitative analysis to determine the largest type of material and losses in concrete work calculated by the regression method assisted by the SPSS program to get the large losses that occur in concrete construction work. The results obtained are the largest residual construction material in concrete construction is 7.05% for low rise building projects in Jakarta and surrounding areas and losses (%) that have a regression such as the following Y = -1.640 + 0.669 X1 + 0.481 X2 + 0.098 X3.AbstrakWaste material can be interpreted as undesirable or valueless material for ordinary or primary purposes in the manufacture or use. This study aims to determine how much the remaining material that occurs in concrete construction work and the form of handling carried out to prevent material waste. The purpose of this study was to determine how much material waste occurred, losses caused by material waste and to find out the cause of material waste. The research sample taken was a low rise building project in Jakarta and its surroundings. The method used in data collection is field observations and interviews. Data obtained in the form of Bill of Quantity, working drawings, or monthly reports. Data analysis using quantitative analysis to determine the largest type of material and losses in concrete work calculated by the regression method assisted by the SPSS program to get the large losses that occur in concrete construction work. The results obtained are the largest residual construction material in concrete construction is 7.05% for low rise building projects in Jakarta and surrounding areas and losses (%) that have a regression such as the following Y = -1.640 + 0.669 X1 + 0.481 X2 + 0.098 X3.
ANALISIS MOMEN NOMINAL ULTIMIT TIANG BOR UNTUK DIGUNAKAN PADA PERHITUNGAN METODE BROMS Reynard Julio Widjaja; Gregorius Sandjaja Sentosa
JMTS: Jurnal Mitra Teknik Sipil Volume 3, Nomor 2, Mei 2020
Publisher : Prodi Sarjana Teknik Sipil, FT, Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24912/jmts.v3i2.7040

Abstract

Foundation is the lowest part of construction that is important to bear the burden of the building above it. In this analysis, used the calculation of circle cross section analysis to get the nominal moment that can be hold to bore piled that have a diameter 30 cm to 100 cm, other than that used the different of concrete quality, concrete quality that used in this analysis is 22.5 MPa, 25 MPa, and 30 MPa. The amount of reinforcement used is also different, such as 4 reinforcement, 6 reinforcement and 8 reinforcement. The reduction factor that used is the conservative number which is 0.65. After obtained the value of ultimate moment, used the Broms chart to get the value of Hu and H. From the calculation, the result between 50 kNm to 2244 kNm. Based on the comparison with Pile Foundation from brochure, ultimate moment of the Pile Foundation is stronger than the ultimate moment of the bored pile eith 340 kNm for pile foundation dan 206 kNm for bored pile.AbstrakFondasi merupakan bagian paling bawah dari suatu konstruksi yang penting untuk memikul beban bangunan di atasnya. Dalam analisis ini digunakan perhitungan analisis penampang lingkaran yang berguna untuk mencari momen nominal yang dapat ditahan oleh tiang bor yang memiliki diameter 30 cm sampai 100 cm, selain itu digunakan juga mutu beton yang berbeda, mutu beton yang dipakai dalam analisis ini adalah mutu beton fc’ 22.5 MPa, fc’ 25 MPa, dan fc’ 30 MPa. Jumlah tulangan yang dipakai pun juga berbeda yaitu 4 tulangan, 6 tulangan dan 8 tulangan. Untuk faktor reduksi kekuatan sendiri angka yang diambil adalah angka yang konservatif yaitu 0.65 agar lebih aman. Dari hasil perhitungan, momen ultimit diperoleh antara 50 kNm sampai 2244 kNm. Setelah didapat nilai momen ultimit, momen dimasukkan ke dalam grafik Broms agar mendapatkan nilai Hu dan Hijin. Berdasarkan hasil perbandingan dengan tiang pancang yang didapat dari brosur, momen ultimit tiang pancang lebih kuat daripada momen ultimit dari tiang bor dengan momen 340 kNm untuk tiang pancang dan 206 kNm untuk tiang bor.
EFEK GAYA VERTIKAL PADA TANAH DENGAN INDEKS PLASTISITAS TINGGI TERHADAP WILAYAH SEKITAR PROYEK DI JAKARTA UTARA Staventram Inri; Alfred Jonathan Susilo
JMTS: Jurnal Mitra Teknik Sipil Volume 3, Nomor 2, Mei 2020
Publisher : Prodi Sarjana Teknik Sipil, FT, Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24912/jmts.v3i2.7080

Abstract

Soil improvement is common in construction work to increase the bearing capacity of the soil so the soil can carry the burden of construction which will stand on that soil. The method often used is soil compaction to increase bearing capacity. Soil compaction results in a lateral movement of soil particles and causes an increase in soil pore water pressure. Soil compaction here uses drum roller and dynamic compaction. This gives an effect at a certain distance and has the potential to damage the surrounding buildings. Therefore, the engineer needs to predict a safe distance from the effects of the compaction process. This research conducted with theoretical predictions about the amount of lateral movement due to compaction with certain formulas. The same thing will happen when the driven pile is piling, it will cause around the pile lift up (pile heaving). The results of this theoretical prediction will be compared then compare with the results of measurements of lateral movements performed using general shear failure from Terzaghi method and stress distribution Boussinesq method. Both of the results will be compared as conclusions.AbstrakPerbaikan tanah sudah umum dilakukan dalam pekerjaan konstruksi dengan tujuan untuk meningkatkan daya dukung tanah agar dapat memikul beban konstruksi yang akan berdiri di atasnya. Metode yang sering digunakan yaitu pemadatan tanah untuk meningkatkan daya dukungnya. Pemadatan tanah mengakibatkan desakan butiran tanah ke arah lateral serta menimbulkan kenaikan tekanan air pori tanah. Pemadatan disini menggunakan tandem roller dan dynamic compaction. Hal ini memberikan pengaruh hingga jarak tertentu dan berpotensi merusak bangunan di sekitar. Oleh karena itu, perlu diprediksi jarak yang aman dari pengaruh proses pemadatan. Penelitian ini dilakukan dengan prediksi teoritis besarnya pergerakan tanah ke arah lateral akibat pemadatan dengan formula tertentu. Hal yang serupa juga sama ketika tiang pancang ditumbuk, akan menyebabkan tiang di sebelahnya terangkat (pile heaving). Hasil prediksi secara teori ini kemudian dibandingkan dengan hasil pengukuran kegagalan geser berdasarkan metode Terzaghi dan distribusi tegangan Boussinesq. Hasil keduanya akan dibandingkan sebagai kesimpulan.
PENERAPAN METODE LINEAR PROGRAMMING DALAM PENENTUAN KOMBINASI POTONGAN PADA PEKERJAAN BEKISTING DI PROYEK X Teosaner Yutanesy; Iwan B. Santoso
JMTS: Jurnal Mitra Teknik Sipil Volume 3, Nomor 2, Mei 2020
Publisher : Prodi Sarjana Teknik Sipil, FT, Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24912/jmts.v3i2.6983

Abstract

ABSTRACTConventional formwork using wood as the main material. Installation of wooden planks requires planned cuts to match the planned dimensions. One method that can be used to calculate the optimal result of selection of chunks is the linear programming method. First, determine the size of the combination of pieces that allow it to be done and according to the planned dimensions. Secondly, it modeled a single equation that optimizes the use of wooden planks after determining the size. Lastly, it outlines limiting equations to optimize wooden planks in the provision of materials for 3 floors and reuse 3 times. From modeling linear programming obtained for the provision of 3 floors material and reuse 3 times required wooden board as much as 2310.05 sheets, provision of 2 floors material and reuse 3 times required wooden board as much as 1925.04 sheets and provision of materials 2 floors and Reuse 4 times the required wooden board as much as 1540.03 sheets. The results of the comparison between the calculation of the area of work with linear programming modeling showed a decrease in the need for wood planks by 2.7%.ABSTRAKPekerjaan bekisting konvensional menggunakan kayu sebagai material utama. Agar pemasangan dari papan kayu dapat dilakukan dengan baik diperlukan perencanaan pemotongan yang sesuai dengan dimensi yang direncanakan. Salah satu metode yang dapat digunakan untuk menghitung hasil optimal pemilihan potongan adalah metode linear programming. Pertama, menentukan ukuran dari kombinasi potongan yang memungkinan untuk dilakukan dan sesuai dengan dimensi yang direncanakan. Kedua, memodelkan satu persamaan yang mengoptimalisasi penggunaan papan kayu setelah menentukan ukuran tersebut. Terakhir, menguraikan persamaan-persamaan yang membatasi untuk mengoptimalisasi papan kayu dalam penyediaan material untuk 3 lantai dan reuse 3 kali. Dari pemodelan linear programming didapatkan untuk penyediaan material 3 lantai dan reuse 3 kali diperlukan papan kayu sebanyak 2310,05 lembar, penyediaan material 2 lantai dan reuse 3 kali diperlukan papan kayu sebanyak 1925,04 lembar dan penyediaan material 2 lantai dan reuse 4 kali diperlukan papan kayu sebanyak 1540,03 lembar. Hasil perbandingan antara perhitungan luas pekerjaan dengan pemodelan linear programming menunjukkan penurunan pembelian papan kayu sebanyak 2,7 %.
ANALISIS PENGGUNAAN CARBON FIBER REINFORCED PLATE PADA KAPASITAS LENTUR BETON BERTULANG DENGAN METODE ELEMEN HINGGA Alvin Purmawinata; Edison Leo
JMTS: Jurnal Mitra Teknik Sipil Volume 3, Nomor 2, Mei 2020
Publisher : Prodi Sarjana Teknik Sipil, FT, Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24912/jmts.v3i2.6952

Abstract

Structural strengthening is needed when a structure has degrading servicability, but it is also required  for structures that have changed functions and anticipate due to errors in design and implementation of construction. Strengthening that is popular now is using Carbon Fiber Reinforced Polymer (CFRP). Besides being strong, the installation is very fast and the operation can continue without being interrupted. To analyze the calculation of this structural strengthening, it will refer to ACI 440.2R-17 because Indonesia does not yet have regulations that govern it. Then we need another method to analyze the strengthening of this structure as a comparison, the finite element method. In this research, a bending capacity analysis will be carried out on reinforced concrete beams reinforced with CFRP Plate. Modeling is done by modeling reinforced concrete blocks without strengthening (BT), with reinforcement CFRP Plate (BTF). The result is that the addition of CFRP  plates to reinforced concrete beams can increase the flexural capacity by 103.5% but the deflection decreases by 68.9%. . CFRP Plate used has not reached the optimum strength according to specifications. The maximum stresses on CFRP on BTF beam are only 69.5% of its tensile strength. However, according to the ACI 440.2R-17 calculation, the CFRP stress and strain are also reduced and are not designed based on the stress and strain according to specifications. Stress design of  CFRP  on BTF beam according to the ACI 440.2R-17 calculation is only 38.1% of its tensile strength.AbstrakPerkuatan struktur diperlukan saat struktur sudah mengalami penurunan daya layan,selain itu juga perlu dilakukan untuk struktur yang mengalami perubahan fungsi maupun mengantisipasi akibat kesalahan perancangan maupun pelaksanaan konstruksi.. Perkuatan yang sedang populer kini adalah menggunakan Carbon Fiber Reinforced Polymer (CFRP) . Selain kuat, pemasangannya sangat cepat dan operasional dapat terus berjalan tanpa terganggu. Untuk menganalisis perhitungan perkuatan struktur ini, akan mengacu kepada ACI 440.2R-17 karena Indonesia belum memiliki peraturan yang mengatur. Maka diperlukan metode lain sebagai pembanding yaitu metode elemen hingga. Dalam penelitian ini, akan dilakukan analisis kapasitas lentur terhadap balok beton bertulang yang diberi perkuatan CFRP Plate. Pemodelan dilakukan dengan memodelkan balok beton bertulang tanpa perkuatan (BT) ,dengan perkuatan CFRP Plate (BTF). Hasilnya adalah dengan penambahan CFRP Plate pada balok beton bertulang dapat meningkatkan beban kuat lentur sebesar 103,5 % namun lendutannya turun sebesar 68,9 %. CFRP Plate yang digunakan belum mencapai kekuatan optimum sesuai spesifikasi. Tegangan maksimum pada CFRP pada balok BTF  hanya 69,5% dari kuat tariknya. Akan tetapi, menurut perhitungan ACI 440.2R-17 , tegangan dan regangan CFRP juga direduksi dan tidak didesain berdasarkan tegangan dan regangan sesuai spesifikasi. Tegangan CFRP desain pada balok BTF menurut perhitungan ACI 440.2R-17 hanya 38,1% dari kuat tariknya.
ANALISIS PENURUNAN PADA TIMBUNAN DENGAN PREFABRICATED VERTICAL DRAIN (PVD) MENGGUNAKAN DATA HASIL UJI CPTu Tomy Gunawan; Alfred Jonathan S; Ali Iskandar
JMTS: Jurnal Mitra Teknik Sipil Volume 3, Nomor 1, Februari 2020
Publisher : Prodi Sarjana Teknik Sipil, FT, Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24912/jmts.v3i1.7046

Abstract

Investigation of soil is important to do in the planning of building construction such as foundations, piles, roads, etc. To find out the bearing capacity and parameters of the soil where a building will be built. Investigation of the soil can be done in various ways, one of which uses an electrical cone penetration test with pore water pressure. In the embankment project for the calculations on the soil so that it can be known about the settlement in soil and the length of time it reaches the hydrostatic level. Cone penetraton test is reqired and the results produce data in the form of cone resistance (qc), blanket friction (fs) and pore pressure (u) which will be processed in the CPET-IT program in order to produce soil parameters that will be used for soil settlement analysis. To find out the settlement of embankment soil, it will be supported by finite difference program. Results of studies on general is to find the effectiveness of embankment using prefabricated vertical drain (PVD) and without prefabricated vertical drain (PVD).AbstrakPenyelidikan terhadap tanah penting untuk dilakukan pada perencanaan konstruksi bangunan seperti pondasi, timbunan, jalan, dll. Untuk mengetahui daya dukung dan parameter-parameter tanah tempat akan dibangunnya sebuah bangunan Penyelidikan tanah dapat dilakukan dengan berbagai macam cara salah satunya adalah menggunakan  uji sondir elektrik dengan tekanan air pori. Pada proyek timbunan memerlukan perhitungan pada tanahnya agar dapat diketahui besarnya penurunan pada tanah dan lama waktu tanah mencapai keadaan hidrostatis. Sehingga dilakukan uji sondir secara elektrik dan dari hasil uji sondir menghasilkan data berupa tahanan konus (qc), gesekan selimut (fs) dan pore pressure (u) yang akan diolah kedalam program CPET-IT agar menghasilkan parameter-parameter tanah yang akan digunakan untuk analisis penurunan pada tanah.Untuk mengetahui besarnya penurunan pada tanah timbunan maka akan dibantu program berbasis elemen higga. Hasil studi secara umum menunjukkan seberapa besar efektivitas pada timbunan dengan menggunakan prefabricated vertical drain (PVD) dan tanpa prefabricated vertical drain (PVD).
KAJIAN EFISIENSI PERENCANAAN PC-I GIRDER DENGAN MENGGUNAKAN SISTEM STRAND 0,5” DAN 0,6” TERHADAP KEKUATAN DAN BIAYA Jessen Richarlim; Edison Leo
JMTS: Jurnal Mitra Teknik Sipil Volume 3, Nomor 1, Februari 2020
Publisher : Prodi Sarjana Teknik Sipil, FT, Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24912/jmts.v3i1.6930

Abstract

Prestressed concrete can be defined as concrete that given internal compressive stress such that it can reduce the tensile stress caused by external load to a certain condition. Stressing applied by pulling the tendon that has been installed on the concrete. 0,5” strand system are usually used for medium span. While 0,6” strand system is used for long span bridge. The purpose of this study was to determine the efficiency of PC-I girder using 0,5 "and 0,6" strands in terms of strength and cost. Strength analysis can be calculated by stress analysis, ultimate moment analysis and deflection analysis, while for cost analysis is a comparison of the cost composition between the 0,5 "and 0,6" strand system for each structural model reviewed. Structural modeling with hinge-roll at both ends and working loadings are dead load, additional dead load and live load. Loss of prestress force that is calculated depend on SNI 1725:2016 about loading for the bridge. The analysis shows that the use of the 0,5” strand has a better cost efficiency compared to the 0,6" strand. This can be seen from the design costs of the 0,5" strand system structure model is smaller than the 0,6" strand system structure model. AbstrakBeton prategang dapat didefinisikan sebagai beton yang diberikan tegangan tekan internal sedemikian rupa sehingga dapat mengurangi tegangan tarik yang terjadi akibat beban eksternal sampai suatu batas tertentu. Pemberian tegangan dilakukan dengan cara penarikan tendon yang telah diinstalasi pada beton. Sistem strand ukuran 0,5” biasanya digunakan untuk konstruksi jembatan bentang menengah. Sedangkan sistem strand ukuran 0,6” digunakan untuk konstruksi jembatan bentang panjang. Tujuan dari penelitian ini adalah untuk mengetahui efisiensi perencanaan PC-I girder dengan menggunakan strand 0,5” dan 0,6” dalam segi kekuatan dan biayanya. Analisis segi kekuatan berupa analisis tegangan, analisis momen ultimit dan analisis lendutan sedangkan untuk analisis segi biaya berupa perbandingan komposisi biaya yang dihasilkan dengan sistem strand 0,5” dan 0,6” untuk setiap model struktur yang ditinjau. Pemodelan struktur dengan perletakan sendi-rol pada kedua ujungnya dan pembebanan yang bekerja berupa beban mati, beban mati tambahan dan beban hidup. Kehilangan gaya prategang yang diperhitungkan sesuai dengan peraturan SNI 1725:2016 tentang Pembebanan Untuk Jembatan. Hasil analisis menunjukkan bahwa penggunaan strand 0,5” memiliki efisiensi biaya yang lebih baik dibandingkan dengan strand 0,6”. Hal ini dilihat dari biaya desain model struktur sistem strand 0,5” lebih kecil dibandingkan dengan model struktur sistem strand 0,6”.
ANALISIS PENGGUNAAN PREFABRICATED VERTICAL DRAINS (PVD) PADA TANAH LEMPUNG LUNAK YANG TERDAPAT LAPISAN LENSA Andreyan Prasetio; Aniek Prihatiningsih
JMTS: Jurnal Mitra Teknik Sipil Volume 3, Nomor 1, Februari 2020
Publisher : Prodi Sarjana Teknik Sipil, FT, Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24912/jmts.v3i1.7047

Abstract

Problem that often occurs in soft cohesive soils is settlement caused by consolidation process. If  construction activities doing when the soils has not been consolidated, settlement can occur. To accelerate  the consolidation process, soil improvement are usually do, one method of soil improvement to accelarate the consolidation process is vertical drain using prefabricated vertical drains (PVD). The soft soil layers in the field are not always continuous, sometimes found soft soil layers that have a lens layer. In this study, will discuss about the settlement and consolidation time of soft  soil layers that have a lens layer which has been improved by PVD with 1 meter distance. Infrastructure that stand on a location that is installed by PVD is taxiway and loading by Airbus A380 aircraft of 18,22ton/m2. Analysis using the 1 dimensional consolidation theory of Terzaghi. For PVD installation to a depth of 50 meters, preloading settlement of 234,80 cm with a consolidation time of  2260 days for the square pattern PVD and 1918 days for triangle pattern PVD. Post loading settlement for PVD installation depth of 50 meters by 2,50 cm. AbstrakMasalah yang sering terjadi pada tanah kohesif dan lunak adalah penurunan yang disebabkan proses konsolidasi. Penurunan dapat menyebabkan keretakan pada struktur konstruksi yang berada di atasnya. Jika suatu kegiatan konstruksi dilakukan saat tanah belum terkonsolidasi, maka konstruksi tersebut dapat mengalami penurunan.. Untuk mempercepat proses konsolidasi biasanya dilakukan perbaikan tanah, salah satu metode perbaikan tanah untuk mempercepat proses konsolidasi yaitu vertical drain dengan menggunakan prefabricated vertical drains (PVD). Lapisan tanah lunak yang terdapat di lapangan tidak selalu kontinu, terkadang ditemukan lapisan tanah lunak yang terdapat lapisan lensa. Pada penelitian ini, penulis akan membahas mengenai waktu konsolidasi yang dibutuhkan oleh lapisan tanah kohesif dan lunak yang terdapat lapisan lensa yang telah diperbaiki dengan menggunakan PVD berjarak 1 meter. Infrastruktur yang berdiri di atas lokasi yang dipasang PVD berupa taxiway dengan beban berupa pesawat Airbus A380 sebesar 18,22 ton/m2. Analisis dilakukan menggunakan teori konsolidasi 1 dimensi Terzaghi. Untuk pemasangan PVD hingga kedalaman 50 meter diperoleh penurunan pra pembebanan sebesar 234,80 cm dengan waktu konsolidasi selama 2260 hari untuk pemasangan PVD pola persegi dan selama 1918 hari untuk pola segitiga . Penurunan pasca pembebanan untuk pemasangan PVD hingga kedalaman 50 meter sebesar 2,5 cm.
FAKTOR DEMOGRAFI DOMINAN YANG MEMPENGARUHI PROYEK KONSTRUKSI JALAN DI PEDESAAN INDONESIA Samuel Semaya; Basuki Anondho
JMTS: Jurnal Mitra Teknik Sipil Volume 3, Nomor 1, Februari 2020
Publisher : Prodi Sarjana Teknik Sipil, FT, Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24912/jmts.v3i1.6975

Abstract

National development for almost 70 years since independence Indonesia has produced various advances, but it was realized that the development process carried out so far turned out to have caused a residual problem of development inequality, especially in rural areas. the development approach which only emphasizes macroeconomic growth tends to lead to a large development gap between regions. Therefore, this study would like to conduct a study of the dominant demographic characteristic factors affecting construction projects in rural Indonesia. The research was conducted by distributing questionnaires to contractors selected by the Ministry of Village. The source of the questionnaire used is through previously identified journals and books. The method used in analyzing data is factor analysis. Data analysis was carried out starting from the validity test, reliability test, KMO test, MSA test, communality test, and determining the dominant influence factor. Based on the data analysis conducted, it was concluded that the most dominant demographic characteristic factors affecting road construction projects in rural Indonesia were education, gender, age, urbanization, and labor.AbstrakPembangunan nasional selama hampir 70 tahun sejak Indonesia merdeka telah menghasilkan berbagai kemajuan, namun disadari bahwa proses pembangunan yang dilaksanakan selama ini ternyata telah menimbulkan residu masalah kesenjangan pembangunan, khususnya wilayah pedesaan. pendekatan pembangunan yang hanya menekankan pada pertumbuhan ekonomi makro, cenderung menimbulkan terjadinya kesenjangan pembangunan antar wilayah yang cukup besar. Oleh karena itu, studi ini ingin melakukan penelitian tentang faktor demografi dominan yang mempengaruhi proyek konstruksi jalan di pedesaan Indonesia. penelitian dilakukan dengan penyebaran kuesioner kepada kontraktor yang dipilih oleh Kementerian Desa. Sumber kuesioner yang digunakan adalah melalui jurnal dan buku yang telah diidentifikasi lebih dulu. Metode yang dipakai dalam menganalisis data adalah analisis faktor. Analisis data dilakukan mulai dari uji validitas, uji reliabilitas, uji KMO, uji MSA, uji komunalitas, dan menentukan faktor pengaruh dominan. Berdasarkan analisis data yang dilakukan, diperoleh kesimpulan bahwa faktor demografi yang paling dominan yang mempengaruhi terhadap proyek konstruksi jalan di pedesaan Indonesia adalah pendidikan, jenis kelamin, usia, urbanisasi, dan tenaga kerja.
PERBANDINGAN METODE EARNED VALUE, EARNED SCHEDULE, DAN KALMAN FILTER EARNED VALUE UNTUK PREDIKSI DURASI PROYEK Andree Sugiyanto; Onnyxiforus Gondokusumo
JMTS: Jurnal Mitra Teknik Sipil Volume 3, Nomor 1, Februari 2020
Publisher : Prodi Sarjana Teknik Sipil, FT, Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24912/jmts.v3i1.7069

Abstract

In the world of construction, control is needed at the implementation stage, which is prediction or forecasting duration project schedule. Estimated project schedule is an important part for project management making decisions that affect the future of the project. Forecasting method commonly used by practitioners in this case the construction project contractor in evaluating prediction of duration is deterministic forecasting method Earned Value Method (EVM), Earned Schedule Method (ESM). Kalman Filter Earned Value Method (KEVM) as probabilistic forecasting method is carried out to produce more accurate predictive value. The purpose of this study to compare the accuracy of three methods. This research was conducted by calculating duration of the project from EVM, ESM, and KEVM on maintenance and reconstruction projects of Jakarta-Cikampek and Jakarta-Tangerang toll roads. The data used from the project control data S-curve. The control data is processed with EVM, ESM, KEVM to determine the comparison between three methods of predicting duration. Prediction results of three methods were tested with Mean Absolute Percentage Error (MAPE). The results of this study indicate that KEVM can reduce errors after Kalman Filter is performed on estimated duration using EVM. ESM duration prediction yields the smallest MAPE value of the three methods. AbstrakDalam dunia pembangunan konstruksi dibutuhkan pengendalian pada tahap pelaksanaan yaitu prediksi atau peramalan durasi jadwal proyek. Perkiraan jadwal proyek adalah bagian penting untuk manajemen proyek membuat keputusan yang mempengaruhi masa depan proyek. Metode peramalan yang umum digunakan para praktisi dalam hal ini kontraktor proyek konstruksi dalam mengevaluasi prediksi durasi adalah metode peramalan deterministik Earned Value Method (EVM), Earned Schedule Method (ESM). Kalman Filter Earned Value Method (KEVM) sebagai metode peramalan probabilistik dilakukan untuk menghasilkan nilai prediksi yang lebih akurat. Tujuan penelitian ini membandingkan akurasi dari ketiga metode. Penelitian ini dilakukan dengan menghitung durasi proyek dari EVM, ESM, dan KEVM pada proyek pemeliharaan dan rekonstruksi jalan tol Jakarta – Cikampek dan Jakarta – Tangerang. Data yang digunakan dari proyek tersebut adalah data-data pengendalian berupa kurva S. Data pengendalian tersebut diolah dengan EVM, ESM, KEVM untuk mengetahui perbandingan antara ketiga metode prediksi durasi tersebut. Hasil prediksi dari ketiga metode diuji dengan Mean Absolute Percentage Error (MAPE). Hasil dari penelitian ini menunjukkan bahwa KEVM dapat mengurangi kesalahan setelah dilakukan Kalman Filter pada perkiraan durasi menggunakan Earned Value Method. Prediksi durasi ESM menghasilkan nilai MAPE yang paling kecil dari ketiga metode.