cover
Contact Name
Widodo Kushartomo
Contact Email
widodokushartomo@gmail.com
Phone
+628176869150
Journal Mail Official
jmts@untar.ac.id
Editorial Address
Jl. Letjen S. Parman No. 1, Jakarta 11440
Location
Kota adm. jakarta barat,
Dki jakarta
INDONESIA
JMTS: Jurnal Mitra Teknik Sipil
ISSN : -     EISSN : 2622545X     DOI : http://dx.doi.org/10.24912/jmts
Core Subject : Engineering,
JMTS: Jurnal Mitra Teknik Sipil dikelola oleh Program Studi Sarjana Teknik Sipil, Fakultas Teknik, Universitas Tarumanagara. JMTS: Jurnal Mitra Teknik Sipil merupakan media publikasi hasil penelitian dan studi ilmiah dalam bidang Teknik Sipil yang diterbitkan 4 kali dalam setahun, yaitu pada bulan Februari, Mei, Agustus, dan November. Jurnal ini terbit pertama kali pada 1 Agustus 2018.
Articles 861 Documents
PENGARUH KEMIRINGAN FONDASI TIANG PANCANG BATTERED PILE PADA TANAH LEMPUNG DAN TANAH PASIR Swendrinata Suwardi; Andryan Suhendra
JMTS: Jurnal Mitra Teknik Sipil Volume 3, Nomor 2, Mei 2020
Publisher : Prodi Sarjana Teknik Sipil, FT, Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24912/jmts.v3i2.7057

Abstract

The Battered Pile  is one of the foundation designs that aims to increase the lateral bearing capacity of the foundation. Battered Pile are designed with a certain slope that aims to increase the lateral capacity of the soil. The type of soil used will affect the lateral capacity of the pole. Calculation of bearing capacity of the pile is carried out on the condition of clay and sand soils at slope 00 to +200. The calculation results will then be analyzed to understand the effects that occur. The calculation results will be presented in the p-y curve method. The use of this method is expected to make it easier to understand the characteristics of Battered Pile for soil conditions. Based on the analysis it was found that an increase in the  capacity of the pile up to 23% in the slope of 100 to 150. Sand soil in conditions below the surface of the ground water will have a linear carrying capacity and have a lower deflection value when compared to clay soil at a depth of 2 meters. But at a depth of 16 meters, clay has a point where it has a lower deflection value compared to sandy soil.AbstrakTiang pancang Battered Pile merupakan salah satu rekasaya fondasi yang bertujuan untuk meningkatkan daya dukung lateral fondasi. Tiang Battered Pile dipancang dengan kemiringan tertentu yang bertujuan untuk meningkatkan daya dukung lateral tanah. Jenis tanah yang digunakan akan mempengaruhi daya dukung lateral tiang. Perhitungan daya dukung tiang dilakukan pada kondisi tanah lempung dan tanah pasir pada kemiringan 00 hingga +200. Hasil perhitungan kemudian akan dianalisis untuk memahami pengaruh yang terjadi. Hasil perhitungan akan disajikan dalam metode p-y curve. Penggunaan metode ini diharapkan dapat memudahkan dalam memahami karakteristik tiang Battered Pile terhadap kondisi tanah. Berdasarkan analisis didapatkan bahwa terjadi peningkatan daya dukung tiang hingga 23% pada kemiringan 100 hingga 150. Tanah pasir pada kondisi di bawah permukaan air tanah akan mengalami kenaikan daya dukung secara linier  dan memiliki  nilai lendutan yang lebih kecil jika dibandingkan dengan tanah lempung pada kedalaman 2 meter. Tetapi pada kedalaman 16 meter, tanah lempung memiliki titik dimana memiliki nilai lendutan yang lebih kecil jika dibandingkan dengan tanah pasir.
MINIMALISASI BIAYA PENYEDIAAN FRAME SCAFFOLDING DENGAN METODE LINEAR PROGRAMMING PADA PROYEK X Verian Fernando Christanto; Iwan B. Santoso
JMTS: Jurnal Mitra Teknik Sipil Volume 3, Nomor 2, Mei 2020
Publisher : Prodi Sarjana Teknik Sipil, FT, Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24912/jmts.v3i2.6979

Abstract

ABSTRACTIn the process of casting, we need a temporary structure that functions as a support or called scaffolding. Scaffolding frame is one type of modern scaffolding that is very commonly used today in high rise building construction. The amount of frame scaffolding needs on a project is not small so the amount of supply of frame scaffolding material can affect cost control on a project. In this study, the linear programming method is used to minimize the cost of providing frame scaffolding material in Project X. The study uses various combinations of frame scaffolding component sizes in casting beams and floor slabs with constraints or problem constraints such as storage of frame scaffolding components, load capacity the maximum that can be held by frame scaffolding, the supply of material quantities, and the casting cycle. By using the linear programming method, a cost savings of 4.3% can be made from the total cost of providing frame scaffolding in Project X if frame scaffolding material is provided with a volume of 3 floors, then 20.23% if frame scaffolding material is provided as much volume 2.5 floor, and 28.7% if frame scaffolding material is provided as much as the minimum floor volume.ABSTRAKDalam proses pengecoran, dibutuhkan struktur sementara yang berfungsi sebagai penyangga atau yang disebut perancah. Saat ini, frame scaffolding merupakan salah satu jenis perancah modern yang sangat umum digunakan pada konstruksi gedung bertingkat. Jumlah kebutuhan frame scaffolding pada suatu proyek tidaklah sedikit sehingga jumlah penyediaan material frame scaffolding ini dapat mempengaruhi pengendalian biaya pada suatu proyek. Pada penelitian ini, digunakan metode linear programming untuk dapat meminimalisasi biaya penyediaan material frame scaffolding pada Proyek X. Penelitian menggunakan berbagai kombinasi ukuran komponen frame scaffolding pada pengecoran balok dan pelat lantai dengan kendala berupa tempat penyimpanan komponen frame scaffolding, kapasitas beban maksimum yang dapat ditahan oleh frame scaffolding, penyediaan jumlah material, dan siklus pengecoran. Dengan menggunakan metode linear programming, dapat dilakukan penghematan biaya sebesar 4,3% dari total biaya penyediaan frame scaffolding pada Proyek X jika material frame scaffolding disediakan sebanyak volume 3 (tiga) lantai, dapat dilakukan penghematan sebesar 20,23% jika material frame scaffolding disediakan sebanyak volume 2,5 (dua setengah lantai), dan sebesar 28,7% jika material frame scaffolding disediakan sebanyak volume lantai yang paling minimal. Selain itu, dengan menggunakan metode linear programming dapat diketahui jumlah material frame scaffolding yang paling baik sesuai dengan kondisi-kondisi di lapangan.
EVALUASI KONDISI 1KM RUAS JALAN M.H. THAMRIN MENGGUNAKAN METODE IRAP UNTUK MENCAPAI STAR RATING 4 Andre Joshua; Ni Luh Putu Shinta Eka Setyarini
JMTS: Jurnal Mitra Teknik Sipil Volume 4, Nomor 1, Februari 2021
Publisher : Prodi Sarjana Teknik Sipil, FT, Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24912/jmts.v0i0.10508

Abstract

The number of road accidents in Indonesia is very high and continues to increase, one of the causes is that there are still many roads that have not applied specific safety principles in their planning designs. To overcome this, it is necessary to implement a strategy to improve road safety using existing methods. In this study, the IRAP method was used to improve the safety of the M.H. Thamrin to achieve a 4 star rating.From the results of the study, it was found that the existing road segment was very good for vehicle occupant because it had reached a 5 star, it was functional for motorcyclist and bicyclist because it had reached 3 stars, but it was still dangerous for pedestrian because only reaches 2 stars. So it is necessary to do a countermeasure to increase the star rating to 4 stars for all road users. So that we get a final star rating of 5 stars on vehicle occupant and motorcyclist, 4 stars for bicyclist and pedestrian. By calculating BCR, the result is more than 1, which means that the treatment option is feasible to be realized.ABSTRAKJumlah kecelakaan di jalan raya di Indonesia sangatlah tinggi dan terus meningkat, salah satu penyebabnya adalah masih banyaknya ruas jalan yang belum menerapkan prinsip-prinsip keselamatan secara khusus dalam desain perencanaannya. Untuk mengatasi hal tersebut, perlu dilakukan strategi peningkatkan keselamatan jalan menggunakan metode yang ada. Pada penelitian ini digunakan metode IRAP untuk meningkatkan keselamatan ruas jalan M.H. Thamrin untuk mencapai star rating 4. Dari hasil penelitian ditemukan bahwa ruas jalan eksisting sudah sangat bagus bagi moda kendaraan berpenumpang karena sudah mencapai bintang 5, sudah laik fungsi bagi moda sepeda motor dan sepeda karena sudah mencapai bintang 3, namun masih berbahaya bagi pejalan kaki karena hanya mencapai bintang 2. Maka  perlu dilakukan countermeasure untuk meningkatkan star rating menjadi bintang 4 pada semua pengguna jalan. Sehingga didapat star rating akhir bintang 5 pada kendaraan berpenumpang dan sepeda motor, bintang 4 pada pesepeda dan pejalan kaki. Melalui perhitungan BCR didapat hasil lebih dari 1, yang berarti opsi penanganan layak untuk di realisasikan.
ANALISIS PENGARUH TEKANAN AIR PORI PADA LERENG YANG DIPERKUAT DENGAN GEOTEKSTIL Satria Seprianto; Andryan Suhendra
JMTS: Jurnal Mitra Teknik Sipil Volume 4, Nomor 1, Februari 2021
Publisher : Prodi Sarjana Teknik Sipil, FT, Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24912/jmts.v0i0.10552

Abstract

ABSTRACTInfrastructure development in Indonesia is growing  rapidly. With the large number of infrastructure developments in various slope topographies, it is one of the locations that is part of this development. The slope area is prone to landslides so that strengthening is necessary. One of the reinforcement that can be done is with geotextiles. In its installation, it is necessary to calculate the correct length and strength of the geotextile for reinforcement. The tensile strength and length of the geotextile as well as the parameters of the embankment affect the safety factor of slope construction. One of the factors being considered is the pore water pressure which reduces the slope strength. So that the results of this study will show how much the influence of pore water pressure on slope reinforcement with geotextiles. After analysis, it was found that the increase of pore water pressure resulted in decreasing of slope safety factor.ABSTRAKPembangunan infarstruktur di Indonesia berkembang sangat pesat. Dengan banyaknya pembangunan imfrastruktur di berbagai topografi lereng menjadi salah satu lokasi yang menjadi bagian dalam pembangunan tersebut. Daerah lereng rawan akan terjadinya longsor sehingga perlu dilakukan perkuatan. Salah perkuatan yang dapat dilakukan adalah dengan geotekstil. Dalam pemasangannya dibutuhkan perhitungan panjang dan kuat geotekstil yang tepat untuk perkuatan. Kuat tarik dan panjang geotekstil serta parameter tanah timbunan mempengaruhi faktor keamanan konstruksi lereng. Salah satu faktor yang dipertimbangkan adalah tekanan air pori yang menjadi penurunan kekuatan lereng. Sehingga hasil studi ini akan menunjukkan seberapa besar pengaruh tekanan air pori pada perkuatan lereng dengang geotekstil. Setelah dilakukannya analisis didapatkan bahwa kenaikan tekanan air pori mengakibatkan penurunan nilai faktor keamanan lereng.
PENDAURAN LAHAN TEMPAT PEMBUANGAN AKHIR (TPA) DENGAN PERBAIKAN TANAH SECARA MEKANIS Indra Bhaswara Purnomosidy; Aniek Prihatiningsih
JMTS: Jurnal Mitra Teknik Sipil Volume 4, Nomor 1, Februari 2021
Publisher : Prodi Sarjana Teknik Sipil, FT, Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24912/jmts.v0i0.10701

Abstract

In recent decades Indonesia has experienced a massive population boom, as such adequate facilities are needed. One thing that can be done is the usage of land for landfills to become the providing land for said infrastructure. This study uses the library research method for its processing or it is also called library research for data comparison. The data sources used are primary and secondary data derived from Google Scholar. The data will be analyzed using descriptive analysis method. The theoretical basis used is the theory of soil improvement methods and the handling of leachate as well as methane gas. The final result of the research is a results comparison of settlement and the bearing capacity of the soil that has undergone improvement and the soil that has not undergone improvement. From the research it can be concluded that the suitable method for landfill improvement is Stone Column. Pertumbuhan penduduk di Indonesia dalam beberapa dekade terakhir meningkat sehingga dibutuhkan fasilitas yang memadai, salah satunya dengan memakaian lahan Tempat Pembuangan Akhir (TPA) menjadi sarana infrastruktur. Penelitian ini menggunakan metode library research yang disebut juga penelitian kepustakaan dengan membandingkan data. Adapun sumber data yang digunakan adalah data-data primer dan sekunder dari Google Scholar. Data akan dianalisa dengan metode deskriptif analisis. Landasan teori digunakan adalah teori Metode Perbaikan Tanah dan penanganan Lindi serta Gas Metana. Hasil akhir dari penelitian adalah perbandingan hasil penurunan dan daya dukung tanah sebelum perbaikan dan setelah perbaikan. Hasil penelitian menunjukkan bahwa metode yang cocok untuk pebaikan tanah TPA mengunakan Stone Column.
ANALISIS PENYEBAB BANJIR KELURAHAN JATAKE - TANGERANG Bryan Jeremia Parulian Harianja; Wati Asriningsih Pranoto
JMTS: Jurnal Mitra Teknik Sipil Volume 4, Nomor 1, Februari 2021
Publisher : Prodi Sarjana Teknik Sipil, FT, Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24912/jmts.v0i0.10533

Abstract

A flood is a natural disaster that occurs due to various factors, and there are lots of losses caused by flooding. In the Jatake-Tangerang district, floods were recorded as high as 30-50 cm during February 2020. This study aims to determine the factors that cause flooding in the area to find solutions. In this study, several things need to be analyzed: rainfall, channel capacity, and existing channel conditions. Rainfall was analyzed using the Chi-Square and Kolmogorov-Smirnov methods to determine the type of distribution to be used. The existing plan's capacity is analyzed using the Manning method to determine the discharge, which will be compared with the discharge due to rainfall that occurs using the rational method. Based on the results of the calculation of 6 of the 73 channels reviewed, it cannot accommodate the discharge due to the rainfall that occurs. It is necessary to plan a new channel to change the channel's dimensions that do not meet. After the analysis was carried out, it could be concluded that the flooding in the Jatake-Tangerang area was caused by a lack of capacity of the existing canal, area contours, garbage, and sediment at the bottom of the channel. ABSTRAKBanjir merupakan salah satu bencana alam yang terjadi karena berbagai faktor dan banyak sekali kerugian yang ditimbulkan akibat banjir. Di wilayah Kelurahan Jatake-Tangerang tercatat mengalami banjir setinggi 30-50 cm selama bulan Februari 2020. Penelitian ini bertujuan untuk mengetahui faktor penyebab terjadinya banjir di daerah tersebut sehingga bisa dicari solusinya. Dalam penelitian ini ada beberapa hal yang perlu dianalisis yaitu curah hujan, kapasitas saluran dan kondisi saluran eksisting. Curah hujan dianalisis dengan metode Chi-Square dan Kolmogorov-Smirnov untuk menentukan jenis distribusi yang akan digunakan. Kapasitas rencana eksisting dianalisis dengan metode Manning untuk mengetahui debitnya yang akan dibandingkan dengan debit akibat curah hujan yang terjadi menggunakan metode rasional. Berdasarkan hasil perhitungan 6 dari 73 saluran yang ditinjau tidak mampu menampung debit akibat curah hujan yang terjadi, maka perlu dilakukan perencanaan saluran baru untuk mengubah dimensi saluran yang tidak memenuhi. Setelah analisis dilakukan dapat disimpulkan bahwa banjir di kawasan Jatake-Tangerang disebabkan oleh kurangnya kapasitas saluran eksisting, kontur wilayah, sampah dan sedimen di dasar saluran.
KARAKTERISTIK MEKANIS CAMPURAN LASTON ATAS DENGAN BUBUK GRAFIT SEBAGAI BAHAN PENGGANTI FILLER Lidwina Sri Ayu DR Sianturi; Anissa Noor Tajudin
JMTS: Jurnal Mitra Teknik Sipil Volume 3, Nomor 3, Agustus 2020
Publisher : Prodi Sarjana Teknik Sipil, FT, Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24912/jmts.v3i3.8317

Abstract

In road pavement modifications, many use materials that have good conductivity to be added to the mixture. One of the conductive materials that can be used for pavement is graphite powder. Graphite is usually found in pencils, raw materials for batteries, etc. The use of graphite powder in the pavement mixture has many benefits such as self-healing, self-monitoring, etc. This research uses graphite powder as filler replacement material. Tests conducted in this study is testing the characteristics of the mixture in accordance with the provisions in force in Indonesia. This study uses graphite powder with variations of 5%, 10%, 15%, and 20% with asphalt content of 5.7%. From the results of testing the characteristics of the mixture continued with the determination of optimum graphite powder content using the narrow range method. Then proceed with the mechanistic response analysis using the KENPAVE program. The results of this study largely meet the requirements of the General Specifications of the Directorate General of Highways 2018 Edition Division 6 and the 2017 Pavement Road Design Manual. The results of this study indicate that the use of graphite powder as a filler substitute can be used in Indonesia. ABSTRAKPada perkerasan jalan modifikasi, banyak menggunakan bahan yang mempunyai konduktivitas yang baik untuk ditambahkan dalam campuran. Salah satu bahan konduktif yang dapat digunakan untuk campuran perkerasan adalah bubuk grafit. Grafit biasanya terdapat pada pensil, bahan baku baterai kering, dll. Penggunaan bubuk grafit dalam perkerasan memiliki banyak manfaat seperti self-healing, self- monitoring, dll. Penelitian ini menggunakan bubuk grafit sebagai bahan pengganti filler. Pengujian yang dilakukan pada penelitian ini adalah pengujian karakteristik campuran yang sesuai dengan ketentuan yang berlaku di Indonesia. Penelitian ini menggunakan bubuk grafit dengan variasi 5%, 10%, 15%, dan 20% dengan kadar aspal 5,7%. Dari hasil pengujian karakteristik campuran dilanjutkan dengan penentuan kadar bubuk grafit optimum dengan metode narrow range. Kemudian dilanjutkan dengan analisis respons mekanistik dengan menggunakan program KENPAVE. Hasil penelitian ini sebagian besar memenuhi persyaratan Spesifikasi Umum Direktorat Jendral Bina Marga Edisi 2018 Divisi 6 dan Manual Desain Perkerasan Jalan 2017. Hasil penelitian ini menunjukkan bahwa penggunaan bubuk grafit sebagai bahan pengganti filler dapat digunakan di Indonesia.
ANALISIS PENGARUH LAYANAN BELANJA ONLINE TERHADAP PERJALANAN BERBASIS RUMAH DAN TEMPAT AKTIVITAS DENGAN METODE SEM James Salim; Leksmono Suryo Putranto
JMTS: Jurnal Mitra Teknik Sipil Volume 3, Nomor 4, November 2020
Publisher : Prodi Sarjana Teknik Sipil, FT, Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24912/jmts.v3i4.8420

Abstract

Transportation is an activity which moving a person or an object from one place to another place. Transportation is done not for desire, it is a derived demand for humans to do the activities for fulfiling their daily needs. Shopping is one of the activities that comply their daily needs. Nowdays, online shopping is a trend. Besides easy to do, online shopping can be done any where and any time because of its online system. Along with the growth of online shopping, a lot of people prefer online shopping rather than traditional shopping to shops, markets, shopping centers and other places. Thisthings could change number of people on doing shopping trips. Thisresearch aimsto find out what factors effects someone’s decision to shop online and find out wether online shopping has a direct effect on shopping trips done by people. Data for this reseach collected by quistionnaire. This research will be done with Structural Equation Modeling (SEM) Method. This research shows that experience and trust are strong factors on someone for making decision to shop online and shows that online shopping did not effect directly to people’s shopping trips.ABSTRAKTransportasi adalah kegiatan perpindahan tempat orang atau suatu benda dari satu tempat ke tempat lainnya. Transportasi dilakukan bukan karena keinginan, melainkan sebuah kebutuhan turunan karena manusia harus melakukan aktivitas untuk memenuhi kebutuhan mereka sehari-hari. Belanja adalah salah satu kegiatan yang dilakukan untuk memenuhi kebutuhan sehari-hari. Belanja online sendiri menjadi sangat trend saat ini. Belanja online selain mudah untuk dilakukan, bisa dilakukan kapan saja, dimana saja karena sistemnya yang bersifat online. Seiring dengan perkembangan belanja online, tidak sedikit orang yang lebih memilih melakukan belanja online dibandingkan melakukan belanja langsung ke toko, pasar, pusat perbelanjaan, dan tempat lainnya. Hal ini bisa jadi mempengaruhi jumlah orang yang melakukan perjalanan belanja. Penelitian ini dilakukan mengetahui faktor apa saja yang berperan dalam keputusan seseorang melakukan belanja online dan mengetahui apakah belanja online berpengaruh secara langsung terhadap perjalanan belanja yang dilakukan masyarakat. Data untuk penelitian didapatkan melalui kuesioner. Penelitian ini akan menggunakan Metode Structural Equation Modeling atau SEM. Dari hasil penelitian didapatkan bahwa pengalaman dan kepercayaan adalah dua faktor yang kuat dalam penentuan keputusan seseorang melakukan belanja online dan belanja online tidak mempengaruhi perjalanan belanja secara langsung
PERBANDINGAN PERHITUNGAN VOLUME PEKERJAAN DAK BETON BERTULANG ANTARA METODE BIM DENGAN KONVENSIONAL Raymond Jonathan; Basuki Anondho
JMTS: Jurnal Mitra Teknik Sipil Volume 4, Nomor 1, Februari 2021
Publisher : Prodi Sarjana Teknik Sipil, FT, Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24912/jmts.v0i0.10473

Abstract

With the development of technologies, some engineers still have a limit about technologies that can help them on their project. One of the technologies in the construction field is Building Information Modelling (BIM). BIM is an innovation from Information Communication Technology (ICT) in the construction world. Applications from BIM used in this research are Cubicost Take-off Architecture & Structure (TAS) for concrete working volume calculation and Cubicost Take-off Reinforcement Bar (TRB) for reinforcement working volume calculation. In this research, the writer aims to compare the calculation of roof plate working volume between the Building Information Modeling method with the conventional method. On concrete working volume calculation with Cubicost TAS, the calculation has the same number as conventional calculation or having 0% differential. The working volume calculation between Cubicost TRB and conventional calculation has an accurate result with a differential of 0.59% on reinforcement. The calculation process with Cubicost, which has an automatic system, is shorter and not taking much time than the conventional one, which has a step-by-step process and formula that the writer should be studied first. ABSTRAKSeiring berkembangnya teknologi, masih terdapat engineer yang dapat dikatakan terbatas dalam pengetahuan teknologi yang dapat membantu pengerjaan proyek mereka. Salah satu teknologi yang ada pada bidang konstruksi merupakan penggunaan Building Information Modeling (BIM). BIM merupakan salah satu inovasi yang termasuk dalam bidang Information Communication Technology (ICT) yang berada pada dunia konstruksi. Aplikasi BIM yang digunakan pada penelitian ini adalah Cubicost Take-off Architecture & Structure (TAS) untuk perhitungan volume kebutuhan beton dan Cubicost Take-off Reinforcement Bar (TRB) untuk perhitungan volume kebutuhan besi. Penelitian ini bertujuan untuk membandingkan perhitungan volume pekerjaan dak beton bertulang antara metode Building Information Modeling dengan konvensional untuk mengetahui manfaat dari penggunaan BIM pada perhitungan volume pekerjaan dak beton bertulang. Pada perhitungan kebutuhan volume beton dengan aplikasi Cubicost TAS, perhitungannya menghasilkan angka yang sama dengan perhitungan konvensional atau perbedaan 0%. Pada perhitungan kebutuhan berat besi untuk pekerjaan pembesian antara aplikasi Cubicost TRB dengan perhitungan konvensional menghasilkan hasil yang akurat dengan perbedaan 0.59%. Proses perhitungan dengan Cubicost yang memiliki sistem otomasi dapat dikatakan lebih singkat dan tidak memakan waktu jika dibandingkan dengan konvensional yang membutuhkan cara pengerjaan satu per satu dan rumus yang perlu dipahami terlebih dahulu.
ANALISIS PENJADWALAN PROYEK GEDUNG BERTINGKAT DENGAN METODE PERT DAN M-PERT MENGGUNAKAN SIMULASI MONTE CARLO Josua Guntur Putra; Jane Sekarsari
JMTS: Jurnal Mitra Teknik Sipil Volume 3, Nomor 3, Agustus 2020
Publisher : Prodi Sarjana Teknik Sipil, FT, Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24912/jmts.v3i3.8395

Abstract

One of the keys to success in construction execution is timeliness. In fact, construction is often late than originally planned. It’s caused by project scheduling uncertainty. Deterministic scheduling methods use data from previous projects to determine work duration. However, not every project has same work duration. The PERT method provides a probabilistic approach that can overcome these uncertainties, but it doesn’t account for the increase in duration due to parallel activities. In 2017, the PERT method was developed into the M-PERT method. The purpose of this study is to compare the mean duration and standard deviation of the overall project between PERT and M-PERT methods and compare them in Monte Carlo simulation. The research method used is to calculate the mean duration of the project with the PERT, M-PERT, and Monte Carlo simulation. The study was applied to a three-story building project. From the results of the study, the standard deviation obtained was 5.079 for the M-PERT method, 8.915 for the PERT method, and 5.25 for the Monte Carlo simulation. These results show the M-PERT method can provide closer results to computer simulation result than the PERT method. Small standard deviation value indicates the M-PERT method gives more accurate results.ABSTRAKSalah satu kunci keberhasilan dalam suatu pelaksanaan konstruksi adalah ketepatan waktu. Kenyataannya, pelaksanaan konstruksi sering mengalami keterlambatan waktu dari yang direncanakan. Hal ini disebabkan oleh ketidakpastian dalam merencanakan penjadwalan proyek. Metode penjadwalan yang bersifat deterministik menggunakan data dari proyek sebelumnya untuk menentukan durasi pekerjaan. Akan tetapi, tidak setiap proyek memiliki durasi pekerjaan yang sama. Metode PERT memberikan pendekatan probabilistik yang dapat mengatasi ketidakpastian tersebut, tetapi metode ini tidak memperhitungkan pertambahan durasi akibat adanya kegiatan yang berbentuk paralel. Pada tahun 2017, metode PERT dikembangkan menjadi metode M-PERT. Tujuan dari penelitian ini adalah membandingkan mean durasi dan standar deviasi proyek secara keseluruhan antara metode PERT dan M-PERT dan membandingkan kedua metode tersebut dalam simulasi Monte Carlo. Metode penelitian yang dilakukan adalah menghitung mean durasi proyek dengan metode PERT, M-PERT, dan simulasi Monte Carlo. Penelitian diterapkan pada proyek gedung bertingkat tiga. Dari hasil penelitian, nilai standar deviasi diperoleh sebesar 5,079 untuk metode M-PERT, 8,915 untuk metode PERT, dan 5,25 untuk simulasi Monte Carlo. Hasil ini menunjukan metode M-PERT dapat memberikan hasil yang lebih mendekati hasil simulasi komputer daripada metode PERT. Nilai standar deviasi yang kecil menunjukan metode M-PERT memberikan hasil yang lebih akurat.