cover
Contact Name
Aris Fiatno
Contact Email
abi.fiat@gmail.com
Phone
+6282113270340
Journal Mail Official
teknikindustri@universitaspahlawan.ac.id
Editorial Address
Jl. Tuanku Tambusai No. 23 Bangkinang Kampar, Riau ยป Tel / fax : (0762) 216 77 / (0762) 216 77
Location
Kab. kampar,
Riau
INDONESIA
Jurnal Teknik Industri Terintegrasi (JUTIN)
ISSN : 26208962     EISSN : 26208962     DOI : 10.31004jutin
Jurnal Teknik Industri Terintegrasi merupakan jurnal yang dikelola oleh Program Studi Teknik Industri Fakultas Sains dan Teknologi Universitas Pahlawan Tuanku Tambusai yang menjebatani para peneliti untuk mempublikasikan hasil penelitian di bidang ilmu teknik dan teknik industri mencakup proses manufaktur, kegagalan dan rekayasa material, perawatan berbasis keandalan, keselamatan kerja, perancangan sistem kerja dan ergonomi, pengendalian dan penjaminan mutu, tata letak fasilitas, penelitian operasional, kewirausahaan dan pengembangan bisnis
Arjuna Subject : -
Articles 1,048 Documents
PENERAPAN METODE RELIABILITY CENTERED MAINTENANCE ( RCM ) PADA MESIN CAKE BREAKER CONVEYOR DI PABRIK KELAPA SAWIT ( PKS ) Sunaryo Sunaryo; Legisnal Hakim; Ari Andriyas Puji; Denur Denur
Jurnal Teknik Industri Terintegrasi Vol. 4 No. 2 (2021): November 2021
Publisher : Research Center University of Pahlawan Tuanku Tambusai

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/jutin.v4i2.3220

Abstract

Oil palm plantations and their processing units are expected to grow rapidly, advances in science and technology are very fast along with sophisticated equipment created to simplify and speed up a production process in a palm oil factory, one of which is the Cake Breaker Conveyor (CBC) which functions to break/separate oil palm kernels. core of the shell in oil palm kernel processing. Problems that often occur in the process of separating pulp with palm kernel are in the transfer Cake Breaker Conveyor (CBC). This study tries to propose a machine maintenance system using the application of the RCM (Realibility Centered Maintenance) method on the CBC Cake Breaker Conveyor machine, where the RCM (Realibility Centered Maintenance) method is an identification technique with the intention of saving costs and maintenance to minimize the risk and impact of failure. in facilities and equipment utilities. From the test results the Mean Time to Failure (MTTF) value of the CBC engine clutch (Cake Breaker Conveyor) is 1,803 Hours. While the calculation results of the Mean Time to Repair (MTTR) value of the CBC engine clutch (Cake Breaker Conveyor) is 4:00 Hours Types of Preventive Maintenance and Time Based Maintenance For the optimal maintenance interval for the CBC (Cake Breaker Conveyor) engine clutch is 19 days. Keywords : Cake Breaker Conveyor, Realibility Centered Maintenance, Palm Oil Mill
STRATEGI PEMASARAN DENGAN MENGGUNAKAN METODE SWOT DI UKM XYZ Muhammad Nur
Jurnal Teknik Industri Terintegrasi Vol. 4 No. 2 (2021): November 2021
Publisher : Research Center University of Pahlawan Tuanku Tambusai

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/jutin.v4i2.3242

Abstract

UKM XYZ is an industry engaged in the food sector. The problems that occur in UKM XYZ are the promotion strategy implemented is not enough to increase sales, there are competitors with similar businesses. From the problems that occur have an impact on sales and decreased revenue. The purpose of this research is to identify internal and external factors that influence and form elements of marketing strategy, analyze strengths and weaknesses as well as opportunities and threats to see the current position.. The method used in this research is the SWOT method. The SWOT method is a method used to determine the strategy to be pursued based on the strengths and weaknesses as well as the opportunities and threats that exist in UKM XYZ. Through analysis of the strengths and weaknesses as well as opportunities and threats to UKM XYZ with the calculation of EFE and IFE matrices, the results of the current position of UKM are in quadrant II, where the right strategy to be implemented is the strategy of growth and development.
RANCANG BANGUN BELT CONVEYOR SEBAGAI ALAT MATERIAL HANDLING PENGANGKUT PASIR PADA PEMBUATAN BATA RINGAN Aris Fiatno
Jurnal Teknik Industri Terintegrasi Vol. 4 No. 2 (2021): November 2021
Publisher : Research Center University of Pahlawan Tuanku Tambusai

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/jutin.v4i2.3502

Abstract

Abstract Conveyor in general is a tool that functions to move objects or loads from one place to another. In general, a belt conveyor system consists of a belt (belt), a front pulley (head pulley) equipped with a drive unit consisting of an electric motor and gearbox, a rear pulley (tail pulley), an upper idler (carry idler), and a lower idler. (return idlers). The method used in this research is the method of literature study and field observation. This research will also plan a design that is adapted to the conditions of the layout of the facility and also design according to the height of the mixer machine. Stages of data processing, the data processing process is carried out by finding the carrying capacity of the data processing process is carried out by calculating the speed of each series of conveyor belts using a time measuring device. the results of the design and manufacture of the belt conveyor that have been carried out, that the belt conveyor has a length of 4.5 m, with a frame width of 50, a height of 210 cm, using an electric motor with a power of hp. The conveyor belt that is made is capable of carrying a load of 4.3 tons per hour. Keywords: : Belt conveyor, material handling, hebel
ANALISIS SRATEGI PEMASARAN GUNA PENGEMBANGAN USAHA UMKM KERUPUK MERAH JATI DENGAN MENGGUNAKAN SWOT Deri Kurniadi; Aan Rahmadi
Jurnal Teknik Industri Terintegrasi Vol. 4 No. 2 (2021): November 2021
Publisher : Research Center University of Pahlawan Tuanku Tambusai

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/jutin.v4i2.3604

Abstract

AbstractRed Jati crackers UMKM as a producer that produces red crackers. Reliable strength. Red Jati crackers have an advantage in terms of price, but need improvements in terms of packaging made as attractive as possible so that consumers are more interested and add to the selling value. The weaknesses that are owned by Red Jati Crackers are: first, they do not have a typical company so that the company will experience a financial crisis (decline) if the company is affected by the dropping or falling world economy and secondly does not use promotional or advertising services, both visual and non-visual. The biggest opportunity that Red Jati Crackers can get is to dominate the monopolistic market. The biggest threat faced by Red Jati Crackers is the purchasing power of consumers. SWOT analysis of IFAS (Intermal Factors Analysis Summary) material factors Total score of 2.32 Strength (Strength) while Weakness (Weakness) total score of 0.76. The total score is all 3.08. EFAS External Factors (External Factors Analysis Summary) Opportunities total score of 2.14 while Threat (Threat) total score of 0.45. The total score is 2.59 in all. Red Jati crackers are in a development position (Growth) with the SO (S) Strategy to increase Strength (O) to achieve the goal. Keywords: SWOT, Strengths, Weaknesses, Opportunities, Threats, Marketing Strategy, SWOT Matrik.
Rancang Bangun Alat Pencacah Sampah Organik Pekan Ternak Sapi Emon Azriadi; Muhammad Tarmizi; Aris Fiatno; Yesi yusmita; Resy Kumala Sari
Jurnal Teknik Industri Terintegrasi Vol. 3 No. 2 (2020): November
Publisher : Research Center University of Pahlawan Tuanku Tambusai

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/jutin.v3i2.3688

Abstract

Abstract Garbage is something that disturbs and affects the community environment. Organic waste comes from living things, both humans, animals, and plants, so that it can be used for animal feed which is processed by chopping. As for the results of field observations at the Bangkinang Kota market, it can be seen that organic waste types of cabbage and mustard are commonly found in the Bangkinang Kota market, organic waste such as carrots, tomatoes, chilies, potatoes and kale are found in many trash cans but the amount is less, this type of waste dry. For the Bangkinang City area, waste transportation is carried out 2 (two) times a day, namely in the morning and evening. The most waste generated is on Wednesdays and Sundays, because those days are market days in Bangkinang Kota. The waste generated reaches 1-2 tons per day. The organic waste chopper generally consists of a frame, top casing, bottom casing, inlet, outlet, axle, bearing, and blade. The manufacture of this tool at the Laboratory of Industrial Engineering, Universitas Pahlawan Tuanku Tambusai. The design and manufacture of organic cattle feed chopper has a size of 38 cm, width 51 cm and height 120 cm, using a 7 hp/5600 rpm diesel engine with a weight of 72 kg. Based on the test results, it can be concluded that organic mixed vegetable waste weighing 2 kg only takes 22 seconds faster, while cabbage weighing 2 kg takes 37 seconds and mustard greens weighing 2 kg takes 29 seconds. The amount of organic waste that is chopped as much as 6 kg only takes 88 seconds. Keywords: Design, chopper, organic waste.
PERANCANGAN MESIN PENGOLAH LIMBAH LIDI KELAPA SAWIT MENGGUNAKAN COMPUTER AIDED DESIGN (CAD) Fadli Arsi; Fiky Two Nando
Jurnal Teknik Industri Terintegrasi Vol. 4 No. 2 (2021): November 2021
Publisher : Research Center University of Pahlawan Tuanku Tambusai

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/jutin.v4i2.3701

Abstract

Abstract Riau is one of the areas with the largest oil palm plantation area in Indonesia. In general, oil palm has three types of waste, including: solid waste, liquid waste, and gas waste. Solid waste consists of empty bunches, midribs, stems and mesocarp fibers. The frond waste is generated when trimming the midrib at the time of harvesting oil palm fruit bunches. The oil palm midrib consists of rachis (leaves), pinnacs (leaves), and spines (sticks). The number of leaflets on one midrib ranges from 250-400 leaflets located on the left and right of the midrib. Each leaflet consists of a stick and two leaves. The process of separating sticks is still done manually, so it takes a long time to separate them. So in this study, we designed a palm stick machine using CAD. Designing with CAD provides many advantages including making it easier for designers to design, reducing time, and reducing costs during design. There are three design pictures of palm oil stick waste processing machines. Based on economic calculations, tools and materials needed and processing time, design drawing C is the choice. Next, build a waste treatment machine with reference to the selected design Keywords: stick waste, CAD, Palm Oil
Perancangan Dan Pengukuran Kinerja Sumber Daya Manusia Menggunakan Metode Human Resources Scorecard dan Analytical Hierarchy Process (AHP) (Studi Kasus : PT. Rajawali Malik Jaya Pekanbaru) Ari Andriyas Puji; Faradila Ananda Yul; Nova Meirizha; Denny Astrie Anggraini; Satriadi Satriadi
Jurnal Teknik Industri Terintegrasi Vol. 5 No. 1 (2022): April 2022
Publisher : Research Center University of Pahlawan Tuanku Tambusai

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/jutin.v5i1.4668

Abstract

Performance appraisal is an important process in human resources, because the results of the performance appraisal will measure the competence, work behavior and work results of employees within a certain period of time as a basis for consideration in considering decisions in the field of human resources. Employee performance at PT. Rajawali Malik Jaya to complete 1 document takes a long time. From the problems found, the occurrence of long data processing makes work pile up so that employees are tired of processing data all at once. Therefore, to overcome and find out these problems, it is necessary to use the Human Resources Scorecard and Analytical Hierarchy Process methods to measure employee performance. Human Resources Scorecard analysis was obtained using 4 perspectives, namely financial perspective, consumer perspective, internal business perspective and growth and learning perspective, while the AHP analysis consisted of 4 criteria and 4 sub criteria. From the weighting results obtained, it is known that the smallest weight on the financial perspective is 0.13, the consumer perspective is 0.22, the growth and learning perspective is 0.20 and the internal business perspective is the largest weighted value, which is 0.40.
Studi Kelayakan Usaha Grosir Ayam Ras pada Usaha Bapak Bronza Pekanbaru) Misral Misral; Hendri Ali Ardi; Dedi Dermawan; Denur Denur
Jurnal Teknik Industri Terintegrasi Vol. 5 No. 1 (2022): April 2022
Publisher : Research Center University of Pahlawan Tuanku Tambusai

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/jutin.v5i1.4677

Abstract

Chicken is a basic need of the people in everyday life. as a basic need, chicken hasa high amount of demand. Therefore, it becomes a high business opportu nity. From the existing broiler chicken business owned by Mr. Brozan, the researcher analyzed the feasibility study of the business. The feasibility study carried out is the feasibility of the market aspect and the feasibility of the financial aspect. The results of the analysis show that Mr. Brozan's business is declared feasible based on a feasibility study, and from the financial aspect, the sensitivity analysis shows that if there is a price increase or stock restrictions from livestock, the business is still declared financially feasible.
Pembuatan Belt Conveyor dan Perancangan Tata letak Fasillitas menggunakan Metode Activity Relationship Chart dan Promodel pada Produksi Bata Ringan yusnira yusnira; Aris Fiatno; Rahmat Hidayat
Jurnal Teknik Industri Terintegrasi (JUTIN) Vol. 5 No. 1 (2022): April 2022
Publisher : LPPM Universitas Pahlawan Tuanku Tambusai

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Pembuatan belt conveyor dan perancangan tata letak fasilitas. Conveyor secara umum adalah suatu alat yang berfungsi memindahkan benda atau beban dari suatu tempat ketempat yang lain, sedangkan tata letak fasilitas didefenisikan sebagai tata cara pengaturan fasilitas-fasilitas pabrik guna menunjang kelancaran proses produksi. Pada tugas akhir ini belt conveyor dengan panjang rangka 4,5 meter dan lebar rangka 0,5 meter. Panjang conveyor 4 meter dan lebar bel 0,3 meter. Metode yang digunakan untuk perancangan tata letak fasilitas adalah activity relationship chart dan promodel. Tahapan dalam pembuatan belt conveyor dan perancangan tata letak ini di desain komponen dengan menggunakan aplikasi autoCAD 2014 dan aplikasi promodel. Perhitungan luas area yang diperlukan dalam perancangan tata letak fasilitas adalah 69,4 meter. Hasil simulasi didapatkan waktu 120 menit, dari gudang bahan baku sampai gudang barang jadi persekali produksi bata ringan.
Design and Build Transport Manual Material Handling (MMH) Trolley Based on Ergonomic Resy Kumala Sari; Yesi Yusmita
Jurnal Teknik Industri Terintegrasi (JUTIN) Vol. 5 No. 1 (2022): April 2022
Publisher : LPPM Universitas Pahlawan Tuanku Tambusai

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

This study aims to design and build a Transport Manual Material Handling (MMH) Trolley based on ergonomics by recruiting 100 students (45 female participants and 55 male participants) randomly from the Faculty of Engineering, Universitas Pahlawan Tuanku Tambusai. Anthropometric data measured in the form of Standing Elbow Height (TSB), Sitting Hand Reach (JTD), Hand Width to Metacarpal (LTM), Shoulder Width (LB), the data in the normality test can be seen that the chi-square count < chi table, the data above is normally distributed, the uniformity test states that from the 4 anthropometric data are uniform, and finally the adequacy test states that the data is normal (N'<N). The results of the test and the calculation of percentiles were obtained in the "Trolley design based on anthropometry data in the form of TSB (P90: 115.08 cm), JTD (P50: 69.85 cm), LB, (P95: 10.32 cm), and LB (P95: 49.93 cm). ). As for the test results, the trolley product can carry a load of 50 kg - 200 kg which has been tested in 3 stages in the form of a medium load (50 kg), medium load (100 kg), and heavy load (150-200 kg). Therefore, for the design of this trolley, an ergonomic size has been determined so that it can be used practically, safely, and comfortably and in addition to transporting materials it can be used as a means of transportation.

Page 7 of 105 | Total Record : 1048