Akselerasi Jurnal Ilmiah Teknik Sipil
Published by Universitas Siliwangi
ISSN : -     EISSN : 27157296     DOI : -
Core Subject : Engineering,
Ilmu teknik sipil yang meliputi: bidang ilmu struktur, manajemen transportasi (pelabuhan, jalan, dan jembatan), pengembangan sumber daya air (PSDA), geoteknik, dan manajemen konstruksi/manajemen proyek.
Articles 8 Documents
Search results for , issue "Vol 5, No 2 (2024): Januari" : 8 Documents clear
Kajian Redesign Struktur Gedung 5 Lantai Balai Pengobatan Universitas Siliwangi Al Huseiny, Mohammad Syarif; Nursani, Rosi
Akselerasi : Jurnal Ilmiah Teknik Sipil Vol 5, No 2 (2024): Januari
Publisher : Universitas Siliwangi

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.37058/aks.v5i2.10155

Abstract

 The Siliwangi University Medical Center is a simple building consisting of 1 floor which requires redesign to improve the quality of health services at Siliwangi University. High-rise buildings require precise and thorough structural calculations. The building must be able to withstand axial forces and lateral loads including earthquake loads. The results of the calculation of structural strength are made as optimal as possible so that it becomes a strong and stable building that can provide security and comfort for its users. Based on these problems, it is necessary to conduct research studies on the structure of the Siliwangi University Medical Center building. The dimensions of the structural components are determined by preliminary design first, then the building structure is analyzed using the SAP 2000 v.22.0.0 program. The next step is design control to determine whether the structural design meets the planning requirements and safety factor regulations or not. The results showed that the reinforced concrete structure in the Siliwangi University Medical Center building had strength control which qualify to the requirements, so the Siliwangi University Medical Center Building could be a safe and comfortable infrastructure that the health service process could run smoothly.
UPAYA MITIGASI KELONGSORAN LERENG PADA JALUR PIPA PENSTOCK EKSISTING Desilia, Asrinia; R.P.Nababan, Fritz; Gusnadi, Zakwan
Akselerasi : Jurnal Ilmiah Teknik Sipil Vol 5, No 2 (2024): Januari
Publisher : Universitas Siliwangi

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.37058/aks.v5i2.10213

Abstract

Kondisi kestabilan lereng sangat tergantung dari berbagai faktor yang mempengaruhi, salah satunya adalah kondisi saturasi tanah. Tanah eksisting yang mengalami saturasi akibat intensitas hujan tinggi menyebabkan tambahan beban pada material tanah dan mereduksi kekuatan tanah. Dalam jangka waktu tertentu hal tersebut dapat menjadi penyebab pergerakan tanah dan kelongsoran lereng. Pergerakan tanah yang terjadi berdekatan dengan struktur eksisting tentu saja akan turut berpengaruh terhadap kestabilan struktur tersebut. Penelitian ini mengkaji tentang upaya mitigasi struktur pipa penstock yang mengalami kerusakan akibat pergerakan tanah yang terjadi. Upaya mitigasi yang dilakukan adalah dengan pemasangan soldier pile dan relokasi abutment fondasi pipa penstock. Pemasangan soldier pile diameter 1,2 m panjang 20 m dan jarak 2,4 m dimaksudkan untuk memotong bidang pergerakan lereng agar dapat menghentikan pergerakan lanjutan. Sedangkan relokasi abutment pipa penstock bertujuan untuk menempatkan abutment pada lokasi yang tidak terjadi pergerakan tanah. Proses analisis upaya mitigasi dilakukan dengan metode elemen hingga menggunakan bantuan program Plaxis 2D dan Ensoft Group. Hasil analisis menunjukan faktor kemamanan stabilitas meningkat dari semula 1,3 menjadi 1,5. Respon gaya yang terjadi pada soldier pile yaitu bending moment sebesar 239,9 kNm dan total displacement 4,1 cm. Defleksi lateral tanah terhadap pipa sebesar 0,8 cm, masih berada di bawah batas izin 2,0 cm untuk kondisi tegangan izin.
ANALISA MOTIVASI PEKERJA KONSTRUKSI DI KOTA TASIKMALAYA hendardi, agi rivi; Nurmayadi, Dicky
Akselerasi : Jurnal Ilmiah Teknik Sipil Vol 5, No 2 (2024): Januari
Publisher : Universitas Siliwangi

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.37058/aks.v5i2.10137

Abstract

Studi tentang motivasi pekerja konstruksi terbatas pada pengetahuan yang relatif kecil. Meskipun ada banyak penelitian yang tersedia mengenai motivasi dan produktivitas, beberapa peneliti telah memberikan analisis komprehensif tentang motivasi pekerja konstruksi. Penelitian tersebut menyatakan bahwa produktivitas dalam konstruksi belum membaik dibandingkan dengan sektor industri lainnya seperti manufaktur. Tren ini telah digemakan dalam publikasi selama lima dekade terakhir, dan menyarankan bahwa motivasi adalah salah satu faktor kunci yang berpengaruh terhadap kinerja kru kontruksi [1]. Dalam penelitian ini akan dilakukan studi dan Analisa secara komprehensif mengenai motivasi para pekerja di sector konstruksi, khususnya pada level proyek, yang ada di Kota Tasikmalaya. Pengambilan data sampel dilakukan dengan cara interview langsung menemui para pekerja konstruksi di proyeknya masing-masing. Dalam melakukan interview akan digunakan instrument berupa kuesioner yang disusun berdasarkan kajian teori mengenai motivasi pekerja yang nantinya kuesioner ini akan menjadi suatu alat penilaian dari objek penelitian tersebut. Data tersebut kemudian dianalisis dan diuji validasi serta dikaji mengenai hubungan kecenderungan motivasi pekerja dengan jabatan di proyek dengan uji statistik. Penelitian ini diharapkan akan menambah informasi dalam mengelola sumber daya manusia pada kegiatan konstruksi di tingkat proyek  baik bagi setiap PM sendiri maupun bagi intansi perusahaan kontraktor yang ada di Kota Tasikmalaya.
PREDIKSI DEBIT ANDALAN DAS CILOSEH MENGGUNAKAN FJ MOCK DAN BANGKITAN DATA DEBIT THOMAS FIERING UNTUK ANALISA KETERSEDIAAN AIR DEARAH IRIGASI CIMULU Irawan, Pengki; Setiawan, Junaedi; Alfaridzi, M. Wildan; Awaliyah, Shinta; Hidayat, Asep Kurnia; Hendra, Hendra
Akselerasi : Jurnal Ilmiah Teknik Sipil Vol 5, No 2 (2024): Januari
Publisher : Universitas Siliwangi

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.37058/aks.v5i2.10234

Abstract

Ketersediaan air menjadi isu krusial di Indonesia, terutama di wilayah dua musim. Residu dari aktivitas manusia mengancam ketersediaan air sungai, serta diperparah oleh perubahan iklim global yang berdampak pada suhu, curah hujan, dan debit sungai. Fokus penelitian adalah DAS Ciloseh, sumber air utama untuk DI Cimulu. Metode FJ Mock digunakan untuk memodelkan debit andalan (80%) DAS, melibatkan metode Penman Modifikasi, Polygon Thiessen, dan Thomas Fiering. Hasil analisis menunjukkan bahwa tutupan lahan, khususnya sawah, memengaruhi debit andalan. Luas DAS, jenis tanah, dan tutupan lahan menjadi parameter penting. Debit andalan DAS Ciloseh berkisar 5,30 m3/s hingga 14,70 m3/s untuk 100 tahun ke depan. Pembangkitan data menggunakan metode Weibull menunjukkan fluktuasi debit mengikuti pola historis. Penelitian ini memberikan kontribusi penting untuk memahami ketersediaan air di DAS Ciloseh, yang memiliki implikasi besar untuk pengelolaan sumber daya air di masa depan.
Analisis Tingkat Kepuasan Penumpang Bus Efisiensi Terhadap Kualitas Dan Kenyamanan Rute Purwokerto-Yogyakarta Riyanto, Hanief Attalah Putra; Juanita, Juanita; Sari, Cremona Ayu Novita
Akselerasi : Jurnal Ilmiah Teknik Sipil Vol 5, No 2 (2024): Januari
Publisher : Universitas Siliwangi

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.37058/aks.v5i2.10044

Abstract

AbstractIn general, one of the means of transportation that is still widely used by Indonesian people is the bus. The city of Purwokerto is the capital of Banyumas Regency, Central Java, which has a total area of 39.58 km². PO Efisiensi is a bus company originating from Kebumen, Central Java and is one of the intercity buses that is in great demand by the people of Purwokerto. Therefore, the author wants to analyze the level of service quality for passengers who use efficiency bus services in Purwokerto and what factors need to be improved to make passengers more comfortable. The method used in this research is Importance Performance Analysis (IPA) and Customer Satisfaction Index (CSI) with data collection using the questionnaire method. This was carried out on 200 respondents and 30 questionnaires were tested on efficiency bus passengers, where the assessment used a Likert scale. The results of the analysis using the Importance Performance Analysis (IPA) method show that service performance on efficiency buses is in the Very Good/Very Satisfying category with a percentage of 98.94%. It can be said that the level of conformity to consumer expectations still needs to be improved. There are 3 attributes whose performance level of importance is still lacking, including Cleanliness. on the bus, the condition of the seat being comfortable to sit on, suitability of the route on the predetermined route. Public Transport Service Standards No.40 of 2015, 2020. The research results from the Customer Satisfaction Index (CSI) of 86.080% show that passenger satisfaction on the Purwokerto-Yogyakarta efficiency bus route is in the Very Good/Very Satisfying category regarding service performance on the Purwokerto-Yogyakarta efficiency bus route.Keywords: Importance Performance Analysis, Customer Satisfaction Index, Bus Passenger Expectations for Efficiency
STUDI PERBANDINGAN METODE PEMBEBANAN STRUKTUR BANGUNAN ATAS JEMBATAN BETON BERTULANG Yunita Mauliana; Frans Wahyu Saputra
Akselerasi : Jurnal Ilmiah Teknik Sipil Vol 5, No 2 (2024): Januari
Publisher : Universitas Siliwangi

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.37058/aks.v5i2.10189

Abstract

Jembatan Way Paku II di Kabupaten Tanggamus telah selesai dibangun pada tahun 2021 dengan menggunakan metode pembebanan RSNI T-02-2005. Pada penelitian ini, akan direncanakan ulang pembebanan struktur beton bertulang dengan menggunakan metode pembebanan SNI 1725 2016. Analisis perhitungan dibatasi pada struktur bangunan atas jembatan, Dari hasil analisis terdapat perbandingan yang cukup siginifikan yaitu pada metode SNI 1725 2016 memperhitungkan pengaruh angin serta gesekan pada perhitungan momen dan gaya geser maksimum. Untuk momen maksimum, pengaruh angin sebesar 616,9 kNm serta gesekan pada perletakan sebesar 171,27 kNm, sementara untuk gaya geser maksimum terdapat pengaruh angin sebesar 154,23 kN dan gesekan pada perletakan sebesar 21,41 kN. Perencanaan tulangan pada girder utama didapatkan 23 D 25 (tulangan longitudinal momen positif) 6 D 25 (tulangan longitudinal momen negatif) dan Ø 10 – 130 (tulangan geser). Perencanaan diagfragma 3 D 16 (tulangan longitudinal momen positif) 3 D 16 (tulangan longitudinal momen negatif) dan Ø 10 – 120 (tulangan geser). Perencanaan tulangan pada pelat lantai struktur atas jembatan didapatkan D16 – 120 (tulangan pokok) D 13 – 170 (tulangan bagi). Perencanaan tiang sandaran didapatkan tulangan 2 Ø 12 (tulangan lentur) Ø 10 – 140 (tulangan geser).
BANDINGAN ANALISIS COST BUDGET PLAN MENGGUNAKAN METODE KONVENSIONAL DAN METODE BUILDING INFORMATION MODELING (BIM) 5D DALAM PEKERJAAN STRUKTURAL (Studi Kasus: Proyek Pembangunan Gedung Laboratorium Terpadu Politeknik Negeri Indramayu) Nur Arifin, Muhammad Lutfi; Hendrawangsa, Permana; Sari, Novia Komala
Akselerasi : Jurnal Ilmiah Teknik Sipil Vol 5, No 2 (2024): Januari
Publisher : Universitas Siliwangi

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.37058/aks.v5i2.10160

Abstract

Metode perhitungan konvensional pada umumnya masih menggunakan perhitungan volume manual. Metode tersebut kurang efektif dan memakan waktu cuku lama. Implementasi Building Information Modeling (BIM)  dalam industri konstruksi dapat meningkatkan efisiensi perencanaan, pelaksanaan, dan pengendalian proyek, terutama dalam penjadwalan dan estimasi biaya. BIM memberikan solusi untuk mengelola proyek yang dinamis, penuh risiko, dan tidak pasti, serta mengurangi terjadinya CCO. Pada proyek pembangunan Gedung Laboratorium Terpadu Tahap II Politeknik Negeri Indramayu ini dilaksanakan pada tanggal 18 Februari 2021 sampai 30 Juni 2021 mengalami CCO dikarenakan keterlambatan pada minggu ke-11. Proyek tersebut direncanakan dengan menggunakan metode konvensional sehingga terjadi keterlambatan, dikarenakan ketidakakuratan dalam perencaanan dan perancangan. Penelitian ini bertujuan untuk menganalisis perencanaan anggaran biaya dengan menggunakan metode konvensional dan membandingkannya dengan penerapan BIM 5D dalam pembangunan Gedung Laboratorium Terpadu di Politeknik Negeri Indramayu, khususnya dalam pekerjaan struktural. Perangkat lunak dalam penerapan BIM ialah Cubicost TAS digunakan untuk perhitungan jumlah pekerjaan struktural, sedangkan Cubicost TRB digunakan untuk perhitungan kebutuhan tulangan.  Analisis data ini mengonversi gambar 2D menjadi model 3D. Selanjutnya, analisis data melibatkan penjadwalan dan estimasi biaya berdasarkan hasil perhitungan jumlah pekerjaan model 3D. Hasil dari pemodelan BIM untuk penjadwalan menggunakan software Microsoft Project menunjukan bahwa proyek dapat selesai dalam 17 minggu atau 116 hari dan perhitungan jumlah pekerjaan menunjukkan estimasi biaya Rp9.681.945.607,50 untuk pekerjaan struktural. Perbedaan dalam estimasi biaya total sekitar 5%, dengan selisih sebesar Rp418.415.427,56. Kata kunci: Building Information Modeling, Estimasi Biaya, Volume.
Analisis Sistem Drainase RSUD Dr. Soekardjo Kota Tasikmalaya Tantoh, Michael; Ramadan, Anri Noor Annisa; Hendardi, Agi Rivi
Akselerasi : Jurnal Ilmiah Teknik Sipil Vol 5, No 2 (2024): Januari
Publisher : Universitas Siliwangi

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.37058/aks.v5i2.10205

Abstract

In 2022, Dr. Soekardjo Regional General Hospital in Tasikmalaya faced a serious challenge with its drainage system. Due to heavy rain, a 50 cm water puddle on the first floor posed a threat to patient safety and disrupted hospital operations. This research aimed to evaluate the capacity and effectiveness of the drainage system, ensuring its ability to handle water flow and prevent flooding and flood risks during rainfall. The research methods included rainfall analysis, flow modeling, and existing flow analysis involving 47 drainage channels of various shapes in Dr. Soekardjo Regional General Hospital. The identification results showed an average channel length of 27.41 m, width of 0.5 m, and height of 0.24 m. The flow rate of Dr. Soekardjo Regional General Hospital was 0.261 m3/s, the Citanduy River tributary flow was 0.093 m3/s, and the total flow was 0.354 m3/s. The analysis indicated that the existing channels were unable to accommodate both flow rates, resulting in backwater. To address the drainage issue, improvements to the channels, addition of infiltration wells, and creation of biopore infiltration holes are planned. Additionally, an aquifer will be established as an additional water reservoir, and the Citanduy River channel will be widened to optimize flow. It is hoped that these measures will reduce the risk of waterlogging and flooding, ensuring patient safety during the rainy season.