cover
Contact Name
Vina Maria Ompusunggu
Contact Email
vinaompusunggu@gmail.com
Phone
+6285276850885
Journal Mail Official
juitech@universitasquality.ac.id
Editorial Address
Jl. Ngumban Surbakti No 18 Medan
Location
Kota medan,
Sumatera utara
INDONESIA
JUITECH: Jurnal Ilmiah Fakultas Teknik Universitas Quality
Published by Universitas Quality
ISSN : 25804057     EISSN : 25977261     DOI : http://dx.doi.org/10.36764/ju.v6i1
Core Subject : Engineering,
JUITECH (Scientific Journal of the Faculty of Engineering Quality University) is a peer-reviewed multidisciplinary journal committed to the advancement of scientific knowledge and research findings from several branches of Engineering and Mathematics and Natural Sciences. This journal publishes the latest research results from lecturers and researchers which are widely distributed (Online), including: expertise in energy conversion, construction machinery, manufacturing, and materials, telecommunication, and information engineering, control, and instrumentation, expertise in the field of structural, geotechnical, transportation, and hydro, systems of company management, ergonomic and work systems, and manufacturing systems.
Articles 160 Documents
Variasi Tiga Metode Pendeteksian Kerusakan Sistem Electronic Fuel Injection pada Sepeda Motor Anugrah, Rinasa Agistya
JUITECH: Jurnal Ilmiah Fakultas Teknik Universitas Quality Vol 8, No 1 (2024)
Publisher : Universitas Quality

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.36764/ju.v8i1.1346

Abstract

Perkembangan pendeteksian kerusakan pada sistem Electronic Fuel Injection (EFI) sudah sangat maju dengan metode yang serba praktis dan mudah.  Namun, masih banyak bengkel yang belum bisa memperbaiki sepeda motor dengan teknologi EFI karena membutuhkan scanner khusus dari pabrikan untuk mendeteksi kerusakan-kerusakan dalam sistem kontrol elektronik baik itu sensor, ECU (Electronic Control Unit), atau aktuator. Hal ini masih menjadi kendala utama karena tidak setiap bengkel non-resmi memiliki alat tersebut karena harganya mahal dan setiap tipe atau merk sepeda motor memiliki scanner (EFI Diagnostic Tool) yang berbeda-beda sehingga bengkel harus menyediakan berbagai macam scanner untuk mengakomodir semua tipe dan merk sepeda motor. Padahal ada metode lain yang dapat digunakan selain dengan scanner tersebut. Metode pemeriksaan kerusakan pada sistem EFI sepeda motor bisa dilakukan dengan tiga metode yaitu metode MIL (Malfunction Indicator Lamp), EFI Diagnostic Tool, dan Manual (dengan multitester). Dengan memilih salah satu diantara tiga metode tersebut dapat untuk mendeteksi kerusakan yang ada pada sistem EFI. Metode yang tidak membutuhkan scanner dapat dilakukan adalah metode MIL dan Manual. Metode MIL dapat dilakukan dengan melihat lampu MIL yang berkedip dan memperhatikan kode kedipan yang muncul. Dengan mengetahui kode kedipan maka akan diketahui pula kerusakan yang terjadi melalui buku manual pedoman reparasi (terdapat tabel kode kedipan dan analisis kerusakan yang terjadi). Metode Manual atau dengan multitester dapat juga dilakukan pemeriksaan satu-persatu pada setiap sensor dan aktuator yang ada pada sistem EFI, dapat diketahui hasilnya apakah masih dalam batas rentang spesifikasi atau tidak dengan membandingkan dengan standar yang ada dalam buku manual pedoman reparasi.
ANALISA PERBANDINGAN REALISASI BIAYA ANTARA PERENCANAAN DAN PELAKSANAAN PEKERJAAN STRUKTUR PONDASI BOR PILE GEDUNG INKULTURATIF GBKP BUKIT KEC. BERASTAGI Darnianti, Darnianti; Christy, Julieta; Laia, Fiber Jean Smara; Vernando W, Jeremi Liliteo
JUITECH: Jurnal Ilmiah Fakultas Teknik Universitas Quality Vol 8, No 1 (2024)
Publisher : Universitas Quality

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.36764/ju.v8i1.1273

Abstract

The location for the construction of the GBKP Bukit Inculturative Building, Berastagi sub-district, is a high-risk location because it is located in an area prone to earthquakes, high ground and prone to landslides. Construction of the GBKP Bukit District Inculturative Building. Berastagi was created as a place of worship which is filled with worshipers every day. Therefore, the planning and construction of the type of substructure (foundation) needs to be carefully calculated so that the building does not subside or collapse. The purpose of this research is to determine the cost comparison between planning and implementation costs for drill pile foundation work in the field and to determine the carrying capacity of the drill pile foundation on the GBKP Bukit District Inculturative Building construction project. Berastagi, knowing the dimensions of the reinforcement used in the foundation of the GBKP Bukit Kec Inculturative Building. Berastagi and knowing the method of carrying out construction work and the planned cost budget (RAB) for the drill pile foundation at the GBKP Bukit Inculturative Building, Berastagi District. This research is planned to target outputs in the Juitech Journal, as mandatory outputs and the results of this research will produce additional outputs in the form of teaching materials and will also be discussed before publication. The Technology Readiness Level (TKT) of the proposed research is at level 2 where analysis is carried out by comparing the planning cost plans and treatment cost budgets in the field.
Studi Pengembangan Lapangan Gas X dengan Simulasi Reservoir X Gas Field Development Study Using Reservoir Simulation Rachmatika, Danella; Mardiana, Dwi Atty; Prakoso, Suryo; Fathaddin, Muhammad Taufiq
JUITECH: Jurnal Ilmiah Fakultas Teknik Universitas Quality Vol 8, No 1 (2024)
Publisher : Universitas Quality

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.36764/ju.v8i1.1255

Abstract

Lapangan X terletak di Laut Natuna Barat. PT. PQR mengebor sumur lapangan X pada tahun 2006 dan menembus beberapa bantalan gas di batupasir Upper dan Middle Arang. Studi lapangan X dimulai pada tahun 2006 dan selesai pada tahun 2013, namun akan ditinjau kembali pada tahun 2022 dengan maksud untuk melihat potensi bidang X dengan pemahaman saat ini. Tiga model reservoir untuk lapangan X dibangun dengan mengintegrasikan data geologi, geofisika, dan reservoir untuk menilai kisaran faktor pemulihan gas dan untuk mengoptimalkan rencana pengembangan lapangan. Dari hasil simulasi reservoar yang dilakukan pada masing-masing kasus, diperoleh perkiraan cadangan gas awal (OGIP) sebesar 14,6 untuk skenario 1, 44,2 untuk skenario 2 dan 59,2 skenario 3. Hasil studi menunjukkan bahwa skenario 3, skenario pengembangan dua sumur merupakan skenario pengembangan yang paling optimal dengan prediksi cadangan yang paling tinggi.
PENGENDALIAN BAHAN BAKU DENGAN MENGGUNAKAN PENDEKATAN JUST IN TIME DI PT. DHARMALINDO EKA PERSADA Periyansah, Periyansah; Rahayu, Monita; Arlianti, Lily
JUITECH: Jurnal Ilmiah Fakultas Teknik Universitas Quality Vol 7, No 2 (2023): Volume 7 No 2 Tahun 2023
Publisher : Universitas Quality

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.36764/ju.v7i2.1149

Abstract

PT. Dharmalindo Eka Persada, a foam-based producer, is facing the problem of stockpiling raw materials for aluminum thermal insulation and anti-vibration products due to unstable fluctuations in market demand. This study analyzes the application of the just in time method in companies for inventory cost efficiency. Using a qualitative descriptive approach with interviews, library studies, and inventory reports for 2022, the study found that current inventory control policies are not optimal. In the case of the raw material polyurethane foam eow gray, savings of 55% were achieved with the JIT method, reducing inventory costs from Rp.18,553,771 to Rp.8,297,499. For the raw material polyethylene foam fireretendant, savings of 55% also occurred with inventory costs falling from Rp.43,655,932 to Rp.19,523,526.
Analisis Perkembangan Penelitian Bioetanol Menggunakan Pendekatan Bibliometrik Fathaddin, Muhammad Taufiq; Mardiana, Dwi Atty; Prakoso, Suryo; Samsol, Samsol; Ziad, Ziad
JUITECH: Jurnal Ilmiah Fakultas Teknik Universitas Quality Vol 7, No 2 (2023): Volume 7 No 2 Tahun 2023
Publisher : Universitas Quality

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.36764/ju.v7i2.1076

Abstract

Masalah lingkungan termasuk perubahan iklim dan kesehatan manusia akibat emisi minyak dan gas bumi menjadi perhatian utama di dunia. Di samping itu cadangan bahan bakar fosil tersebut yang terus berkurang serta kebutuhan akan energi yang terus bertambah mendorong pencarian sumber energi terbarukan yang lebih ramah terhadap lingkungan. Salah satunya adalah ketertarikan pada penggunaan bioetanol dan Teknik pembuatannya yang terus meningkat. Dalam beberapa dekade terakhir, jumlah publikasi mengenai tema ini menunjukkan peningkatan. Kajian ini bertujuan untuk mengamati perkembangan penelitian mengenai pembuatan bioetanol melalui perkembangan publikasi artikel. Pendekatan bibliometrik terhadap berbagai publikasi dilakukan untuk mendapatkan informasi mengenai arah pengembangan dan kebaruan penelitian mengenai bioetanol. Sejumlah 980 literatur yang relevan berdasarkan data publikasi antara 1989 hingga 2023 dari database Google Scholar telah dianalisis. Kata kunci yang digunakan dalam penelusuran adalah “bioethanol”. Aplikasi Harzing’s Publish or Perish dan VOSviewer digunakan sebagai perangkat untuk melakukan pengumpulan data dan analisis terhadap publikasi dengan kata kunci tersebut. Hasil penelitian menunjukkan bahwa dari 980 publikasi terkait biodiesel, diperoleh kata-kata dengan frekuensi kemunculan tertinggi yaitu “Singh, A” dan “pretreatment” berturut-turut sebagai penulis dan tema yang paling banyak tertulis dalam artikel. Berdasarkan tahun publikasi terlihat bahwa jumlah penerbitan meningkat pada kurun waktu dari 2007 hingga 2011 dan dari 2015 hingga 2020. Sedangkan penurunan publikasi artikel terjadi pada kurun waktu dari 2011 hingga 2015 dan dari 2020 hingga sekarang.
Analisis Tingkat Kenyamanan Parkir Di Taman Beringin Medan Surbakti, Asri Afriliany; Rizalitaher, Alif Saum
JUITECH: Jurnal Ilmiah Fakultas Teknik Universitas Quality Vol 8, No 1 (2024)
Publisher : Universitas Quality

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.36764/ju.v8i1.1339

Abstract

Taman Beringin is a city forest in Medan Polonia District that does not have parking space in the park. This caused visitors to park their vehicles on Teuku Cik Ditiro Street, right in front of Taman Beringin. Teuku Cik Ditiro Street is a road with a width of 12 meters that can be traversed by 4 vehicles with 2 lanes. Parking area provided for visitors in the one-line Beringin Park on Teuku Cik Ditiro Street. The effect of using parking on the side of the Teuku Cik Ditiro road caused traffic chaos to increase, plus the presence of food vendors in front of Taman Beringin which also ate Teuku Cik Ditiro street. Visitors must park their vehicles outside Beringin Park because there is no parking area inside Beringin Park. The purpose of this research is to find out the level of parking comfort in Taman Beringin. The result obtained is that there are still aspects that cause discomfort (level of pessimism) for visitors and vehicle users regarding the level of parking comfort in Beringin Park. Comfort due to the presence of food sellers (20%), parking attendant services (40%), and traffic comfort (40%) have a lack of comfort level (level of pessimism).
ANALYSIS OF CAPACITOR PLACEMENT IN 20 kV DISTRIBUTION SYSTEMS USING ETAP 19.0.1 TO SUPPORT THE DEDIESELIZATION PROGRAM Siregar, Israma Dani; Tharo, Zuraidah; Hamdani, Hamdani
JUITECH: Jurnal Ilmiah Fakultas Teknik Universitas Quality Vol 8, No 1 (2024)
Publisher : Universitas Quality

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.36764/ju.v8i1.1260

Abstract

Listrik adalah bagian dari perkembangan teknologi yang merupakan  unsur penting dalam kehidupan kita sehingga mutu pendistribusian tenaga listrik sangat penting dijaga dalam menambahkan bentuk pelayanan terhadap kontribusi nyata kepada masyarakat dan menjaga kebutuhan akan energi listrik yang tumbuh cukup pesat. Salah satu indikator yang harus dijaga serta di perhatikan kualitas dari jaringan adalah menurunnya tegangan listrik yang dapat mengganggu kenyamanan masyarakat. Drop tegangan  dapat diakibatkan oleh beberapa faktor teknis dan faktor non-teknis. Faktor teknis seperti jarak tempuh pusat beban dengan sumber pusat listrik relative jauh yang mengakibatkan terganggunya tegangan pada ujung saluran sehingga mengalami penurunan. Nilai toleransi jatuh tegangan yang diatur dalam SPLN adalah senilai +5% dan -10% untuk jaringan distribusi dengan nominal tegangan 20 kV (SPLN 1/1995).  Gardu Induk Blang Pidie terletak Di wilayah Aceh, dimana GI tersebut menyuplai 3 (Tiga) Unit Layanan Pelanggan antara lain ULP Blang Pidie dengan jarak 5,1 kM, ULP Labuhan Haji dengan Jarak 31 kM serta ULP Tapak Tuan dengan Jarak 80 kMS. Dengan jarak yang cukup jauh dari GI Blang Pidie dengan ULP Tapak Tuan mengalami penurunan tegangan yang terima di Gardu Hubung ULP Tapak Tuan sebesar 18 kV. Metode  yang dilakukan untuk menaikkan tegangan yang diterima di Tapaktuan dengan mengoperasikan mesin diesel Pembangkit Litrik Tenaga Diesel (PLTD) Tapak Tuan untuk Singkron Sistem GI Blang Pidie untuk menaikkan tegangan di ULP Tapaktuan. Program dedieselisasi merupakan bagian dari dukungan pelaksanaan kegiatan G20  Presidensi Indonesia untuk mengalihkan atau mengurangi semua pembangkit listrik tenaga berbasis fosil secara bertahap. Dengan adanya program tersebut maka perlu dilakukan upaya untuk mengurangi pengoperasian dalam pemakaian Solar BBM  PLTD dengan  mempertimbangkan dampak terjadi Drop Tegangan.
Analisis Karakteristik Batuan Dasar Pada Pembentukan Endapan Nikel Laterit di Desa Wulu, Kabupaten Buton Tengah Triyani, Mayang Diva; Permana, Aang Panji; Kasim, Muhammad; Putranto, Faried Ardian
JUITECH: Jurnal Ilmiah Fakultas Teknik Universitas Quality Vol 8, No 1 (2024)
Publisher : Universitas Quality

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.36764/ju.v8i1.1256

Abstract

Nikel merupakan salah satu hasil tambang yang ekonomis dan memiliki nilai jual yang cukup tinggi di pasaran dunia. Nikel memiliki banyak manfaat untuk kehidupan antara lain sebagai bahan campuran stainless steel, pelapis anti karat, baterai, dan lain sebagainya. Lokasi penelitian terletak di Desa Wulu, Kecamatan Talaga Raya, Kabupaten Buton Tengah. Tujuan dari penelitian ini yaitu mengetahui kondisi geologi dan mengetahui karakteristik batuan dasar pada daerah penelitian. Metode penelitian yang dilakukan meliputi observasi lapangan, mapping, drilling, preparasi, analisis laboratorium petrografi dan pengolahan studio. Hasil dan pembahasan menunjukkan bahwa kondisi geomorfologi pada daerah penelitian dikategorikan ke dalam satuan bentuk lahan struktural terdenudasi, statigrafi daerah penelitian terbagi menjadi lerzolit dengan tingkat serpentinisasi tinggi dan lerzolit dengan tingkat serpentinisasi sedang dengan karakteristik secara petrologi berwarna hitam, kondisi segar, derajat kristalisasi holokristalin, granularitas faneritik, bentuk kristal subhedral, hubungan antar kristal equigranular (hipidiomorfik), dan komposisi indeks warna mineral melanokratik (60%-90% mineral mafik). Komposisi mineral pada batuan antara lain mineral olivin, piroksen, serpentin, dan magnetit yang termasuk kedalam Formasi Kompleks Ultramafik (Ku) umurnya diperkirakan berumur Kapur Awal.
PERBANDINGAN HASIL KAJIAN EKSPERIMENTAL KUAT TARIK TULANGAN SIRIP DAN POLOS MENGGUNAKAN CHEMICAL EPOXY ADHESIVE BETON ITEWE Darnianti, Darnianti; Tarigan, Ronald Rezeki; Laia, Fiber Jean Smara; Vernando W, Jeremi Liliteo
JUITECH: Jurnal Ilmiah Fakultas Teknik Universitas Quality Vol 7, No 2 (2023): Volume 7 No 2 Tahun 2023
Publisher : Universitas Quality

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.36764/ju.v7i2.1129

Abstract

Reinforcement strength experimental studies were carried out to determine the quality of the concrete being worked. The positive impact on every construction project in all parts of the world, the real proof of it all is with the establishment of skyscrapers, the longest bridges and various amazing things. The design of the test object used in this study is the design of the existing concrete and the design of the location of the reinforcement. The test was carried out on the quality of concrete by using a hammer test. Hammer Test is used to obtain supporting values from testing the quality of the concrete. This research examines the adhesive power of chemical epoxy adhesive concrete because this chemical epoxy adhesive concret e has become one of the solutions in reinforced concrete problems, where the function of this chemical epoxy adhesive concrete is to bond reinforcing steel to existing concrete, in the research that will be carried out by the author using chemical epoxy adhesive concrete with the product brand Itewe Neo1 which varies with the diameter of steel fin reinforcement D10, D13 and D16, the purpose of this study was to determine the specifications and the effect of the adhesion of chemical epoxy adhesive concrete Itewe Neo1 to steel fin and plain steel.
PERENCANAAN DAN METODE PELAKSANAAN PEKERJAAN PONDASI BORED PILE Saputra, Parada Afkiki Eko
JUITECH: Jurnal Ilmiah Fakultas Teknik Universitas Quality Vol 7, No 2 (2023): Volume 7 No 2 Tahun 2023
Publisher : Universitas Quality

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.36764/ju.v7i2.1228

Abstract

Carrying out work on a building project includes data collection, research/investigation, feasibility studies, planning stage, design stage, procurement/tendering stage, construction implementation stage in the field, maintenance stage up to the preparation stage for building use. These elements work according to a predetermined working relationship pattern. The most important part of all activities is implementation activities. Implementation is the realization of the planning and design stages. Due to the different conditions between planning and implementation, flexibility or thoroughness is required in handling this implementation stage. Sensitivity in capturing and predicting all possibilities based on experience will greatly determine the contractor's success in completing the work. From all the foundation work in this project, it turns out that it does not apply theories rigidly, but can be carried out by considering other factors that do not make it possible to carry out work that is the same as the existing theory. These factors include the ability of the workforce including professionalism and work mentality, imperfect quality and condition of materials, unpredictable weather conditions, as well as difficulties faced in each job caused by imperfect designs and drawing plans. During project implementation, several deviations sometimes occur which can sometimes have fatal consequences for the safety of both workers (not wearing helmets when working) and future building users (work implementation is not according to plans approved by the supervisor). Deviations in foundation work that sometimes occur or negligence made by workers in carrying out work can cause the work results achieved to be not as expected.