cover
Contact Name
Purwanto
Contact Email
indexsasi@apji.org
Phone
-
Journal Mail Official
info@aritekin.or.id
Editorial Address
Perum Dempel Perak No. 54, RT. 010, RW. 025, Kel. Muktiharjo Kidul, Kec. Pedurungan, Kota Semarang, Jawa Tengah, Indonesia
Location
Kota semarang,
Jawa tengah
INDONESIA
Prosiding Seminar Nasional Ilmu Teknik
ISSN : 30634709     EISSN : 30635713     DOI : 10.61132
Prosiding Seminar Nasional Ilmu Teknik, Its a collection of papers or scientific articles that have been presented at the National Research Conference which is held regularly every two years by the Asosiasi Riset Ilmu Teknik Indonesia. The paper topics published in the Prosiding Seminar Nasional Ilmu Teknik the sub-groups of Civil Engineering and Spatial Planning, Engineering, Electrical and Computer Engineering, Earth and Marine Engineering and other relevant fields and published twice a year (June and December).
Articles 16 Documents
Zotero Sebagai Alat Bantu Manajemen Referensi Bagi Mahasiswa Dalam Menyusun Tugas Ilmiah Ossa Sunnah
Prosiding Seminar Nasional Ilmu Teknik Vol. 1 No. 1 (2024): Juni : Prosiding Seminar Nasional Ilmu Teknik
Publisher : Asosiasi Riset Ilmu Teknik Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.61132/prosemnasproit.v1i1.11

Abstract

Effective reference management is an important component in academic writing, especially for students writing scientific assignments. Zotero is a reference management software that offers a variety of features to help students organize, store, and cite their reference sources efficiently. This article discusses the role and benefits of Zotero as a reference management tool, including its ability to integrate with various databases and browsers, ease of managing various types of sources, and collaborative features that support group work. Through the use of Zotero, students can improve the quality of their writing by ensuring accuracy and consistency in reference management. The study also includes a literature review on the effectiveness of Zotero and a survey of the use of this software among college students.
Partisipasi Masyarakat dalam Pengelolaan Sumber Daya Air Berkelanjutan di Karo Syafrizal Alfala; Cut Nuraini
Prosiding Seminar Nasional Ilmu Teknik Vol. 1 No. 2 (2024): Desember : Prosiding Seminar Nasional Ilmu Teknik
Publisher : Asosiasi Riset Ilmu Teknik Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.61132/prosemnasproit.v1i2.34

Abstract

Sustainable water resource management is a crucial issue, especially in horticultural agricultural areas such as Berastagi, Karo Regency, North Sumatra. This area is known for its abundant water resources, but the challenge in optimizing water distribution and quality is still a problem. This study aims to analyze the level of community participation in water resource management in Berastagi and to develop a sustainable management strategy using the SWOT approach. The method used in this study is a SWOT analysis that considers strengths, weaknesses, opportunities, and threats in water management. The results show that community participation in technical aspects is quite high, but still low in terms of planning and evaluation. The main strength factors are abundant water resources and support from the farming community, while weaknesses lie in limited infrastructure and water pollution from agricultural activities. The main opportunities for sustainable water management include irrigation modernization and increased government regulation, while the main threats are the impacts of climate change and the use of chemicals in agriculture that have the potential to pollute water. From this SWOT analysis, it is recommended to develop technology-based irrigation infrastructure, increase socialization and community education to increase involvement in water management, and collaboration between the government, community, and research institutions. It is expected that this strategy can strengthen sustainable and adaptive water resource management in the Berastagi horticultural area.
Kondisi Struktur Tower Baja Terdampak Kebakaran Melalui Inspeksi Secara Visual Zel Citra; Antonius Antonius; Biantoro, Agung Wahyudi
Prosiding Seminar Nasional Ilmu Teknik Vol. 1 No. 2 (2024): Desember : Prosiding Seminar Nasional Ilmu Teknik
Publisher : Asosiasi Riset Ilmu Teknik Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.61132/prosemnasproit.v1i2.40

Abstract

Building fires can significantly degrade the strength and integrity of steel structures, so post-incident evaluation is crucial to ensure building safety and feasibility. This study aims to evaluate the condition of the steel tower structure after the fire through a visual inspection method. A total of 35 structural elements were examined, including columns, beams, and bracing, to identify damage caused by heat exposure. The inspection results showed that 6 elements (17%) were in the category of Acceptable, 8 elements (23%) Needs Attention, 5 elements (14%) Not Acceptable, and 1 element (3%) Not Applicable because they had been removed. Steel columns generally remain upright without deformation, but suffer damage to the protective layer (coating). In contrast, most blocks lose their protective layers, are directly exposed to fire, show early signs of corrosion, and some suffer severe damage such as flange tears and cuts. These findings confirm the importance of systematic documentation and classification of element conditions as the basis for technical decision-making for structural improvement. Visual inspection proved effective as an initial step in the evaluation process, providing a relevant initial picture of the extent of damage and the need for intervention. This study recommends follow-up in the form of advanced structural analysis and material testing to ensure the feasibility of reusing the affected steel elements.
Faktor Utama Penghambat Penerapan Manajemen Risiko Biaya pada Pelaksanaan Proyek Konstruksi Gedung Bertingkat di Surabaya dengan Menggunakan Metode AHP Fuzzy Tia Herlina Sugiharto; Michella Beatrix
Prosiding Seminar Nasional Ilmu Teknik Vol. 2 No. 2 (2025): Desember: Prosiding Seminar Nasional Ilmu Teknik
Publisher : Asosiasi Riset Ilmu Teknik Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.61132/prosemnasproit.v2i2.44

Abstract

The implementation of risk management is an important method that is carried out in order to identify risk factors that may arise during the implementation of the project. However, the implementation of risk management still faces some obstacles in its implementation. Therefore, this study aims to analyze the barriers to the implementation of risk management in construction projects in Surabaya. A total of 80 respondents filled out questionnaires from construction service providers including contractors and consultants. Respondents involved include professional experts such as Project Managers, Site engineers, Site managers, implementers, estimators, General Managers and Company Directors. Data processing using fuzzy AHP method as a data processing tool and decision making. The results of the study revealed that the main factors that can hinder the implementation of cost risk management are inaccurate cost estimates (Y4) with the highest weight of 0.433, lack of quality Control (Qc) supervision criteria (Y5) is ranked second with a weight of 0.288, poor coordination between stakeholders (owner,contractor and consultant) (Y1) is ranked third with a weight of 0.274, lack of risk management training (Y3) is ranked fourth with a weight of 0.005, and some, old age) (Y2), the work can not be done according to the work drawings (Y6), limited skilled human resources (Y7), materials not according to specifications (Y8), improper initial cost estimation (Y9), late progressive payment from the owner (Y10) ranked fifth jointly because it has an equivalent weight value of 0.These findings conclude that accurate cost estimation (Y4) is very important in construction projects because it becomes the main basis in budget planning, decision making, and risk management.
Penerapan Metode AHP-Fuzzy untuk Mengukur Pemahaman Penyedia Jasa Konstruksi terhadap Sistem E-Tendering di Kota Surabaya Fahreza Irghi Budi Saputra; Michella Beatrix
Prosiding Seminar Nasional Ilmu Teknik Vol. 2 No. 2 (2025): Desember: Prosiding Seminar Nasional Ilmu Teknik
Publisher : Asosiasi Riset Ilmu Teknik Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.61132/prosemnasproit.v2i2.45

Abstract

E-Tendering is an electronic-based procurement method that integrates all parties involved in construction projects through a digital platform, simplifying communication, document exchange, and transactions from the initial stage to project completion. The primary objective of implementing E-Tendering in the construction sector is to improve efficiency and transparency in the procurement process of goods and services. However, construction service providers often face obstacles in E-Tendering, such as limited technological proficiency, administrative errors that may disqualify bids, and technical issues like internet connectivity and platform system reliability. Therefore, this research aims to identify the barriers and level of understanding of E-Tendering among construction service providers in Surabaya. A total of 51 respondents were selected using snowball sampling, based on their participation in the E-Tendering system. Data processing in this study employed a quantitative approach using the Fuzzy AHP method to analyze the criteria and sub-criteria related to understanding and obstacles in participating in electronic construction service tenders (E-Tendering). The results of the analysis of service providers’ understanding of the E-Tendering system using the AHP method showed a λmax value of 9.09, a Consistency Index (CI) of 0.01, and a Consistency Ratio (CR) of 0.007. The CR value, which is far below the threshold of 0.10, indicates that the respondents’ assessments are consistent, meaning that the pairwise comparison results of the nine criteria can be considered valid and reliable.
Faktor Dominan Keterlambatan pada Proyek Konstruksi Gedung Bertingkat di Surabaya dengan Metode Relative Importance Index (RII) Ninda Qurmaulia Dhani; Michella Beatrix
Prosiding Seminar Nasional Ilmu Teknik Vol. 2 No. 2 (2025): Desember: Prosiding Seminar Nasional Ilmu Teknik
Publisher : Asosiasi Riset Ilmu Teknik Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.61132/prosemnasproit.v2i2.50

Abstract

Delays in high-rise building construction projects in Surabaya are a crucial issue as they can significantly affect cost, quality, and project completion schedules. This reserach intends to identify the dominant factors contributing to project delays using the Relative Importance Index (RII) method, considering both frequency and impact aspects. Data were obtained from 80 valid respondents who hold strategic roles in construction project implementation, such as Project Managers, Site Managers, Site Engineers, Estimators, Field Supervisors, General Managers, and Company Directors. The analysis results indicate that in terms of frequency, the dominant factors are unfavorable weather conditions (RII = 0.750), labor shortages (RII = 0.743), and design changes during construction (RII = 0.735). Meanwhile, in terms of impact, the dominant factors are delays in material delivery (RII = 0.780), labor shortages (RII = 0.770), and substandard material quality (RII = 0.740). These findings emphasize that labor shortage consistently influences project delays in both frequency and impact, while weather and material factors show different patterns between occurrence and consequence. All dominant factors were classified into the High-Medium category, indicating that they should be prioritized in project risk management.