cover
Contact Name
-
Contact Email
-
Phone
-
Journal Mail Official
-
Editorial Address
-
Location
Kota surabaya,
Jawa timur
INDONESIA
Jurnal Titra
ISSN : -     EISSN : -     DOI : -
Core Subject : Engineering,
Arjuna Subject : -
Articles 949 Documents
Perancangan Sistem Manajemen Mutu Produk Kemasan di PT. X Elbert Giovanni; Felecia Felecia
Jurnal Titra Vol 10, No 2 (2022): Jurnal Titra 10(2) Juli 2022
Publisher : Jurnal Titra

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

PT. X is a company that is growing on a large scale and requires process control in product design activities to reduce product defects. The research was conducted with the aim of designing a quality management system in the TTPI department at PT. X. The research focuses on the design of packaging products. The quality management system is designed to minimize the impact of packaging product defects such as poor product functionality, specifications that are not in accordance with demand and others. There were 10 types of packaging defects found. The design is using the DMAIC method and the analysis using 5 whys analysis. 10 packaging defects have root causes, namely measurement errors, color determination, finishing, and different understandings with vendors. The proposed improvements are in the form of a sequential control process from making print files (die line), requesting and reviewing the results of raw designs, semi-finished designs and finished designs from vendors. This improvement proposal is controlled by making SOPs, vendor visits, standardization of measuring instruments and colors. From the suggested improvements, it is considered that can be used as a step to anticipate errors in packaging product specifications and the product design process to be more structured.
Usulan Perbaikan Pengiriman di PT. X untuk Mengurangi Lama Lembur Pekerja Brian Farrel Ponda; I Gede Agus Widyadana
Jurnal Titra Vol 8, No 2 (2020): Jurnal Titra 8(2) Juli 2020
Publisher : Jurnal Titra

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

PT. X has a problem with overtime and delivery costs not being met. This problem is caused by PT. X did not have enough cars to meet his demand. For example, in shipments made in August 2019 where PT. X is 376,515 goods but the successful shipment was carried out by PT. X is only 200,743 items. This causes every car of PT. X has to ship more than once to be able to fulfill the shipment. But the distance of PT. X is far, unpredictable road conditions make workers PT. X has to work overtime every day, even the average worker's overtime in June, July and August is 3 hours. In addition to the average overtime duration overtime costs to be paid by PT. X in June, July and August 2019 is Rp 175,593,867 every month. Although the workers of PT. X overtime every day PT. X still can't fulfill his request. So from this problem the research was conducted to be able to provide proposals to PT. X to be able to reduce overtime costs and to meet deliveries.
Upaya Peningkatan Produktivitas melalui Proyek Continuous Improvement pada Line Y di PT. Z Isaiah Thomas Joyodiono; Herri Christian Palit
Jurnal Titra Vol 10, No 2 (2022): Jurnal Titra 10(2) Juli 2022
Publisher : Jurnal Titra

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

PT. Z is one of the largest tobacco producing companies in Indonesia, as a company that has the spirit of continuous improvement, the company wants to continue to increase their productivity, which is measured by yield and labor productivity. This research was conducted to provide suggestions as an effort to increase yield and labor productivity. In the project of eliminating idle time for the rotary dryer, it was carried out by rotating workers and adding workers from other lines, the result shows there was a significant increase in labor productivity. In the cleaning process, a suggestion was given in the form of the method used, which initially used the blow method to the suction method. In the metal detecting process, it is proposed to place a magnet before the raw material passes through the metal detector machine, this is expected to reduce overprocessing waste by 25 to 37.5 minutes or 625 to 937.5 kilograms. To determine machine parameters that affect yield, multiple linear regression analysis was performed. Based on these results, it was found that there were 4 variables. which significantly affects the yield for product 1. Meanwhile for product 2, there were 5 variables that significantly affect yields.
Perancangan Sistem Pemantauan untuk Meningkatkan Pencapaian Realisasi dengan Perencanaan Painting di PT X Vanessa Angela Chionardes; I Gede Agus Widyadana
Jurnal Titra Vol 10, No 2 (2022): Jurnal Titra 10(2) Juli 2022
Publisher : Jurnal Titra

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

PT X as a company that produces various types of bicycles has problems which one of them is painting process that does not produce output on time and in the right amount according to PPIC’s schedule. Based on Fishbone Diagram and Pareto Chart analysis, the most affecting factors are method, material, and environment.  The method factor is repair work has not been monitored well so there might be work delay. The monitoring system design in this research begins with improving the flow, then continued with the making of SOP and database in Google Sheets. The average percentage of realization accomplishment with planning from February until March (before implementation) is 32.09% and it increases to 50.01% from April until May (after implementation). Monitoring system can also show painting repair team performance that is presented by the percentage of daily repair accomplishment that has an average of 72.13% in April and 52.62% in May which is still below the target.
Perancangan Komponen Modular untuk Pembentukan Spesifikasi dan Harga Sepeda OEM di PT X Andrew Stephen; Tanti Octavia
Jurnal Titra Vol 9, No 2 (2021): Jurnal Titra
Publisher : Jurnal Titra

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

PT X is a bicycle manufacturing industry that develops, manufactures and sells bicycles to several countries around the world. One of the marketing channels carried out by was OEM. The problem faced by the OEM Sales is the complexity of the work process in making specifications for bicycle components and the costing process. This complexity occurs due to the demand for customizable bicycle specifications from many customers which results in increased variations in the use of bicycle components. The purpose of this research is to design a modular component as a tool for making component specifications and bicycle prices that have the same use of components from different bicycle criteria. The research method was carried out qualitatively and quantitatively. The results obtained from the research are the process complexity of making specifications for bicycle components and the costing process were reduced. The main conclusion that can be drawn is the design of the modular components as a prototype program to facilitate the process of making component specifications and the costing process resulting in reducement of components usage on different bicycle criteria.
Rancangan Pembuatan Program Perhitungan Packing Material Menggunakan Macro Excel pada PT Trias Sentosa William Goentoro; Karina Agustin
Jurnal Titra Vol 8, No 2 (2020): Jurnal Titra 8(2) Juli 2020
Publisher : Jurnal Titra

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Packing material calculation is an important things to be considered by the company. Company still uses a manual method to calculate packing material. Calculation program only calculate four type of packing material which is plywood, pallet, fitting and box. These four packing materials must be adjusted with the company products characteristics that makes these four packing materials have special calculation to increase productivity. Program was made using software called Macro Excel. Designing program provides convenience for company to minimize time and human error. This program also accompanied with a digital dashboard that give information about reorder point and economic order quantity of these four packing materials. 
Perancangan Layout Penempatan Material pada Gudang PT. XYZ untuk Implementasi Sistem FIFO Jezreel Willy Adichnadra; Herry Christian Palit
Jurnal Titra Vol 10, No 1 (2022): Jurnal Titra Januari 2022
Publisher : Jurnal Titra

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

The problem that exists in the warehouse at PT. XYZ is that there is no material placement layout in the warehouse that supports the FIFO system. The proposal given is to make a layout of material placement in the warehouse by calculating the number of pallets used for each existing material and making a storage and retrieval mechanism that supports the FIFO system will run better. The proposed results can create a more friendly environment for the FIFO system. The ABC method is the main method used to determine the priority of material mapping on the shelves in the warehouse. Then by finding the right order of priority, the calculation to determine the number of pallets used for each material will be easier to find and do. The calculation of the use of pallets that have been obtained will be a reference for the exact location of the material on the shelves in the warehouse, so that the placement of materials in the warehouse will be arranged which creates an environment that makes it easy to find each material to be found and the FIFO system will be easier to run.
Dampak Program Enhancement dan Work Engagement Terhadap Kinerja Karyawan Bank Jatim Andreas Kristanto Nahot; I Nyoman Sutapa
Jurnal Titra Vol 10, No 2 (2022): Jurnal Titra 10(2) Juli 2022
Publisher : Jurnal Titra

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Performance is influenced by individual ability and work engagement. To improve the ability of its employees, Bank Jatim provides a program called enhancement. Based on the annual report of Bank Jatim, the program assessment given is only limited to pre-test and post-test, which if the post-test score is high then the employee is considered good. Therefore, this study aims to determine whether the enhancement and work engagement programs have an effect on employee performance and a description of the work engagement of Bank Jatim employees. The data used in this study is the KPI balanced scorecard from the perspective of learning and growth and finance and questionnaires distributed to 54 employees in all branches throughout East Java. After all the data was collected, the data was analyzed descriptively using the Structural Equation Modeling (SEM) method to determine the effect between variables. The results of this study are enhancement programs have an impact on employee performance but work engagement has no impact on employee performance. In addition, the description of work engagement shows that the majority of employees who get high engagement scores come from employees who have worked under 5 years.
Perancangan Sistem Pemantauan dan Pengontrolan Truk Pada PT X Robert Yunior Anthoni; Benedictus Rahardjo
Jurnal Titra Vol 9, No 2 (2021): Jurnal Titra
Publisher : Jurnal Titra

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

PT X is an automotive company that operates as a manufacturer, assembler, and distributor in and outside the country. PT X is a subsidiary of a multinational company. PT X uses the Just In Time (JIT) principle, so it does not have inventory (zero inventory). PT X produces motorbikes that have a type and color type, where motorbikes produced will be distributed to 29 main dealers. Land distribution will use trucks provided by the transporters, where the trucks used will be regulated in accordance with government regulations. The regulation issued by the government regarding this matter is the rule of Over Dimension Overload (ODOL), where the regulation regulates the dimensions of the trucks used to transport goods. The use of dashboards is a solution to simplify the process of monitoring and controlling the condition of each truck at each main dealer. The use of dashboards for monitoring and control processes is more effective and efficient, because the dashboard can provide a lot of information through just one view. The use of the dashboard increases the progress of improvement, where in January 2019 only 63.13% to 76.55% in April 2019.
Analisis Kelayakan Proyek Penggantian Mesin Otomasi pada PT. X Eunike Apriliana Hartanti Mursalim; Felecia Felecia; Karina Agustin
Jurnal Titra Vol 10, No 2 (2022): Jurnal Titra 10(2) Juli 2022
Publisher : Jurnal Titra

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

PT. X is one of the transformer manufacturers in Indonesia. The difference in standard time at each workstation causes a bottleneck on the Core Coil Assembly (CCA) line resulting in late demand fulfillment. Coil LV has the longest processing time among others, therefore a semi automated machine replacement project is carried out to reduce the processing time. The purpose of this research is to find whether replacement on semi automated machine is the best option to be implemented for coil LV workstation. A Break Even Point (BEP) analysis will be used to compare the current state (manual machine) with two alternatives project (combination of semi automated machine). BEP value of alternative 1 is 2,292 units, while alternative 2 is 2,647 units. However, the replacement project is not feasible to be implemented this year because the use of manual machine has a lower cost to meet the demand of 1,601 units. Actually, the optimal capacity for semi automated machines is 8 coil units per shift, so the company can increase the output capacity by reviewing the number of demands.