JENIS-JENIS PERUBAHAN DESAIN PADA PROYEK RUMAH SAKIT DENGAN KONTRAK DESIGN AND BUILD DI DAERAH KEPULAUAN INDONESIA Mardiaman; Agusta, Yofan Saman
Menara: Jurnal Teknik Sipil Vol. 22 No. 1 (2027): Menara : Jurnal Teknik Sipil
Publisher : Teknik Sipil, Fakultas Teknik Universitas Negeri Jakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21009/jmenara.v22i1.69237

Abstract

Penelitian ini bertujuan mengidentifikasi jenis-jenis perubahan desain yang paling dominan pada proyek rumah sakit dengan kontrak Design and Build (D&B) di wilayah kepulauan Indonesia, khususnya Kabupaten Nias dan Kabupaten Kepulauan Anambas. Penelitian menggunakan pendekatan kuantitatif melalui metode survei. Data dikumpulkan dari 100 responden yang terdiri atas kontraktor, konsultan perencana, konsultan pengawas, manajemen konstruksi, pemilik proyek, dan akademisi yang terlibat dalam proyek rumah sakit. Instrumen penelitian mencakup 20 variabel perubahan desain yang disusun berdasarkan kajian literatur dan diukur menggunakan skala Likert lima tingkat. Analisis data dilakukan menggunakan Relative Importance Index (RII) untuk menentukan tingkat kepentingan dan peringkat masing-masing faktor. Hasil penelitian menunjukkan bahwa perubahan akibat bencana alam (X20) merupakan faktor paling dominan, diikuti oleh perubahan akibat kondisi lapangan (X3), integrasi sistem MEP dan peralatan medis (X8), regulasi dan perizinan (X18), serta kesalahan dan kekurangan desain awal (X2). Temuan ini mengindikasikan bahwa faktor eksternal dan teknis memiliki pengaruh yang lebih besar dibandingkan faktor manajerial dalam memicu perubahan desain pada proyek rumah sakit di wilayah kepulauan. Hasil penelitian dapat digunakan sebagai dasar peningkatan kualitas perencanaan, investigasi lapangan, koordinasi desain, penerapan BIM, dan manajemen risiko untuk mengurangi perubahan desain serta meminimalkan keterlambatan proyek rumah sakit.
Analysis of Technical Factors Causing Deviation of Spun Pile Coordinate Points in the Data Center Construction Project Sopar Butarbutar; Mardiaman
Civilla : Jurnal Teknik Sipil Universitas Islam Lamongan Vol 11 No 2 (2026): SEPTEMBER
Publisher : Program Studi Teknik Sipil, Fakultas Teknik, Universitas Islam Lamongan

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30736/cvl.v11i2.1609

Abstract

Foundation works, especially in high-precision buildings like data centers, must account for pile coordinate point deviation, which can cause structural eccentricity, pile cap redesign, cost overruns, and schedule delays. This study examines technical parameters affecting spun pile foundation coordinate deviation in a data center construction project (Data Centre X). A total of 153 respondents-surveyors, piling operators, site engineers, and supervisors-completed a standardized questionnaire administered through online platforms using a quantitative descriptive technique, and their responses were ranked using the Relative Importance Index (RII) to identify the technical aspects affecting pile position variation. Measurement-related factors dominate deviation, with total station instrument condition and calibration having the highest RII value (0.963), pile point marking clarity (0.957), and surveyor, operator, and foreman communication (0.945). Equipment condition, operator compliance, and experience also mattered. The data show that technical and operational factors, not geotechnical issues, determine spun pile coordinate variations. To assure foundation accuracy in high-precision building projects, this study emphasizes stringent measuring, staking out, and field coordination quality control.
Limits of Contractual Freedom under FIDIC and Indonesian Legal Sovereignty: Harmonizing Civil and Common Law Mardiaman; Henry Maurice Situmorang; Rudi P. Sitorus; Larap Kemayan Estu
Pena Justisia: Media Komunikasi dan Kajian Hukum Vol. 25 No. 2 (2026): Vol. 25 No. 2 (2026): Pena Justisia
Publisher : Faculty of Law, Universitas Pekalongan

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31941/pj.v25i2.8306

Abstract

Infrastructure projects in Indonesia that are financed by multilateral lenders or involve foreign contractors may use FIDIC conditions of contract, which rely largely on common law drafting techniques, whereas Indonesian contract law is codified and supplemented by mandatory sector-specific rules on construction services. Previous Indonesian studies compare FIDIC with national standard contracts but do not specify where party autonomy ends. This normative legal study examines how civil law and common law principles interact in FIDIC-based construction contracts, where freedom of contract ends when FIDIC clauses meet mandatory Indonesian norms, and which harmonization model preserves legal certainty and Indonesian legal sovereignty. It applies statutory, conceptual, comparative, and case approaches to the Civil Code, Law No. 2 of 2017 on Construction Services and its implementing regulation, the language and arbitration laws, Supreme Court Circular Letter No. 3 of 2023, the Nine AM Ltd. decisions, and the 2017 FIDIC Red Book. The analysis distinguishes three types of collision: conflicts with mandatory norms, differences in contract interpretation, and conflicts of applicable law or forum. Construction-specific norms, namely the bilingual contract requirement, statutory liability for building failure, and the rule that construction contracts are subject to Indonesian law, restrict party autonomy more than the general provisions of the Civil Code. The study proposes a layered harmonization model that places these norms above the Particular and General Conditions, treats dispute boards, arbitration, and public-policy review as safeguards, and derives drafting and regulatory recommendations.
Design Change Factors in Hospital Design-Build Projects: Variable Validation and RII Analysis Yofan Saman Agusta; Mardiaman Mardiaman
ASTONJADRO Vol. 15 No. 4 (2026): ASTONJADRO
Publisher : Universitas Ibn Khaldun Bogor

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32832/astonjadro.v15i4.23800

Abstract

Hospital construction projects in island regions face compounded challenges that differ fundamentally from urban settings. This study investigates design change factors in hospital construction under the Design and Build (D&B) contract scheme, with empirical reference to the Tafaeri Hospital project in Nias and the Tarempa Hospital project in Anambas. A two-phase research design was employed. Phase one involved a preliminary survey using expert judgment, where five construction professionals evaluated 20 candidate variables derived from a systematic literature review, using a five-point Likert scale. Seventeen variables met the relevance threshold (mean ≥ 3.0) and were retained. Phase two involved a main survey distributed to 157 practitioners to measure the relative significance of each validated variable. Data were analysed through Pearson validity testing, Cronbach Alpha reliability assessment, and Relative Importance Index (RII) scoring. All 17 variables demonstrated valid correlation coefficients (r > 0.156, p = 0.000) and the instrument achieved high reliability (Cronbach Alpha = 0.897). The three highest-ranked variables were site condition changes (RII = 0.775), natural disaster impacts (RII = 0.767), and MEP system and medical equipment integration issues (RII = 0.708). These findings confirm that geographic vulnerability and technical complexity are the dominant design change drivers in island-based hospital D&B projects, and provide a validated empirical foundation for risk mitigation strategies in similar settings.
Welding Quality Control Analysis on Steel Structure of Pedestrian Bridge (JPO) at PMJ Land Tower Building from a Project Management Perspective Muhammad Firdaus; Mardiaman Mardiaman
ASTONJADRO Vol. 15 No. 4 (2026): ASTONJADRO
Publisher : Universitas Ibn Khaldun Bogor

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32832/astonjadro.v15i4.23873

Abstract

Welding of steel structure components in pedestrian bridge (JPO) elements of high-rise buildings is a critical operation that determines structural integrity and user safety. Weld joint failures may reduce load-bearing capacity by 25–40%, making a comprehensive quality control system essential. Empirical studies specifically examining welding quality control for high-rise building JPO structures based on AWS D1.1:2025 and project management perspectives remain scarce in Indonesia; no published study has yet integrated technical, managerial, and human resource factors in a single quantitative model. This study aims to: (1) identify the actual implementation of welding quality control based on AWS D1.1:2025; (2) analyze factors affecting welding output quality; (3) identify dominant variables; and (4) formulate improvement recommendations. A descriptive-associative quantitative method was applied with 35 respondents — welders, Quality Control Inspectors, Welding Inspectors, Site Engineers, Field Supervisors, and Supervision Consultants — at the PMJ Land Tower Building project, East Jakarta (2024–2025). Data were collected via a 5-point Likert scale questionnaire covering 23 independent variables (X1–X23) across four dimensions: technical aspects, human resources, management & supervision, and work environment. Analysis used SPSS 26, including validity testing (Pearson, r-table = 0.334), reliability (Cronbach’s α = 0.892), normality (Kolmogorov–Smirnov), descriptive statistics, rank score analysis, and Pearson correlation. Variable mean scores ranged from 3.89 to 4.26 (Good to Very Good). The three dominant variables were Technical Training (X12, mean = 4.26), Welder Certification (X3, mean = 4.17), and WPS & PQR (X2, mean = 4.14). Work Environment (X5) and VT Effectiveness (X16) scored lowest (mean = 3.89). Correlation testing yielded r = 0.086 (p = 0.622 > 0.05), interpreted through a compliance gap — a discrepancy between positive respondent perceptions and actual field implementation. The study recommends enhancing RKS specifications, improving NDT consistency through an Inspection and Test Plan (ITP), strengthening welder qualification systems, and implementing digital documentation for improved traceability.