Claim Missing Document
Check
Articles

Found 35 Documents
Search

TRAFFIC PERFORMANCE ANALYSIS OF SECTIONS JL. PATI RAYA-JUWANA AT THE INTERSECTION OF ALUN-ALUN JUWANA PATI REGENCY USING THE MKJI 1997 METHOD Hanafi, Irfan; Suwandi, Putri Anggi Permata; Yudaningrum, Farida
International Journal of Sustainable Building, Infrastructure and Environment (IJOSBIE) Vol 5, No 1 (2024)
Publisher : Science and Technology Research Centre, Universitas PGRI Semarang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26877/ijosbie.v5i1.16827

Abstract

The signaled interchange  at Jl. Pati  Raya-Juwana is one of the influential transportation infrastructure for road users who will go to Pati City, Rembang and the industrial center in Juwana. During rush hour the area often has traffic jams. Therefore,  this study was carried out with the aim of analyzing signaling intersections, replanning cycle times, knowing the traffic characteristics of the Pati Raya-Juwana road section.  Data collection was carried out for 4 days by taking peak hours at 06:30 WIB – 07:30 WIB and 16:00 WIB – 17:00 WIB. Themethod of data retrieval carried out is traffic flow, volume, and cycle time at traffic light. The results of the study were  pthere were existing conditions chosen alternative A as the best alternative for replanning traffic cycle time with 2 phases tonario 1 dwith t saturation degree 0.68, queue length 34.83 m and delay 15.06 seconds on the south shortening, then on the western approach for the saturation degree 0.51, queue length 23.51 m and delay of 11.07 seconds,  and 0.19 degrees of saturation, a queue length of 12.32 m, and a delay of 11.39 seconds on the north quarter. From the results of the analysis, it can be concluded that the results of the traffic performance evaluation at the Juwana square intersection obtained the highest volume on Monday, July 3, 2023, so it is recommended to reset the traffic cycle time.
Analysis of Puri Pati Market Parking Land Needs Rohman, syamsul; Suwandi, Putri Anggi Permata; Yudaningrum, Farida
International Journal of Sustainable Building, Infrastructure and Environment (IJOSBIE) Vol 4, No 2 (2023)
Publisher : Science and Technology Research Centre, Universitas PGRI Semarang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26877/ijosbie.v4i2.17463

Abstract

Abstract. Puri Market, which is located on Jalan Colonel Sunandar, precisely in the center of Pati Regency, is a traditional market which is the basis for the people of Pati to sell and buy all life-sustaining needs. This needs to be taken into account considering that the existence of an activity center must have as few parking areas as possible. Therefore, this study was carried out with the aim of providing recommendations for parking characteristics, parking space capacity and planning the most optimal parking layout for Puri Pati Market. Conditions are reviewed on 1 weekend and 3 weekdays.From 06.00 to 12.00. With the current existing motorbike parking space capacity of 280 SRP at Puri Pati Market, it can still meet existing parking needs. From the calculations that have been carried out, it is known that the need for motorbike parking space at Puri Pati Market is 345 SRP. Keywords: Market, Parking Space Capacity, SRP.
ANALYSIS OF THE INFLUENCE OF OVERLOADING VEHICLES ON DECREASING THE LIFE OF ROAD PLANS ON RIGID PAVEMENT ON PANTURA ROAD KM 11 TO KM 21, BATANG DISTRICT Yudaningrum, Farida; Firmansyah, Ekky
International Journal of Sustainable Building, Infrastructure and Environment (IJOSBIE) Vol 4, No 1 (2023)
Publisher : Science and Technology Research Centre, Universitas PGRI Semarang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26877/ijosbie.v4i1.13939

Abstract

Abstract. The north coast road is the main route that connects several provinces, cities, and regencies on the north coast of Java. The road is traversed by many heavy vehicles loaded with goods, so there is the potential for frequent violations caused by excessive loads. Given these problems, this study aims to determine the effect of excessive load on heavy vehicles on decreasing road life.The data used are primary and secondary data, primary data in the form of photos of observations at the Subah Weighbridge and interviews with the head of the Subah Weighbridge, secondary data in the form of actual vehicle weight data from the Subah Weighbridge, LHR, and road age from the National Road Planning Center. Central Java – DI Yogyakarta, then calculate the percentage value of VDF due to overload and decrease in the design life of the road using the vehicle damage factor value using the Bina Marga method (1987).The results of this study indicate that excessive load on heavy vehicles can affect the decrease in road design life. With the actual overload that occurred on Jalan Pantura KM 11 to KM 21, Batang Regency, the cumulative VDF increase based on the Bina Marga method (1987) was 2.63%. The decrease in design life due to actual overload based on the Bina Marga method (1987) was 0.04 years. 
ANALISA KEBUTUHAN LAHAN PARKIR PASAR PURI PATI Rohman, Syamsul; Suwandi, Putri Anggi Permata; Yudaningrum, Farida
Jurnal Teknik Sipil Giratory UPGRIS Vol 4, No 2: Desember 2023
Publisher : Universitas PGRI Semarang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26877/giratory.v4i2.18030

Abstract

Puri Market, which is located on Jalan Colonel Sunandar, precisely in the center of Pati Regency, is a traditional market which is the basis for the people of Pati to sell and buy all life-sustaining needs. This needs to be taken into account considering that the existence of an activity center must have as few parking areas as possible. Therefore, this study was carried out with the aim of providing recommendations for parking characteristics, parking space capacity and planning the most optimal parking layout for Puri Pati Market. Conditions are reviewed on 1 weekend and 3 weekdays. Namely Sunday, Monday, Wednesday and Thursday. From 06.00 to 12.00. The data used in this research are primary data and secondary data. The results of the research are that the characteristics of motorbike parking spaces for the Puri Pati Market area are 345 SRP which is in accordance with the 1996 Directorate General of Land Transportation standards. At Puri Pati Market There are also no entrances and exits that use electronic parking. With the existing motorbike parking space capacity of 280 SRP at Puri Pati Market, it can still meet existing parking needs. From the calculations that have been carried out, it is known that the need for motorbike parking space at Puri Pati Market is 345 SRP. In planning the parking layout using a 90º angle in the motorbike and car parking area as planned, namely being able to accommodate 280 motorbikes and 100 cars. With a comparison using an angle of 60º, we get only 152 motorbikes and 80 cars per plot.
EFEKTIVITAS PENGGUNAAN JALUR LAMBAT PADA RUAS JALAN DR. LUKMONOHADI DAN DR. RAMELAN KUDUS DI KABUPATEN KUDUS Kholil, Munawar; Fauzan, Nur Maulana; Rizani, Mohammad Debby; Yudaningrum, Farida
Jurnal Teknik Sipil Giratory UPGRIS Vol 4, No 1: Juni 2023
Publisher : Universitas PGRI Semarang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26877/giratory.v4i1.16196

Abstract

Kudus street is a national road that connects Jakarta-Semarang-Surabaya-Banyuwangi, on this north coast road as the need for mobility of goods delivery or mobility of residents between cities. On the way Dr. Lukmonohadi – Dr. Ramelan has a slow lane on the left side of the road. The purpose of the existence of the slow lane on  road  DR. Lukmonohadi-Dr. Ramelan is to smooth traffic and reduce the fatality rate of  accidents in the fast lane, but due to very high shopping and industrial activities that can interfere with performance on these roads. The purpose of this research study is to review the effectiveness of the slow lane on the Dr. Lukmonohadi-Dr. The Ramelan is working properly or not. From the results of the analysis of traffic performance measured using the degree of saturation (DS) for Road  Dr. Lukmonohadi of 0.57, while Road  Dr. Ramelan is 0.61. From the level of congestion that can be obtained from the value of the side barriers that Dr. Lukmonohadi until Dr. Ramelan is included in the medium side resistance class (M). Based on the comparison of the accident rate from 2016-2021 the number of accidents continues to increase. The recommended recommendations are that it is necessary to repair and add road facilities such as repair of separator paint, faded road markings, addition of zebra crossings in pedestrian-congested locations and asphalt repairs on slow lanes because there is a lot of asphalt that is peeling and has holes, it is very dangerous for road users crossing it. Based on the results of the analysis for the slow lane, it can be concluded that the slow lane has been effective in facilitating traffic flow to reduce the number of accidents on the fast lane.
PEMANFAATAN LIMBAH KACA SEBAGAI SUBSTITUSI SEBAGIAN AGREGAT HALUS BAHAN MATERIAL PEMBUATAN BETON Rosiyani, Tissa Rahayu; Triyani, Anis; Sintia, Sela; Yudaningrum, Farida
Jurnal Teknik Sipil Giratory UPGRIS Vol 6, No 1: Juni 2025
Publisher : Universitas PGRI Semarang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26877/giratory.v6i1.24101

Abstract

Concrete technology has increased in recent decades followed by various studies to improve concrete performance in the construction world. The research conducted is to improve the performance of building materials by considering the selection of concrete forming materials to the substitution of other materials such as replacing an aggregate with waste materials. Therefore and by considering the existence of large amounts of glass waste, it is possible to be used as an alternative solution to environmental problems around us, especially fine aggregates. The study used glass substitution as a partial replacement for fine aggregates in concrete materials. The glass variations used were 0%, 7.5%, 10%, and 12.5%. Data analysis used regression and classical assumption tests with the SPSS program with the help of SPSS 20 for Windows software. The variables used in this study were the independent variable (glass waste) and the dependent variable (compressive strength and flexural strength)
KERUGIAN BBM AKIBAT TUNDAAN DAN PANJANG ANTRIAN DI PERSIMPANGAN JALAN RAYA DENGAN REL KERETA API SEBIDANG (Studi Kasus Jalan Hasanudin Semarang) Ananda, Fina Kurnia; Yaqin, Wafi Ainul; Rizani, Mohammad Debby; Yudaningrum, Farida
Jurnal Teknik Sipil Giratory UPGRIS Vol 4, No 2: Desember 2023
Publisher : Universitas PGRI Semarang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26877/giratory.v4i2.18027

Abstract

Due to the high mobility of those passing by and the presence of trains that cross the intersection between the highway and the railroad, also known as level crossings, Jalan Hasanudin experiences heavy traffic during rush hour. Additionally, because of the large volume of train traffic at the Poncol station and the proximity of this intersection to the station, there is frequently a buildup of vehicles at the level crossing on Jalan Hasanudin. As a result, researchers will determine how Jalan Hasanudin Semarang performed. After conducting research, it was discovered that the highest vehicle queue length occurred on Monday, February 27 2023 from Jalan Hasanudin - Imam Bonjol at closing time 16.45 with a queue length of 123 meters and the highest stop delay occurred on Saturday, March 4 2023 from the direction of Jalan Hasanudin - Imam Bonjol with an average stop delay duration of 372.00 seconds. Therefore, the occurrence of long lines led to fuel losses for the drivers; their total gasoline loss over the course of the three research days was IDR 886,550.7. The researchers offer recommendations based on the findings of the research analysis to control street vendors and people near railroad tracks and railroad crossings that result in side barriers and long lines during stop delays, install traffic signs like those that prohibit stopping, prohibit parking, and prohibit raising and lowering passengers on roads, and so that there is no congestion along Jalan Hasanudin and around railroad crossings.
ANALISIS LAYANAN FASILITAS TERMINAL PENGGARON SEMARANG TERHADAP KEPUASAN PENGGUNA DENGAN METODE IMPORTANCE PERFOMANCE ANALYSIS (IPA) Navis, Ahmad Akbar; Rizani, Mohammad Debby; Yudaningrum, Farida
Jurnal Teknik Sipil Giratory UPGRIS Vol 4, No 2: Desember 2023
Publisher : Universitas PGRI Semarang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26877/giratory.v4i2.18033

Abstract

Penggaron Terminal is a type B terminal in the Pedurungan District area which serves departments such as Mangkang, Karang Ayu, Solo, Wonosobo, Kebumen, Cepu, Purwodadi, and cities or regencies within the province of Central Java. This research aims to determine the level of service at the Penggaron terminal using the importance performance analysis (IPA) method. This research was conducted at the Penggaron type-B terminal for two weeks, the first week the questionnaires were distributed to respondents on Mondays and Sundays in the morning at 07:00-10:00 WIB and in the afternoon at 16:00-18:00 WIB. This research is included in the quantitative research with a descriptive research approach. Data collection uses primary data, namely data obtained from the answers of the respondents to the questions posed by the researcher. Secondary data from literature study in the form of documents, laws and regulations, journals, scientific papers, supporting data relating to the problem under study. Based on the results of data analysis and processing using the Importance Performance Analysis (IPA) method in the Cartesian diagram, the service facilities at the Penggaron bus terminal are dominant in quadrant 2, which shows high expectations and reality, and quadrant 4, which means expectations of low use and high reality. However, there are a small number of service facilities that are in the quadrant, which means that the expectations from users are high but the reality is low. So, based on user evaluation, the service at the Penggaron terminal is quite good.
KINERJA LALU LINTAS PADA RUAS JALAN SATU ARAH (STUDI KASUS JL. SUNAN KUDUS KABUPATEN KUDUS) Paripurna, Drian; Supriyanto, Joko; Rizani, Mohammad Debby; Yudaningrum, Farida
Jurnal Teknik Sipil Giratory UPGRIS Vol 6, No 1: Juni 2025
Publisher : Universitas PGRI Semarang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26877/giratory.v6i1.24097

Abstract

The high mobility of the people and traffic due to the existence of a railroad crossing on the Mranggen road section is the main factor for the high congestion that exists on this section. The government's efforts through the Central Java Office of Public Works and Human Settlements to build the Ganefo Mranggen KM 14 Fly Over is an alternative solution to tackling the high traffic jams on this section. Therefore, researchers will identify how the performance of the Mranggen road section after the construction of the Fly Over. After conducting research, it was found that the busiest traffic was on Wednesday at 16.00-16.15 with a total flow value of 883.3 pcu/hour. The degree of saturation is 0.962 0.75, which exceeds the requirements of the 1997 MKJI guidelines. If the value of the degree of saturation 0.75 requires improvement, then the degree of saturation is included in the category E service level with conditions of very high traffic density and low volume. The highest side resistance value on this section is 906.8 where the time interval is 06.00-09.00 WIB with the VH Resistance Class (906.8 900) which means commercial area, with roadside market activity. So that alternative solutions can be found using SWOT calculations where it is known that the segment is in a position between the Weakness and Opportunity axes, namely in quadrant 4. This means that the Ganefo Mranggen Fly Over segment is advised to change the strategy from internal Weaknesses So that the strategy is changed to Opportunity ( external Opportunity) in order to achieve good traffic performance on the Ganefo Mranggen Km 14 Fly Over section.
ANALISA KERUSAKAN RUAS JALAN RAYA SEMARANG BOJA (Studi Kasus Pasar Jrakah – SPBU BSB) Fikri, Fajar Ikhsanul; Rizani, Mohammad Debby; Yudaningrum, Farida
Jurnal Teknik Sipil Giratory UPGRIS Vol 5, No 1: Juni 2024
Publisher : Universitas PGRI Semarang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26877/giratory.v1i1.19455

Abstract

The dense of traffic volume resulted in road damage on the Semarang Boja highway section to be precise at KM 8 – KM 14 Semarang Boja. Overcrowding and excessive tonnage are also factors in road damage in the area. The purpose of this study was to determine the LHR on Semarang Boja highway, the effect of vehicle volume on the level of damage to Jalan Raya Semarang Boja.. This research method is quantitative. The quantitative method is a method of collecting some data with primary data, namely direct surveys in the field and secondary data needed in this study. Based on the results of the analysis, the average daily traffic (LHR) on the northbound road was 1949.57 pcu/hour and on the southbound road was 1872.83 pcu/hour classified as heavy traffic. The degree of saturation (DS) value based on traffic volume 0.75 is 6.30 in morning conditions, 2.99 in afternoon conditions, 3.77 in afternoon conditions with a very saturated category