Claim Missing Document
Check
Articles

Found 3 Documents
Search
Journal : Journal of Industrial and Engineering System

Analisa Risiko Postur Tubuh Pekerja dengan Metode NBM, REBA dan RULA di Unit Usaha Jamur Tiram Putih Fungo Pride Andi Turseno; Gita Marcaesa
Journal of Industrial and Engineering System Vol. 2 No. 2 (2021): Desember 2021
Publisher : Program Studi Teknik Industri, Fakultas Teknik, Universitas Bhayangkara Jakarta Raya

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Fungo Pride adalah unit usaha yang bergerak dalam bidang budidaya jamur tiram putih. Kondisi lingkungan dan stasiun kerja yang belum baik tentunya menciptakan lingkungan kerja yang kurang nyaman, tidak aman, tidak sehat dan tidak efisien. Sehingga dari kondisi stasiun kerja tersebut dapat menurunkan kinerja dan menimbulkan risiko. Penelitian ini bertujuan untuk menganalisa resiko kerja pada Unit Usaha Fungo Pride yang terkait dengan posisi kerja yang tidak ergonomis dengan menggunakan metode NBM, REBA & RULA. Dari hasil penelitian ini didapatkan bahwa dengan analisa NBM didapatkan 50% risiko rendah dan 50% risiko sedang. Untuk analisa REBA didapatkan risiko kerja pada karyawan dalam kategori sangat tinggi dengan final skor REBA 13 sehingga membutuhkan tindakan korektif sesegera mungkin. Dan berdasarkan analisa RULA didapatkan hasil dalam kategori sangat tinggi yaitu grand score RULA 8 sehingga perlu adannya investigasi dan perbaikan secepat mungkin. Dengan adanya hasil penelitian tersebut diharapkan akan ada penelitian lanjutan yang membahas terkait factor ergonomi dengan produktivitas pada unit usaha budidaya jamur tiram.
Analisa Risiko Postur Tubuh Pekerja dengan Metode NBM, REBA dan RULA di Unit Usaha Jamur Tiram Putih Fungo Pride turseno, andi; Marcaesa, Gita
Journal of Industrial and Engineering System Vol. 2 No. 2 (2021): Desember 2021
Publisher : Program Studi Teknik Industri, Fakultas Teknik, Universitas Bhayangkara Jakarta Raya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31599/rj145q36

Abstract

Fungo Pride is a business unit engaged in the cultivation of white oyster mushrooms. Unhealthy environmental conditions and work stations certainly create a work environment that is less comfortable, unsafe, unhealthy and inefficient. So that the condition of the work station can reduce performance and cause risks. This study aims to analyze the work risks of the Fungo Pride Business Unit associated with non-ergonomic work positions using the NBM, REBA & RULA methods. From the results of this study, it was found that the NBM analysis found 50% low risk and 50% moderate risk. For REBA analysis, it is found that the work risk of employees is in a very high category with a final REBA score of 13 so it requires corrective action as soon as possible. And based on the RULA analysis, the results were in the very high category, namely the grand score of RULA 8, so it is necessary to have an investigation and repair as soon as possible. With the results of these studies, it is hoped that there will be further research that discusses ergonomic factors with productivity in the oyster mushroom cultivation business unit.
Optimalisasi Durasi Pelaksanaan Proyek Pembangunan Distribusi Jaringan Pipa Perumahan Menggunakan Critical Path Method Tanisri, Roberta Heni Anggit; Salsabila, Lutfi Rizky; Turseno, Andi; Nugroho, Oki Widhi; Pribadi, Agustinus Yunan
Journal of Industrial and Engineering System Vol. 6 No. 1 (2025): Juni 2025
Publisher : Program Studi Teknik Industri, Fakultas Teknik, Universitas Bhayangkara Jakarta Raya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31599/n98jhp51

Abstract

PT MUTP merupakan perusahaan yang bergerak di bidang jasa konstruksi pembangunan jalur distribusi jaringan pipa. Pada proses pelaksanaan proyek di Perumahan Puri Persada Cibarusah terjadi keterlambatan penyelesaian proyek dari jadwal perencanaan yang telah dibuat. Hal tersebut mengakibatkan penambahan durasi waktu penyelesaian proyek tersebut. Penelitian ini bertujuan untuk menentukan jalur kritis pada proyek pembangunan distribusi jaringan pipa dengan menggunakan metode critical path method (CPM). CPM merupakan salah satu metode dalam manajemen proyek yang memprioritaskan peluang waktu sebagai obyek yang akan dianalisa. Hasil dari penelitian ini terdapat sembilan jalur kritis yaitu pada aktivitas A-C-D-F-H-I-J-K-L. Adapun faktor penyebab lain terjadinya keterlambatan adalah faktor lingkungan dan cuaca, faktor para pekerja yang kurang disiplin, serta faktor dari beberapa peralatan dan permesinan yang sudah berusia cukup tua, sehingga sering terjadi kerusakan.