Analisis Percepatan Durasi Proyek Dengan Menggunakan Metode Crashing Pramana, I Dewa Made Agung; Siregar, Amril Ma'ruf; Herianto, Dwi
Jurnal Rekayasa Sipil dan Desain Vol. 8 No. 2 (2020): Edisi Juni 2020
Publisher : Universitas Lampung

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.23960/jrsdd.v8i2.1354

Abstract

There are possible problems arise during construction of project that can cause delays. Delays can cause losses in the form of fines, overhead costs, additional salaries and rental tools and other. To overcome the problems, there are some ways to achieve project completion in due time. The purpose of this study was to analyze the acceleration of the project duration by utilizing crashing method and its impact on project cost. The object of the case study was the construction of Lampung Regional Police Headquarter. The scenario utilized was increased the number of workers by 35% and the added working hours by four hours. The results show by increasing the number of workers across eleven project activities, the project duration was crashed to 252 days or two days earlier than the scheduled time and the project cost was decrease to Rp. 23,964,647,646.00 or 0.908% lower than the scheduled cost. The results also show by adding four more working hours across ten project activities, the project duration was crashed to 253 days or one day earlier than the scheduled time and the project cost was decreased to Rp. 23,995,417,215.00 or 0.781% lower than the scheduled budget. Keywords: Project Acceleration, Crashing method, increase of the number of workers, the addition of working hours
Analisis Hubungan Antara Volume,Kecepatan Dan Kepadatan Terhadap Jalan Perkotaan Studi Kasus Jalan Zainal Abidin Pagar Alam Bandar Lampung Juliend m, Andya Firgi; Herianto, Dwi; Putra, Sasana
Jurnal Rekayasa Sipil dan Desain Vol. 8 No. 3 (2020): Edisi September 2020
Publisher : Universitas Lampung

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.23960/jrsdd.v8i3.1457

Abstract

AbstrakPerkembangan transportasi yang pesat pasti selalu muncul permasalahan lalu lintas yang kompleks dalam sarana dan prasarana transportasi, terutama pada transportasi perkotaan. Tujuan dari penelitian ini untuk menganalisis karakteristik jalan dan mengetahui hubungan antara volume, kecepatan dan kepadatan pada jalan perkotaan yang ada di Bandar Lampung jalan Zainal Abidin Pagar Alam.Penelitian ini menggunakan model Greenshield sebagai metodenya. Metode ini mendapatkan hasil bahwa hubungan antara kecepatan dan kepadatan bersifat linier sehinggadapat melihat bagaimana pola hubungan antara kecepatan, kepadatan dan volume.Hasil dari penelitian ini didapat volume arus lalu lintas puncak terjadi pada pagi dan sore hari sebesar 15528,75 smp/jam arah menuju unila dan 1313,06 smp/jam menuju kedaton pada pagi hari. Kecepatan lalu lintas tertinggi terjadi pada pagi dan sore hari sebesar 22,25 km/jam menuju arah unila dan 28,29 km/jam menuju arah kedaton dan kepadatan lalu lintas tertinggi terjadi pada pagi dan sore hari yaitu sebesar 617,09 smp/km menuju arah kedaton dan 752,91 smp/km menuju arah unila pada pagi hari. Kata kunci:Greenshield;JalanPerkotaan;Hubungan Volume 
Stabilitas Campuran Aspal Berbahan Dasar Reclaimed Asphalt Pavement (RAP) Akrom, Fatra Hariz; Putra, Sasana; Herianto, Dwi
Jurnal Rekayasa Sipil dan Desain Vol. 8 No. 3 (2020): Edisi September 2020
Publisher : Universitas Lampung

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.23960/jrsdd.v8i3.1495

Abstract

Metode penanganan kerusakan perkerasan jalan dapat dilakukan dengan prinsip greenroads, yaitu menggunakan material yang didaur ulang (recycle) yang bisa didapat dari hasil pengerukan atau pembongkaran lapis perkerasan jalan yang telah mengalami kerusakan atau RAP (Reclaimed Asphalt Pavement). Namun perlu dilakukan pengujian kembali untuk meninjau parameter marshall pada campuran aspal berbahan dasar RAP, mengingat material tersebut merupakan bahan daur ulang yang telah mengalami penurunan kekuatan. Hasil penelitian ini diperoleh nilai IKSbenda uji campuran AC-WC dengan persentase RAP 25%, 50%, 75% menggunakan KAO berturut-turut 5,8%, 5,6%, dan 5,4% sebesar 96,63%, 91,82%, dan 86, 27%. hal ini menunjukkan nilai IKS pada campuran RAP 25% dan 50% memenuhi persyaratan yang disyaratkan Bina Marga yaitu sebesar 90%, sedangkan RAP 75% tidak memenuhi standar.
Evaluasi Tata Guna Lahan Parkir Hotel Santika Bandar Lampung Gadwina, Ayura; Putra, Sasana; Herianto, Dwi
Jurnal Rekayasa Sipil dan Desain Vol. 8 No. 3 (2020): Edisi September 2020
Publisher : Universitas Lampung

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.23960/jrsdd.v8i3.1505

Abstract

Dampak dari perkembangan kota membuat pembangunan infrastruktur penunjang pun sudah terlihat,sepertiinfrastruktursepertihoteldanjalanmenujulokasiwisatapunsudahdiperbaiki serta diperlebar. Dari pembangunan tersebut memunculkan kebutuhan terhadap sarana ruang parkir yang memadai untuk menghindari kemacetan lalu lintas. Parkir merupakan keadaan tidak bergerak suatu kendaraan yang bersifat sementara. Salah satu bentuk kebutuhan parkir yaitu yang ada di Hotel Santika Bandar Lampung. Namun karena hotel yang berdekatan dengan jalan raya sehinggaperludiketahuiapakahlahanparkiryangdisediakanmampumenampungkendaraan parkir sehingga tidak menyebabkan kemacetan lalu lintas.  TujuandaripenelitianiniadalahuntukmenghitungkecukupanruangparkirpadaHotelSantika Bandar Lampung.  Hasil dari penelitian ini yaitu jumlah ruang parkir yang disediakan pihak Hotel Santika Bandar Lampung masih mengalami kekurangan, yaitu dari yang diperlukan sebanyak 54 SRP sedangkan yangtersediahanya18SRP.Keterbatasanlahandidugamenjadipenyebab kekuranganlahan parkir untuk kebutuhan ruang parkir di Hotel Santika Bandar Lampung.
Pengaruh Hambatan Samping Terhadap Kapasitas Jalan (Studi Kasus Jalan Imam Bonjol dan Jalan R.A Kartini Bandar Lampung Destriana, Revina; Karami, Muhammad; Herianto, Dwi
Jurnal Rekayasa Sipil dan Desain Vol. 8 No. 4 (2020): Edisi Desember 2020
Publisher : Universitas Lampung

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.23960/jrsdd.v8i4.1568

Abstract

 The existence of roads is a tool to serve the movement of activities in urban areas. The problems that occur on the Jl. Imam Bonjol and Jl. RA Kartini is the number of vehicles that carry out activities in and out on the left and right of the road, the slow flow of vehicles, pedestrians, and the number of people who make buying and selling transactions on the right and left sides of the road which causes congestion and queues of vehicles that result in the road section is not functioning properly, namely as the main road in the city of Bandar Lampung. For this reason, it is necessary to analyze the effect of side barriers on the capacity of these roads.The purpose of this study is to identify the effect of side barriers on road capacity, the volume of vehicles on Imam Bonjol and RA Kartini roads and the difference in travel time required on the Imam Bonjol and RA Kartini roads in the morning and evening. To achieve a goal, the target is What is done is expected to be able to help the proper handling of road performance improvement and to determine the magnitude of the influence of side friction factors on the capacity of roads that occur in urban areas, especially Imam Bonjol and RA Kartini roads. And the method used in this study usesGuidelines for Indonesia's Road Capacity (PKJI) 2014.The output obtained from the research is the very high effect of side friction (ST) on the Imam Bonjol and RA Kartini roads resulting in a decrease in capacity, namely the Imam Bonjol road has decreased capacity by 27.73% and the RA Kartini section has decreased capacity. amounted to 26.27%. From the results of the survey conducted, it was found that the volume of heavy traffic affected the value of the capacity on the roads of Imam Bonjol and RA Kartini along 200 meters respectively.It was found that the effect of very high side friction (ST) resulted in an increase in travel time, namely on roads. Imam Bonjol the travel time needed is 3 minutes 10 seconds (3.78 km / hour) and on the RA Kartini road section it is 57 seconds (12.63 km / hour).Keywords : Side Obstacles, Traffic jam, time and capacity.    
Study of The Access Performance of Airport Toll Road on Trans Sumatera Toll Road Bakauheni – Terbanggi Besar (Case Study: Intersection of Natar Toll Road) Rahmadini, Mustika; Purba, Aleksander; Herianto, Dwi
Jurnal Rekayasa Sipil dan Desain Vol. 8 No. 4 (2020): Edisi Desember 2020
Publisher : Universitas Lampung

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.23960/jrsdd.v8i4.1611

Abstract

The construction of the Trans Sumatra Toll Road provides convenience for the public. The distance from the Natar Toll Gate to the intersection of the Lintas Sumatera Road, which is 2,5 km will interfere with toll performance at the peak of holidays if it is not properly regulated. Therefore, it is necessary to do reaserch to determine the performance of toll roads at the Exit of Natar Toll, to know the performance of roads outside the city on Jalan Branti Raya and to find out the performance of signalized intersections at the Natar Toll Exit Intersection. This reaserch use the 2014 Indonesian Road Capacity Guidelines (PKJI) method. The results show that the performance of the toll road at the Natar Toll Exit was still adequate with degree of saturation with direction 1 is 0,09 and direction 2 is 0,13. The performance of roads outside the city on Jalan Branti Raya  was still adequate with degree of saturation with direction 1 is 0,47 and direction 2 is 0,43. The performance of the signalized intersection at the Natar Toll Exit Intersection is almost saturated with the degree of saturation the south approach is 0.67; the east approach is 0.08 and the north approach is 0.82. The queue for the south approach is 30 meters; the east approach is 2 meters and the north approach is 84 meters. The average delay of the intersection is 25 seconds /skr. To improve the performance of the Natar Toll Exit Intersection, it is necessary to rearrange the green time at this intersection.
Analisis Nilai Waktu Kendaraan Pribadi (Mobil dan Motor) Di Kota Bandar Lampung Dengan Metode Regresi Linear (Studi Kasus : Jalan Kartini) siburian, Parsaulian; Sulistyorini, Rahayu; Herianto, Dwi
Jurnal Rekayasa Sipil dan Desain Vol. 9 No. 1 (2021): Edisi Maret 2021
Publisher : Universitas Lampung

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.23960/jrsdd.v9i1.1642

Abstract

The value of travel time is the amount of money a person can spend to save a unit of travel time. Loss of travel time is a form of losses in terms of cost and time experienced by road users. This research is conducted at Kartini Street, Bandar Lampung. The purpose of this study is to obtain the value of travel time for car and motorbike users using the linear regression method processed with SPSS. The dependent variable is the cost per length of trip. The independent variables are the lengths, the costs, and the distance of the trip, as well as the socio-economic data of the respondents, namely gender, age, occupation and income. Based on the results of the processing, it is found that the independent variables that have a significant effect on the value of travel time at the research location are age, income, travel time and travel costs. By distributing the mode value of the survey data into the regression equation, the value of travel time on Kartini street for private car drivers is Rp. 25,452.24 / hour and for motorbike riders is Rp. 14,527.26 / hour. Keywords: travel time value, private vehicle, linear regression
Feasibility Study of Flyover Project on R.A. Basyid Street – Untung Suropati Reviewed in Terms of Traffic and Economic Engineering Hutagalung, Alfrido; Sulistyorini, Rahayu; Herianto, Dwi
Jurnal Rekayasa Sipil dan Desain Vol. 9 No. 2 (2021): Edisi Juni 2021
Publisher : Universitas Lampung

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.23960/jrsdd.v9i2.1813

Abstract

AbstractTraffic jam is a problem that always exists as an area develops, especially at the Untung Suropati intersection in Bandarlampung City. To solve the problem, a fly over is built and a feasibility study is needed.Feasibility studies conducted are reviewed in terms of traffic performance using pkji method. In terms of economy, it is reviewed from BCR and NPV parameters by analyzing saving of vehicle operating costs variables and Vehicle Travel Time Value.With the development, the degree of saturation for the direction of Labuhan Dalam – Labuhan Ratu decreased from 0.57 to 0.32, for the direction of Labuhan Ratu – Labuhan Dalam reduced from 0.66 to 0.32, for way Halim – Rajabasa reduced from 0.80 to 0.41 and for rajabasa direction – Way Halim reduced from 0.82 to 0.46 so it is said to be feasible in terms of traffic performance. In terms of economy obtained bcr value is 10,059 and NPV is Rp 398,062,846,073.96. So in terms of economics it is said to be feasible.Keywords: Feasibility, Flyover, Traffic jam
Analisis Dampak Terminal Bayangan Terhadap Kinerja Lalu Lintas di Bundaran Tugu Radin Intan Rajabasa Ruas Jalan Soekarno Hatta - Natar Heriadi, Riyan; Herianto, Dwi; Sulistyorini, Rahayu
Jurnal Rekayasa Sipil dan Desain Vol. 9 No. 3 (2021): Edisi September 2021
Publisher : Universitas Lampung

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.23960/jrsdd.v9i3.1900

Abstract

The impact of the shadow terminal has caused the congestion and the unrest for road users. This is due to side obstructions caused by pedestrians, buses, cars, and other transportation waiting and picking up passengers around the road, resulting in buildup around the shadow terminal. As a result of the accumulation around the shadow terminal, it caused traffic jams on the Soekarno Hatta - Natar road. In connection with the above problems, it is necessary to study the impact of the shadow terminal on the Soekarno Hatta - Natar road section which can then be compared with the performance of the Soekarno Hatta - Natar road in the absence of a shadow terminal, in order to find out how much traffic performance changes on Soekarno Hatta road - Natar due to the shadow terminal. Thus, this study aims to determine the performance of the Soekarno Hatta - Natar road when there is a shadow terminal and when there is no shadow terminal. The results of this study indicate that there is a change in the value of the side friction in the condition of the shadow terminal on Monday with an event weight of 314 events with a side drag in the absence of a shadow terminal of 213 events. The difference in the value of the side friction will result in a decrease in the value of road capacity, degree of saturation and level of road services. Key words : Road Performance, Side Obstructions, Degree of Saturation, Capacity, Level of Service.
Analisis Solusi Kemacetan pada Simpang Sebidang Kereta Api Jalan Urip Sumoharjo Hutapea, Raditya Eros Witantra; Herianto, Dwi; Siregar, Amril Ma'ruf
Jurnal Rekayasa Sipil dan Desain Vol. 9 No. 3 (2021): Edisi September 2021
Publisher : Universitas Lampung

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.23960/jrsdd.v9i3.1913

Abstract

The high frequency of the Babaranjang train track causes congestion problems on the Urip Sumoharjo road which is caused by road closures when the train passes. The impact of the closure caused long queues of vehicles to block Padjajaran and Kimaja roads. In this study, it discusses the causes of congestion in the vehicle movement that is not smooth, especially on the Simpang Urip Sumoharjo road. Then compare the road capacity and the degree of saturation of the Urip Sumoharjo road under normal conditions and the conditions when the Babaranjang train passes, and analyze the structural concept to overcome congestion at the Urip Sumoharjo crossing.Analyze the comparison between Flyover and Underpass using the Scoring Zero One method. The results of the analysis show that to overcome congestion on Jalan Urip Sumoharjo it is more effective to build an underpass with a score of 60% while the flyover building gets a score of 40%. With the cross-normal degree of saturation, the result is 0.711. As for the results of saturation after the train passed the result was 1.56. And the calculation results show that the existence of an underpass can reduce congestion on Jalan Urip Sumoharjo by 45.58%.Keywords: Railroad latch, Degree of Saturation, Scoring Zero One method
Co-Authors ADITYA NUGRAHA Agustian, Joni Akrom, Fatra Hariz Alekasnder Purba Aleksander Purba Alexsander Purba Alfina Dwi Putri Alfrido Hutagalung ALl-fathoni, Alexander Damira Amril Ma'ruf Siregar andya firgi juliend m Antonius Situmorang Apis Prada Ramadhan Arengga Vinata Arif, Muhammad Isfan Arya Nugraha Asmaul Latifah ayura gadwina Azhar, Rizqi Febriansyah Bima Depati Pratama Bralinza, Chelpa Rideanda Dalius, Miftahul Fauzan Deni Purwadi Destriana, Revina Dinda Oktarina Harahap Dzulhadi, Rahmad Elfrida Ratnawati Elida Purba Fatra Hariz Akrom Fauzi, Laka Ardhillah Febrian Andrey Wirawan Frans Hasiholan Tanjung Gadwina, Ayura Hamzah, Budi Harahap, Ananda Wirawan Tritama Harahap, Dinda Oktarina Havis, Muhammad Al Heriadi, Riyan Hermida, Lilis hilda trianda walimuda Hutagalung, Alfrido Hutapea, Raditya Eros Witantra I Dewa Made Agung Pramana I Wayan Diana Idharmahadi Adha indralam, febriansyah Janatilla, Annisa Wansya Jannah, Faizatul Juliend m, Andya Firgi Junaedi, Tas'an karami, muhammad Kholbuniah, Megalensi Kusuma, I Gusti Made Ferdi Laedo Gustiaji Laksono, Bambang Tri M. Abi Berkah Nadi Maulana Rendri Yuda Megalensi Kholbuniah Muhammad Agung Setia Darma Muhammad Al Havis Muhammad Farhan Muhammad Irvan muhammad vareza pratama Mulya Putri Ofrial, Siti Anugrah Mulya, Siti Mustika Rahmadini naufal habibi Naura Salsabila Novendra, Muhammad Rafly Ofrial, Siti Anughrah Mulya Putri Ofrial, Siti Anugrah M. P. Ofrial, Siti Anugrah Mulya Putri Oldebes Temy Giantara Pramana, I Dewa Made Agung Pratama, Bima Depati Pratama, Muhammad Vareza Pratama, Rachmatia Agung Priangga, Musabiq Ahkmadi Priyo Pratomo Purba, Alexsander Purwadi, Deni Putra, Fanky Arya Putri Ajeng Prameswari Putri Ofrial, Siti Anugrah Putri Ofrial, Siti Anugrah Mulya Putri, Alfina Dwi ra, arif rahman Raditya Eros Witantra Hutapea Rahayu Sulistiyorini Rahayu Sulistyorini Rahayu Sulistyorini Rahmad Dzulhadi Rahmadini, Mustika Rahmaputri, Alya Samira Randy Syaputra reni sari Riani, Nurul Okta Rindri Mutohir Ririk, Alis Riyan Heriadi rizca sutra ayu Royadji Darma Salsabila, Naura Sampurna, Muhammad Fatwa Putra Santiti, Hana Vera Santoso, Muhammad Bagus Sari, Yulianti Dewi Manda Sarkis Enda Raya S Sasana Putra Sasana Putra, Sasana Sembada, M. Arif Yoga siburian, Parsaulian Silmi, Safinah Siregar, Amril Ma'ruf Siti Anugrah Mulya Putri Ofrial Siti Mulya Sulistiyorini, Rahayu Sulstyorini, Rahayu Suryatama, Noval Syukur Sebayang TALITHA, YOLANDA SEPTIANI Triafini Noviarti walimuda, hilda trianda Yoga Kartiwi, Diana Williani Yoga Tryas Pratama Yogi Alexander Yohanes Martono Hadi Yunise, Karmaniar Yuntares Putri Nawang Sari Zillie, Muhammad Febry