STUDI EVALUASI SISTEM PENGKONDISIAN UDARA DI JURUSAN TEKNIK ELEKTRO KAMPUS BUKIT JIMBARAN DENGAN MENGGUNAKAN SOFTWARE M. N. Hanifan; I.G.D Arjana; W. Setiawan
Jurnal SPEKTRUM Vol 2 No 2 (2015): Jurnal SPEKTRUM
Publisher : Program Studi Teknik Elektro UNUD

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (202.359 KB)

Abstract

Pada gedung Jurusan Teknik Elektro Fakultas Teknik Universitas Udayana, banyak menggunakan energi listrik untuk berbagai sarana dalam memberi kenyamanan bagi mahasiswa maupun staff. Salah satu usaha dalam memberi kenyamanan tersebut adalah dengan memasang sistem pengkondisian udara. Karena banyaknya ruangan yang menggunakan sistem pengkondisian udara, maka diperlukan evaluasi pada kapasitas sistem pengkondisian udara tersebut sehingga dapat diketahui kondisi besar kapasitas AC terpasang. Pemakaian software dalam penghitungan akan sangat membantu kecepatan dalam penghitungan kapasitas sistem pengkondisian udara yang dibuat dengan menggunakan Microsoft Visual Studio. Selain itu evaluasi dilakukan pada penggunaan timer pada gedung DH karena timer pada gedung DH sudah tidak bekerja dengan baik dan waktu operasi AC belum efektif. Pada hasil perhitungan terdapat 18 ruangan dimana kapasitas AC terpasang kurang dari hasil perhitungan dan 3 ruangan kapasitas AC terpasang melebihi hasil perhitungan. Hal ini disebabkan penghitungan kapasitas AC terpasang belum menambahkan faktor penambahan kalor dari luar dan dari dalam ruangan. Evaluasi kinerja timer yang dilakukan pada gedung DH yaitu dengan mengevaluasi waktu operasi AC dimana kerja AC sebelumnya 8 jam waktu operasi selama 7 hari dikurangi menjadi 8 jam selama 5 hari karena pada hari sabtu dan minggu merupakan hari libur kuliah sehingga konsumsi energi listrik berkurang sebesar 580,34 kWh/minggu
PERENCANAAN SETTING DIRECTIONAL GROUND RELAY (DGR) UNTUK GANGGUAN SATU FASA KE TANAH DI SALURAN 150 KV DOUBLE CIRCUIT GIS PESANGGARAN – GI NUSA DUA Ganggas B Maulana Idham; I Gede Dyana Arjana; I Wayan Arta Wijaya
Jurnal SPEKTRUM Vol 8 No 4 (2021): Jurnal SPEKTRUM
Publisher : Program Studi Teknik Elektro UNUD

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (537.593 KB) | DOI: 10.24843/SPEKTRUM.2021.v08.i04.p13

Abstract

The single phase to ground fault on the 150 kV transmission line GIS Pesanggaran –Nusa Dua Substation has a high fault impedance so that the distance relay as anauxiliary safety device cannot detect the disturbance. Directional Ground Relay (DGR)was chosen as an auxiliary protection relay to secure the system from single phase toground faults. Installation of auxiliary protection relays requires planning and relaysetting steps to obtain Iset, TMS and trip time. The calculations that have been carriedout get the results of DGR setting with a pickup current range of 0.0522 – 0.0722 A.DGR will work after 2.297 seconds if the differential relay as the main protection relaydoes not work or fails and the distance relay as a backup protection does not succeed insecuring a single phase fault to ground as well.
STUDI TERHADAP KONSERVASI ENERGI PADA GEDUNG SEWAKA DHARMA KOTA DENPASAR YANG MENERAPKAN KONSEP GREEN BUILDING I Wayan Swi Putra; I Nyoman Satya Kumara; I Gede Dyana Arjana
Jurnal SPEKTRUM Vol 2 No 4 (2015): Jurnal SPEKTRUM
Publisher : Program Studi Teknik Elektro UNUD

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (316.24 KB)

Abstract

Gedung Sewaka Dharma Kota Denpasar dibangun dengan konsep desain green building. Dengan konsep desain green building, gedung Sewaka Dharma diharapkan mampu menghemat energi di dalam pengoperasiannya. Konsep desain green building yang diterapkan antara lain, gedung dibuat dengan banyak jendela kaca, memakai sistem ventilasi vertikal, lingkungan di dalam dan di luar gedung yang hijau serta pemakaian solar sel untuk lampu penerangan luar dalam mengurangi konsumsi energi. Dari hasil studi yang dilakukan ada perbedaan antara perencanaan dan realisasi dalam pembangunannya. Suhu dan kelembaban yang tinggi mengakibatkan terjadinya pemasangan AC di masing-masing ruangan. Suhu dan kelembaban yang tinggi diakibatkan karena tidak berjalannya sistem ventilasi alami pada gedung tersebut. Hal ini mengindikasikan bahwa konsep green building yang diterapkan pada gedung Sewaka Dharma tidak mampu menciptakan lingkungan kerja yang nyaman bagi pegawainya.
ANALISIS KETIDAKSEIMBANGAN BEBAN DAN HARMONISA PADA TRANSFORMATOR DISTRIBUSI MI 0096 PENYULANG ABIANBASE I Wayan Yoga Prasetya; I Nyoman Setiawan; I Gede Dyana Arjana
Jurnal SPEKTRUM Vol 7 No 1 (2020): Jurnal SPEKTRUM
Publisher : Program Studi Teknik Elektro UNUD

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (312.977 KB) | DOI: 10.24843/SPEKTRUM.2020.v07.i01.p16

Abstract

MI 0096 Distribution Transformer is one of the transformers supplied by Abianbase Feeders.The MI 0096 distribution transformer has a capacity of 100 kVA with a daytime load of 48,5 kVA and a nighttime load of 50,81 kVA. Unequal single-load loads on the transformer result in unbalanced loads on the transformer MI 0096 and the use of non-linear loads results in harmonic distortion on the transformer MI 0096. In this study, carried out a comparison of load imbalance and harmonics that occur during the day and night.The results of the analysis found that the percentage of load imbalance in the MI 0096Distribution Transformer is classified in poor condition that exceeds 25% with the percentage of load imbalances during the daytime at 28,74% and at noon 30,28%. THDv on the MI 0096 Transformer is within the allowable limit of below 5% with THDv at 1,7% during the day and 1,9% at night. THDi in the MI 0096 Distribution Transformer exceeds the allowable standard which exceeds 8%, with THDi during the day 17,5% and at night 24%. Losses caused by the THDi in the MI 0096 transformer have increased along with the increase in THDi in the transformer. Losses without THDi are 0,5 kW, whiletotal losses after being affected by THDi are 5,79 kW during the day and 11,01 kW at night.
STUDI PERBANDINGAN KEANDALAN SISTEM DISTRIBUSI 20 KV MENGGUNAKAN METODE SECTION TECHNIQUE DAN RNEA PADA PENYULANG RENON I. N. Partawan; I. G. Dyana Arjana; A. I. Weking
Jurnal SPEKTRUM Vol 1 No 1 (2014): Jurnal SPEKTRUM
Publisher : Program Studi Teknik Elektro UNUD

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (1443.564 KB)

Abstract

Ada beberapa teknik yang digunakan untuk melakukan analisis keandalan sistem distribusi jaringan distribusi 20 kV yaitu, metode Section Technique dan metode Realibility Network Equivalent Approach (RNEA). Pertambahan jumlah pelanggan penyulang Renon dalam setahun dari tahun 2012 sampai 2013 sebanyak 477 pelanggan menyebabkan peningkatan kebutuhan akan energi listrik. Meningkatnya kebutuhan akan energi listrik, menuntut suatu sistem tenaga listrik yang mempunyai keandalan dalam penyediaan dan penyaluran dayanya pada suatu jaringan distribusi. Penelitian ini bertujuan untuk menganalisis perbedaan perhitungan keandalan menggunakan metode section technique dan RNEA yang akan dibandingkan Electrical Transient Analisys Program (ETAP) Powerstation sebagai referensi. Hasil yang diperoleh setelah dilakukan analisis yaitu hasil perhitungan keandalan jaringan penyulang Renon dengan menggunakan ETAP Powerstation diperoleh System Average Interruption Frequency Index (SAIFI) sebesar 0.66 kali/pelanggan/tahun dan System Average Interruption Duration Index (SAIDI) sebesar 2 jam/pelanggan/tahun. Perhitungan menggunakan metode Section Technique SAIFI sebesar 0.56 kali/pelanggan/tahun nilai SAIDI sebesar 1.61 jam/pelanggan/tahun. Perhitungan menggunakan metode RNEA nilai SAIFI sebesar 1.3 kali/pelanggan/tahun dan SAIDI sebesar 1.12 jam/pelanggan/tahun. Nilai perhitungan dengan menggunakan program ETAP Powerstation sebagai referensi. Persentase tingkat ketelitian metode RNEA dan ETAP Powerstation untuk nilai SAIFI sebesar 96 % dan SAIDI sebesar 44 %.Persentase perhitungan dengan RNEA hasilnya cukup jauh dari program ETAP karena dilakukan penyederhanaan jaringan dan dalam perhitungan banyak hal-hal yang diabaikan.Persentase tingkat ketelitian metode RNEA dan ETAP untuk nilai SAIFI sebesar 14 % dan SAIDI sebesar 19%. Persentase perhitungan dengan metode section technique hasil perhitungan mendekati program ETAP karena data-data yang digunakan pada metode section technique dan ETAP hampir sama.
PERANCANGAN SISTEM PENGAMAN BUSBAR 150 KV MENGGUNAKAN RELE DIFERENSIAL DI GARDU INDUK SANUR Ahmad Fauzi; Gede Dyana Arjana; Cok Gede Indra Partha
Jurnal SPEKTRUM Vol 7 No 2 (2020): Jurnal SPEKTRUM
Publisher : Program Studi Teknik Elektro UNUD

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (568.317 KB) | DOI: 10.24843/SPEKTRUM.2020.v07.i02.p13

Abstract

Sanur substation has an important role to fulfill electricity consumption in the Sanurarea and parts of the city of Denpasar. Bursbar is very important part of the performance of asubstation. failures that occur on the busbar can result in widespread blackouts that disrupt thecontinuity of the flow of electric power. A sensitive, selective and fast busbar protection systemis needed to prevent widespread blackouts. This research is designed to design dual 150 kVbusbar protection using differential relays. The power flow and short circuit current in Sanursubstation in this study were analyzed using simulation of load flow and short circuit withcomputer software. Current calculation as the basis for designing and setting differential relaysettings as busbar protection is carried out by the Merz price calculating current method, allcurrents entering and leaving the secured equipment, compared to each other. The busbarprotection system using differential relays was successfully designed with a pick up currentsetting of 0.88 A for busbar A and 1.046 A for busbar B, as well as breakpoints 6 A, slope1;30%, slope2; 135%, and zero seconds working time for both relays the. The differential relaydesigned is able to isolate busbar failures more sensitive, more selective, and faster with aclearing time of 0.035 seconds compared to the existing condition protection system with aclearing time of 1.185 seconds.
PERENCANAAN SISTEM TATA UDARA RUANG OPERASI DI RUMAH SAKIT IBU DAN ANAK PURI BUNDA TABANAN BALI I Gusti Ngurah Kade Suwiherawan; I Gede Dyana Arjana; Cok Gede Indra Partha
Jurnal SPEKTRUM Vol 8 No 1 (2021): Jurnal SPEKTRUM
Publisher : Program Studi Teknik Elektro UNUD

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (334.154 KB) | DOI: 10.24843/SPEKTRUM.2021.v08.i01.p33

Abstract

The Puri Bunda Mother and Child Hospital in Denpasar opened a new branch inTabanan. The operating room is one of the focuses in realizing patient safety-oriented services.The government with PMK No. 24 of 2016 and Technical Guidelines for Hospital Infrastructurefor Air System Installation Systems in 2012 requires operating rooms to meet requirements suchas: room temperature ranges from 20ºC - 24ºC, humidity 40% - 60%, equipped with HEPA filterwith 99.97% efficiency, positive pressure of 15 pascal to the surrounding space, and equippedwith a clean air exchange system. the result research and calculations in planning theoperating room air conditioning system at the Puri Bunda Tabanan Mother and Child Hospitalaccording to the standards obtained a split duct capacity of 60,000 btu / h, a heater of 7KW, aBooster fan of 1900 CFM, a HEPA filter of 120cm x 80cm. 2 units for each room, 42cm x 42cmducting inlet outlet, 20cm x 25cm RAG and FAG ducting, 380 CFM exhaust fan.
PERENCANAAN PENAMBAHAN RELAY DIRECTIONAL EARTH FAULT (DEF) UNTUK GANGGUAN SATU FASA KE TANAH DI SALURAN 150 KV GARDU INDUK NUSA DUA – PESANGGARAN G. A. P. Yuni Maheswari; I Gede Dyana Arjana; Cok Gede Indra Partha
Jurnal SPEKTRUM Vol 8 No 3 (2021): Jurnal SPEKTRUM
Publisher : Program Studi Teknik Elektro UNUD

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (454.095 KB) | DOI: 10.24843/SPEKTRUM.2021.v08.i03.p6

Abstract

Disruption of short circuit flow of one ground phase that occurred on the transmissionline 150 kV Nusa Dua-Pesanggaran Substation, causing blackouts to occur in the Nusa DuaSubstation area extending to the surrounding area. The disruption that occurred failed to besecured because the GFR (Ground Fault Relay) relay could not detect the presence of a currentinterference so it failed to work. Assisted relays are needed to secure short circuit flowinterference one phase to help the GFR relay, where the selected relay is the DEF (DirectionalEarth Fault) relay. Installation of auxiliary relays requires planning and relay setting steps toobtain Iset, TMS and trip time. Calculations that have been done get the results of the GFR relayworking at a minimum interference of 1,200A while the DEF relay works at a minimuminterference of 0.521A. The one-phase disruption detected on the 150 kV channel based on thesimulation is below 300A. Def relay will work after the GFR relay does not manage to detectinterference of one phase of the land with a time span of 0 - 0.3 seconds.
STUDI ANALISIS SETTING RELAY PENGAMAN DI PENYULANG NGURAH RAI I DAN PENYULANG NGURAH RAI II I.K. Sutarjana; I.G.D. Arjana; T.G.I. Partha
Jurnal SPEKTRUM Vol 2 No 1 (2015): Jurnal SPEKTRUM
Publisher : Program Studi Teknik Elektro UNUD

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (1184.291 KB)

Abstract

Permasalahan gangguan di jaringan distribusi 20 kV seringkali menyebabkan terputusnyapasokan daya listrik kepada pelanggan. Salah satu penyebab keandalan sistem kurang baik adalahkesalahan koordinasi setting relay pada penyulang. Seperti yang terjadi pada penyulang Ngurah Rai Idan Penyulang Ngurah Rai II dimana terdapat kesalahan koordinasi setting antara relay pada pangkalpenyulang yang terletak di Gardu Induk (GI) dengan relay pada di ujung jaringan yang terletak diGardu Hubung (GH). Untuk memecahkan masalah tersebut maka perlu dianalisis setting relay yangsudah ada (eksisting). Untuk membuktikan koordinasi setting relay sudah sempurna, maka akandilakukan simulasi menggunakan bantuan program computer yaitu Electrical Transient AnalysisProgram (ETAP). Dari hasil analisis diperoleh nilai setting dimulai dari setting Over Current Relay(OCR) pada pangkal penyulang (GI) 360 A dan Tms 0,36 sedangkan untuk nilai setting arus OCRpada ujung penyulang (GH) yang menggunakan relay directional 330 A dan TMS 0,16. Kemudianuntuk setting GFR pada pangkal penyulang (GI) diperoleh nilai 34 A dan TMS 0,2. Sedangkan settingGFR pada ujung penyulang (GH) yang menggunakan relay directional diperoleh nilai 31 A dan TMS0,1.
ANALISIS RESETTING PROTEKSI OVER CURRENT RELAY, GROUND FAULT RELAY DAN RECLOSER PADA PENYULANG ABANG DAN FEEDER AMED SETELAH REKONFIGURASI A. A. Gde Agung Semarabawa; Tjok. Gede Indra Partha; I Gede Dyana Arjana
Jurnal SPEKTRUM Vol 6 No 4 (2019): Jurnal SPEKTRUM
Publisher : Program Studi Teknik Elektro UNUD

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (407.185 KB) | DOI: 10.24843/SPEKTRUM.2019.v06.i04.p6

Abstract

Abang feeder receives electricity supply from transformer II 30 MVA GI Amlapura with a line length of 23 kms and has 67 distribution substations with data losses of 0,574 MW. Reducing losses, increasing reliability and continuity, one way to do this is to reconfigure feeders. The feeder reconfiguration will affect the value of the feeder impedance, so the resetting of the Over Current Relay, Ground Fault Relay and Recloser protection systems is needed. Resetting the protection of Amed OCR feeder obtained t value = 0.1 seconds, OCR recloser Tirtagangga obtained t value = 0.2 seconds, and Oang feeder Abang obtained t value = 0.3 seconds. Resetting the protection of the Amed GFR feeder obtained a value of 0.1 seconds, GFR recloser Tirtagangga 0.2 seconds, and GFR feeder Abang 0.3 seconds. The simulation results using the ETAP program are known to coordinate OCR, GFR and recloser already working well with grading time values ? 0.3 second, so it will not cause overlap or trip simultaneously.
Co-Authors A A Gd Maharta Pemayun A. A. Gde Agung Semarabawa A. I. Weking A.A Ngurah Amrita A.S. Murti Ahmad Fauzi Alfian Hadianto Anak Agung Gede Maharta Pemayun Anak Agung Ngurah Wanda Ariesta Antonius Ibi Weking Arya Surya Darma bagus widyananda yoga Bhrama Sakti K.P. Cok Gede Indra Parta Deoka Gusti Dewa Gede Uki Atmaja Dewa Made Rian Sanjaya Dewa Ngakan Made Barel Dewa Putu Yudha Prawira Diky Wahyu Kusuma Budi F. Iskandar Fajar Rizky Kurniawan G. A. P. Yuni Maheswari Galih Budi Santosa Ganggas B Maulana Idham Gede Teguh Pradnyana Yoga Hery Samudra I Dewa Gde Agung Budhi Udiana I Gede Gerry Julius Perdana I Gede Krisnayoga Kusuma I Gede Riana I Gede Wiyoga Putra I Gusti Agung Putra Sanjaya I Gusti Ngurah Kade Suwiherawan I Gusti Nyoman Indra Wiguna I K. Windu Iswara I Kadek Agus Yodha Bhaskara I Kadek Dodik Darma Putra I Kadek Rogan Bayu Candra Dwipa I Ketut Ariek Astana Adi I Komang Anom Astana Ady I Made Adi Purwa Adnyana I Made Deny Setiawan I Made Dian Purnawan I Made Dwi Cahyadi Jaya I Made Mataram I Made Suartika I N Satya Kumara I Nyoman Budiastra I Nyoman Julyantara I Nyoman Setiawan I Nyoman Sutarja I Nyoman Tri Juliarta I Nyoman Upanayana I Nyoman Wardana I Putu Adi Sumastra I Putu Agus Kumara Putra I Putu Arya Suardika I Putu Dimas Darma Laksana I Putu Gede Aras Widya Pratama I Putu Weda Jayanthana I W Rinas I Wayan Agus Teja Baskara I Wayan Alit Wigunawan I Wayan Arta Wijaya I Wayan Artha Wijaya I Wayan Rinas I Wayan Sastrawan I Wayan Sukerayasa I Wayan Swi Putra I Wayan Yoga Prasetya I. N. Partawan I.B.G. Manuaba Ian Rahmadi Kurniawan Ida Bagus A. Swamardika Komang Dody Pramudya Indra Jaya l Gusti Ngurah Janardana M. N. Hanifan M. Nordiansyah Made Ananta Pradnya Made Dwi Krisna Putra Sudiharta Made Niken Ayu Larasati Danianto Nur Ayu Puspita Indra Pratiwi Nyoman Ananda Tri Utami Putu Agus Satriya Guna Adnyana Putu Arya Mertasana Rizal Akbar Fauzany Rukmi Sari Hartati S.K. Supriana Tjok Gede Indra Partha Tjok. Gede Indra P W. Arta Wijaya W. Setiawan Widyadi Setiawan Wikan Pradnya Dana, Gde yoga armika