Claim Missing Document
Check
Articles

Analysis The Potential of Building Information Modeling (BIM) and Lean Construction in Reducing Construction Waste through Modeling: A Case Study of SMP Negeri 6 Surakarta Batee, Arvin Rabbani; Amar, Tsulis Iqbal Khairul; Priyanto, Budi
Prosiding Seminar Nasional Teknik Sipil UMS 2025: Prosiding Seminar Nasional Teknik Sipil UMS
Publisher : Universitas Muhammadiyah Surakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

The construction industry has a significant contribution to the generation of construction waste which has the potential to increase costs and cause environment impacts if not managed optimally. This study aims to analyze the effect of the application of Building Information Modeling (BIM) and Lean Construction principles in reducing construction waste in the construction project of SMP Negeri 6 Surakarta. The methods used in this research include the utilization of BIM for waste estimation and calculation and the Delphi method to identify the main factors causing waste generation. The results showed that BIM-based planning using Autodesk Revit contributed positively to the reduction of construction waste, with a decrease in the percentage of reinforcement steel waste by 4.83% and concrete waste by 8.55%. The main factors contributing to waste generation include initial design that does not consider aspects of material efficiency, material waste due to overuse, inefficiency in the implementation process, repetition of work, and lack of control over ready mix concrete and site mix. In addition, material damage at the procurement stage is also one of the significant causes of construction waste generation. These findings indicate that the application of BIM and Lean Construction can be an effective strategy for reducing construction waste and improving resource efficiency in development projects.
Analisis Faktor Risiko Tahap Pembebasan Lahan pada Pengembangan Perumahan di Kabupaten Boyolali Nugraha, Aditya; Priyanto, Budi
Prosiding Seminar Nasional Teknik Sipil UMS 2025: Prosiding Seminar Nasional Teknik Sipil UMS
Publisher : Universitas Muhammadiyah Surakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Kebutuhan akan rumah tinggal mengalami peningkatan seiring meningkatnya jumlah penduduk, peningkatan kebutuhan perumahan tentu dimanfaatkan oleh pengembang dan pelaku konstruksi lainnya untuk membangun perumahan, Dengan adanya peningkatan akan kebutuhan perumahan maka memerlukan lahan yang cukup untuk membangun perumahan. Langkah-langkah yang dapat diambil yaitu dengan pembebasan lahan, dalam membebaskan lahan tentu terdapat kendala yang akan dihadapi. Penelitian ini bertujuan untuk mengkategorikan risiko tahap pembebasan lahan pada pengembangan perumahan di Kabupaten Boyolali. Metode yang digunakan adalah kualitatif dan kuantitatif. Uji instrumen penelitian menggunakan SPSS. Analisa data menggunakan ISO 31000 untuk menentukan kategori risiko. Berdasarkan hasil analisis tersebut mendapatkan 17 faktor risiko tahap pembebasan lahan dan 15 antaranya masuk dalam kategori risiko tinggi, 3 di antaranya adalah tingginya biaya balik nama mendapatkan nilai R paling tinggi sebesar 10,65, terhambat birokrasi pengurusan perizinan dengan nilai R 10,24, Inkonsisten dalam membuat kebijakan (perubahan kebijakan/aturan dari pemerintah) dengan nilai R sebesar 10,13.
Analisis Produktivitas Alat Berat dalam Pekerjaan Tanah pada Proyek Pembangunan Jalan Pengganti Ruas di Gunungkidul Tahun Anggaran 2024 Putra, Alvian Surya; Sahid, Muhammad Nur; Magfirona, Alfia; Priyanto, Budi
Prosiding Seminar Nasional Teknik Sipil UMS 2025: Prosiding Seminar Nasional Teknik Sipil UMS
Publisher : Universitas Muhammadiyah Surakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Pencapaian produktivitas yang optimal dalam proyek pembangunan jalan tidak terlepas dari beberapa faktor yang mempengaruhi salah satunya penggunaan alat berat. Alat berat berperan penting dalam meningkatkan efisiensi dan produktivitas pekerjaan lapangan. Penelitian ini bertujuan untuk mengetahui produktivitas dan waktu rencana serta pelaksanaan alat berat pada pekerjaan tanah dan mengetahui perbandingan antara waktu di lapangan dengan rencana. Penelitian ini menggunakan jenis penelitian kuantitatif dengan metode observasi langsung dan perhitungan berdasarkan siklus kerja. Hasil perhitungan analisis produktivitas dan waktu lapangan diperoleh hasil rata-rata produktivitas dan waktu pekerjaan galian dengan alat excavator 46,002 m3/jam lama waktu 4 hari; dump truck 10 m3 27,463 m3/jam lama waktu 4 hari; dump truck 5 m3 18,195 m3/jam lama waktu 4 hari; bulldozer 131,804 m3/jam lama waktu 4 hari, pekerjaan timbunan dengan alat dump truck 5 m3 14,472 m3/jam lama waktu 4 hari; motor grader, vibratory compactor, soil compactor 44,923 m3/jam lama waktu 4 hari, pekerjaan lapis pondasi agregat kelas A dengan alat dump truck 5 m3 22,615 m3/jam lama waktu 4 hari; motor grader, vibratory compactor, soil compactor 29,008 m3/jam lama waktu 4 hari. Berdasarkan hasil perbandingan waktu rencana kerja 6 hari dan lapangan 4 hari terdapat perbedaan yang menunjukkan efisiensi yang baik. Hasil ini dapat menjadi acuan estimasi durasi pekerjaan tanah pada proyek serupa.
Optimasi Waktu dan Biaya dengan menggunakan Metode PDM (Precedence Diagram Method) pada Proyek Pembangunan Kawasan PKL Ketandan (Ketandan Utama), Yogyakarta Azindani, Zirlyvera Naufal Syarif; Sahid, Muhammad Nur; Amar, Tsulis Iqbal Khairul; Priyanto, Budi
Prosiding Seminar Nasional Teknik Sipil UMS 2025: Prosiding Seminar Nasional Teknik Sipil UMS
Publisher : Universitas Muhammadiyah Surakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Proyek adalah serangkaian kegiatan terencana yang bertujuan untuk mencapai hasil tertentu dalam batasan waktu dan anggaran yang telah ditetapkan untuk mendapatkan keuntungan. Setiap proyek memiliki tujuan spesifik, durasi yang terbatas, serta anggaran yang harus dikelola dengan efisien. Tujuan dari penelitian ini untuk menganalisis kinerja pada proyek dan memperkirakan penyelesaian proyek Pembangunan Kawasan PKL Ketandan (Ketandan Utama) berdasarkan kinerja proyek dengan meninjau waktu dan biaya. Penelitian ini bersifat kuantitatif yaitu jenis penelitian ini menggunakan pendekatan matematis untuk mengumpulkan serta menganalisis data sehingga bisa terencana dan terstruktur. Hasil analisis dari penelitian ini mengevaluasi dan mengendalikan proyek dengan menunjukkan keterlambatan proyek sebesar -11,403% pada minggu ke-21 dengan indikasi cost overrun senilai Rp3.645.046.378 dan schedule varians sebesar -Rp1.177.246.251. Pada minggu ke-25, nilai CPI 1,19 dan SPI 0,96 mengindikasikan progres proyek lebih lambat dari rencana. Optimasi dilakukan melalui metode crashing dengan penambahan jam kerja, mempercepat durasi proyek dari 57 menjadi 49 hari. Biaya akhir proyek mengalami peningkatan sebesar Rp39.148.133 akibat perubahan biaya langsung dan tidak langsung. Penelitian ini membuktikan bahwa pengendalian dan optimasi menggunakan metode PDM dan crashing dapat meningkatkan efisiensi waktu dan biaya proyek.
Analisis Faktor-Faktor Risiko Perizinan Pengembangan Perumahan menurut Perspektif Developer di Kabupaten Boyolali Setyawan, Andhika Aris; Priyanto, Budi
Prosiding Seminar Nasional Teknik Sipil UMS 2025: Prosiding Seminar Nasional Teknik Sipil UMS
Publisher : Universitas Muhammadiyah Surakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Pada setiap pengembangan perumahan, terdapat berbagai risiko yang dihadapi pengembang yang dapat memengaruhi kelancaran operasional dan keberhasilan proyek tersebut, salah satunya adalah perizinan. Ada beberapa kasus yang pernah terjadi di Boyolali terkait perizinan. Berdasarkan permasalahan-permasalahan yang dihadapi developer dalam proses perizinan, penulis memiliki ide untuk melakukan kajian analisis faktor risiko perizinan pengembangan perumahan di Kabupaten Boyolali menurut perspektif developer. Penelitian ini bertujuan untuk mengetahui faktor-faktor risiko perizinan yang umum dialami oleh para developer perumahan di Kabupaten Boyolali. Metode penelitian yang digunakan dalam penelitian ini adalah metode penelitian kualitatif dan kuantitatif. Data dianalisis menggunakan program aplikasi SPSS versi 27 dan dikategorikan menurut ISO 31000. Hasil penelitian menunjukkan beberapa faktor risiko Dominan yang dialami developer di antaranya: banyaknya jumlah dan jenis perizinan yang harus dimiliki, pengurusan perizinan yang harus menunggu salah satu jenis perizinan selesai sebelum dapat mengajukan perizinan lainnya, serta prosedur perizinan yang berbelit-belit.
IMPLEMENTASI PROBLEM BASED LEARNING BERBANTUAN APLIKASI WEB UNTUK MENINGKATKAN KEMAMPUAN PENALARAN MATEMATIS Fitriana, Eva; Subekti, Fitrianto Eko; Priyanto, Budi
JURNAL MathEdu (Mathematic Education Journal) Vol 7 No 3 (2024): JURNAL MathEdu (Mathematic Education Journal) November 2024
Publisher : Program Studi Pendidikan Matematika Institut Pendidikan Tapanuli Selatan

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Penelitian ini memiliki tujuan yaitu meningkatkan kemampuan penalaran matematis peserta didikmelalui penerapan pembelajaran Problem Based Learning. Metode penelitian ini termasuk ke dalampenelitian tindakan kelas (classroom action research) yang dilaksanakan dalam dua siklus dengan tiapsiklus terdiri dari empat tahapan, yaitu perencanaan, pelaksanaan, observasi dan refleksi. Subjek untukpenelitian adalah peserta didik kelas XI jurusan Farmasi Klinis dan Komunitas (FKK) sebanyak 17 orangdi SMK Muhammadiyah 3 Purwokerto. Peserta didik diberikan tes pada setiap akhir siklus untuk mengukurkemampuan penalaran matematis. Hasil penelitian menunjukkan bahwa pembelajaran matematika melaluipenerapan Problem Based Learning berbantuan aplikasi web dapat meningkatkan kemampuan penalaranmatematis dari pra penelitian sebesar 35,49; siklus I 56,71 mendai 81,11 pada siklus II. Kesimpulan daripenelitian ini adalah pembelajaran dengan menerapkan model Problem Based Learning berbantuanaplikasi web dapat meningkatkan kemampuan penalaran matematis peserta didik.
Analysis of Risk Mitigation Measures in Housing Constraction Projects in Klaten District, Indonesia Alhaqoni, Alfin Hakim; Priyanto, Budi
East Asian Journal of Multidisciplinary Research Vol. 2 No. 12 (2023): December 2023
Publisher : PT FORMOSA CENDEKIA GLOBAL

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.55927/eajmr.v2i12.7313

Abstract

The population growth in Klaten Regency has increased by 3% over the last 5 years. This causes the need for housing to become a primary need for local communities. Because of this increase, there will be many housing development projects that will definitely need to take risk control or mitigation steps in housing construction with the aim of ensuring that housing development projects comply with planning. This research uses a quantitative research approach by conducting a data survey in the form of distributing questionnaires to 30 expert respondents. Then data processing and data analysis using descriptive methods to explain the results of data processing and analysis that have been carried out. From the results of research conducted and surveys of respondents, it was found that 25 risk control steps or mitigation steps were taken by developers in dealing with risk constraints in housing development projects. And of the 25 risk control steps or mitigation steps, there are 5 risk control steps or mitigation steps that are often carried out by developers when facing risk constraints in housing development projects.
Analisa Manajemen Resiko pada Pelaksanaan Proyek Kontruksi Mal Pelayanan Publik Sleman Wisnuaji, Alpri; Priyanto, Budi
Jurnal Sosial Teknologi Vol. 3 No. 5 (2023): Jurnal Sosial dan Teknologi
Publisher : CV. Green Publisher Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.59188/jurnalsostech.v3i5.727

Abstract

Dalam setiap pembangunan proyek konstruksi selalu terdapat faktor-faktor risiko baik dari faktor internal maupun dari faktor eksternal yang dapat mempengaruhi kinerja proyek dan sasaran proyek tersebut. Dampak yang dihasilkan dari risiko yang terjadi mempengaruhi produktifitas, anggaran biaya, kualitas dan prestasi atau pencapaian proyek. Penyusunan skripsi ini betujuan mengidentifikasi, menganalisa dan melakukan pengendalian terhadap risiko yang dominan terjadi pada proyek Mal Pelayanan Publik. Tahapan dalam penelitian ini dimulai dengan identifikasi risiko yang relevan terjadi dengan cara penyebaran kuisioner. Dengan hasil yang didapatkan yaitu 54 risiko yang relevan terjadi pada proyek Mal Pelayanan Publik. Hasil dari kuisioner tahap identifikasi tersebut kemudian dimasukan kedalam kuisioner tahap analisa dengan cara memperkirakan frekuensi terjadinya risiko dan dampak risiko yang disusun dalam bentuk skala likert. Dengan didapatkan hasil analisis risiko yang paling dominan diantaranya:Cuaca tidak menentu, Perubahan jadwal pada pelaksanaan kerja, adanya perubahan desain,dan kurang komunikasi pada tim. Sebagai langkah terakhir dalam penelitian ini adalah melakukan pengendalian terhadap risiko yang paling dominan. Pengendalian yang dilakukan terhadap risiko-risiko yang dominan terjadi dilakukan dengan cara pencegahan terhadap risiko yang terjadi untuk meminimalkan kerugian yang semakin besar.
Metode Pelaksanaan Konstruksi Pekerjaan Struktur atas pada Proyek Pembangunan Gedung 10 Lantai Awang Caesario, Muhamad; Priyanto, Budi
Jurnal Sosial Teknologi Vol. 3 No. 4 (2023): Jurnal Sosial dan Teknologi
Publisher : CV. Green Publisher Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.59188/jurnalsostech.v3i4.737

Abstract

Sektor konstruksi sedang berkembang pesat dengan pembangunan proyek besar oleh pemerintah, swasta, dan keduanya. Metode pelaksanaan konstruksi sangat penting untuk kelancaran dan efisiensi proyek. Namun, terkadang terjadi keterlambatan dan penurunan kualitas dalam tahap pelaksanaan proyek konstruksi. Penelitian ini fokus pada metode pelaksanaan konstruksi gedung 10 lantai di Kota Bandar Lampung, terutama pada struktur atas seperti kolom, balok, dan plat lantai. Pendekatan penelitian meliputi wawancara, studi pustaka, dan observasi dengan data dari PT. Asmi Hidayat selaku kontraktor pelaksana. Tujuan penelitian ini adalah memberikan gambaran tentang permasalahan terkait metode pelaksanaan pekerjaan struktur atas serta mencari solusi yang tepat. Setelah evaluasi terhadap metode pelaksanaan pada proyek pembangunan gedung 10 lantai, hasil penelitian menunjukkan bahwa metode yang digunakan sesuai dengan Rencana Kerja dan Syarat (RKS) serta Standar Nasional Indonesia (SNI) yang berlaku. RKS mengharuskan mutu beton K 250 dengan nilai slump 12 ± 2 cm, sedangkan nilai rata-rata slump pada proyek mencapai 14 cm, nilai tersebut dianggap masih memenuhi standar yang disyaratkan. Tidak ada masalah signifikan terkait waktu pelaksanaan, karena proyek berhasil diselesaikan dalam waktu 240 hari kalender. Berdasarkan hasil penelitian ini, dapat disimpulkan bahwa metode pelaksanaan konstruksi gedung 10 lantai di Kota Bandar Lampung telah tepat dan efektif, sehingga menghasilkan waktu yang efisien.
Perbandingan Pengujian Dinamis Daya Dukung Pondasi Tiang Pancang dengan Kapasitas 100% dan 50% Ghassani, Fadhilla; Priyanto, Budi
Prosiding Simposium Nasional Rekayasa Aplikasi Perancangan dan Industri 2019: Prosiding Simposium Nasional Rekayasa Aplikasi Perancangan dan Industri
Publisher : Universitas Muhammadiyah Surakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Kestabilan suatu struktur tidak hanya ditentukan oleh struktur atas yang secara langsung memikul gaya-gaya yang bekerja pada struktur tersebut, tetapi kestabilan struktur bawah ikut andil dalam hal ini yaitu pondasi yang memegang peranan yang tidak kalah penting. Pondasi tiang atau yang disebut juga pondasi dalam dipergunakan untuk konstruksi beban berat atau bangunan tinggi (high rise building). tidak terkecuali Hotel Manohara Gejayan Yogyakarta yang memiliki 8 lantai. Adanya permasalahan struktur gedung hotel ini pada awalnya direncanakan hanya menggunakan pondasi tiang pancang dengan diameter 0.4 m yang dihubungkan dengan pilecap. Tiang pancang ditekan dengan tekanan 200 Ton sehingga dengan faktor keamanan 2.0, dapat mencapai kapasitas 100% yaitu 100 Ton per tiang beban servis. Namun dengan kondisi akses alat dan keterbatasan lahan, sebagian titik yang berbatasan dekat dengan dinding eksisting hanya dapat ditekan dengan tekanan 100 Ton sehingga hanya mencapai kapasitas 50% yaitu 50 Ton per tiang beban servis. Sedangkan 2 titik lainnya yang berlokasi di sudut (A-8 dan E-9) hanya dapat menggunakan tiang bor (bor kering) dengan kapasitas 26.5 Ton.