Claim Missing Document
Check
Articles

Found 5 Documents
Search
Journal : WIDYA TEKNIKA

APRESIASI KONTRAKTOR DALAM PENGGUNAAN ASURANSI PADA PEMBANGUNAN KONSTRUKSI DI MALANG Irawan, Dafid; -, Riman
WIDYA TEKNIKA Vol 20, No 1: Maret 2012
Publisher : Universitas Widyagama Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Konstruksi merupakan proyek yang memiliki potensi resiko relatif tinggi, dibandingkan pekerjaan non konstruksi seperti manufaktur. Besarnya potensi yang dihadapi, menyebabkan kontraktor harus mencari cara untuk menangani resiko dengan menggunakan asuransi. Penelitian ini bertujuan untuk melihat jenis proyek yang biasa diasuransikan, jenis asuransi, resiko yang sering terjadi, dan pemahaman kontraktor terhadap pentingnya asuransi sebagai alternatif pengalihan resiko proyek. Pengambilan sampel secara random pada kontraktor di Kota Malang. Kuesioner digunakan sebagai alat pengumpulan data, hasilnya diolah menggunakan statistik deskriptif. Untuk mengetahui pemahaman kontraktor akan pentingnya asuransi digunakan Importance-Performance Analysis. Hasil penelitian memperlihatkan bahwa jenis proyek yang banyak diasuransikan adalah proyek gedung, drainase dan proyek infrastruktur milik pemerintah. Jenis asuransi yang sering digunakan adalah Contractor All Risk (CAR). Resiko yang seringkali terjadi di proyek adalah inflasi, kenaikan harga, pencurian dan perampokan, serta kerusakan peralatan dan mesin. Dari hasil Importance-Performance Analysis, bahwa cukup banyak responden yang mengetahui pentingnya asuransi untuk proyek konstruksi, dan  cukup banyak yang  melaksanakannya, sebagian  responden beranggapan bahwa penggunaan asuransi akan mengurangi profit proyek, karena resiko yang dijaminkan jarang terjadi (53%). Hasil lain menunjukkan besar premi yang dibayarkan kontraktor kapada perusahaan asuransi cukup kecil (1-7%) dibanding kerugian yang harus ditanggung apabila terjadi resiko mencapai (40%), rata-rata premi yang diterima mencapai (20%). Kata Kunci: Apresiasi, Kontraktor, Pembangunan, Konstruksi.
ANALISA PERBANDINGAN DESAIN DAN BIAYA FONDASI STRAUSS, FONDASI SUMURAN DAN FONDASI TELAPAK PADA GEDUNG STIKES WIDYAGAMA HUSADA MALANG Irawan, Dafid
WIDYA TEKNIKA Vol 19, No 2: OKTOBER 2011
Publisher : Universitas Widyagama Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Penelitian ini bertujuan untuk mengetahui dan menganalisa besar biaya yang diperlukan pada Fondasi Strauss, Fondasi sumuran dan Fondasi telapak. Penelitian dilakukan pada bangunan gedung asrama STIKES Widyagama Husada Malang yang berlokasi di Kampus III Universitas Widyagama Malang. Jenis penelitian yang dilakukan merupakan penelitian komparatif, yaitu penelitian yang bersifat membandingkan. Variabelnya masih sama dengan penelitian mandiri tetapi untuk sampel yang lebih dari satu, atau waktu yang berbeda. Penelitian ini membandingkan antara fondasi strauss, fondasi sumuran dan fondasi telapak dalam penggunan biaya.Biaya yang diperlukan untuk mengerjakan Fondasi strauss adalah sebesar Rp 4.152.810,16 dengan daya dukung ultimate (qu) sebesar 576.97 Ton, biaya yang diperlukan untuk mengerjakan Fondasi Sumuran adalah sebesar Rp 4.871.620,94 dengan daya dukung ultimate (qu) sebesar 576.35 Ton dan biaya yang diperlukan untuk mengerjakan Fondasi Telapak adalah sebesar Rp 3.910.742,72 dengan daya dukung ultimate (qu) sebesar 576.97 Ton. Sehingga penggunaan fondasi telapak lebih efisien dari pada dua fondasi lainnya yaitu fondasi Strauss dan fondasi sumuran.
PENGUKURAN KINERJA TENAGA KERJA PADA KONTRAKTOR DALAM UPAYA PENINGKATAN KUALITAS BANGUNAN Irawan, Dafid
WIDYA TEKNIKA Vol 18, No 1: MARET 2010
Publisher : Universitas Widyagama Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

The objective of this research is to provide policy recommendations to be implemented by the "Department of Public Works, Construction Services and the Association of Certification Bodies for Construction Services", in the standardization of the quality of workers off on contractors to realize the right job quality, time and cost. Analysis of main factors affecting the quality of freelance workers at the middle contractor, then determine an alternative solution which then determined the most appropriate steps in improving the quality of workers separated. AHP method will be used to perform the selection of alternative solutions to obtain the formulation of recommendations. From the analysis recommended that the three most important items related to improving the quality of freelance workforce is the advancement and technological change (13.2%), the competition for corporate business (9%), the needs and improving the working standards (8.4%). Aspects of the technology is the category that most considered as a factor affecting the increase in labor quality. Internally, the item is considered is the development of interests and talents in relation to the motivation, experience, organization of work in relation to the work environment and workers had attended training in relation to wages. Externally, the most items to be considered is the cost and time for training manpower in relation to the economy and progress, changes in technology in conjunction with technology and business competition in conjunction with business competition.
PENCETAK PAVING DAN BATAKO BOKASHI KOMBINASI MEKANIS DAN HIDRAULIS UNTUK MENINGKATKAN PRODUKTIVITAS Riman, -; Irawan, Dafid; Putri, Chauliah Fatma
WIDYA TEKNIKA Vol 21, No 1: MARET 2013
Publisher : Universitas Widyagama Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Masyarakat pinggiran Sungai Brantas Kota Malang belum memanfaatkan sampah menjadi bahan produktif, seperti pupuk bokashi. Bokashi, selain untuk pupuk juga dapat dimanfaatkan bahan campuran batako dan paving. Sebagian industri kecil pembuat batako dan paving masih menggunakan alat cetak konvensional manual, sehingga produksinya sedikit, kurang padat, kurang presisi,kuat tekannnya kecil. Oleh karena itu, masyarakat perlu teknologi baru pencacah sampah menjadi bokashi, serta alat cetak batako dan paving bagi industri. Metode solusi yang digunakan adalah mengidentifikasi masalah untuk menentukan alternatif solusi yang tepat, dilanjutkan dengan diskusi dan pengumpulan referensi tentang teknologi alat yang akan didesain, kemudian men-desain alat, membuat alat, melakukan uji coba alat untuk menguji kemampuan alat tersebut serta  melatih dan mendampingi mitra dalam penggunaan alat baru sebagai bentuk alih teknologi. Pencacah sampah yang dibuat dengan ukuran (130x100x30) cm, mesin diesel 8 pk, kapasitas 200 kg/jam. Pencetak batako manual-hidraulis yang dibuat dengan ukuran (90x70x30) cm, kapasitas 50 buah/jam. Pencetak paving mekanis yang dibuat dengan ukuran (160x100x40) cm, mesin diesel 8 pk, kapasitas 200 buah/jam. Kata Kunci : Pencetak, Batako, Paving, Bokashi, Mekanis
MODEL PENGUKURAN KINERJA TENAGA KERJA OUTSOURCING PADA KONTRAKTOR UNTUK MENINGKATKAN KUALITAS BANGUNAN -, Riman; Irawan, Dafid; Halim, Abdul
WIDYA TEKNIKA Vol 22, No 1 (2014): Jurnal Widyateknika
Publisher : Universitas Widyagama Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

This study aims to provide policy recommendations that will be implemented by the "Ministry of Public Works, Construction Services Association and the Institute for Certification of Construction Services", in the standardization of the performance of labor outsourcing to contractors to improve the quality of work . The study was conducted on 21 companies outsourcing contractor who has the outsourcing, through questionnaires and interviews as well as in related institutions that contribute to determining policy. With AHP (Analytical Hierarchy Process) method, that the formulation of recommendations obtained as a step strategic, including: 1) the selection consider outsourcing more of experience, expertise and education rather than salary, 2) post acceptance of outsourcing is to conduct job orientation and training are equipped with motivation, so the reward is not the main thing, 3) coaching and directing leadership style most appropriate for outsourcing rather than supporting, 4) outsourcing performance should be evaluated periodically and provide specific action on the work as a form of attention of employers, thus dropping out of employment (severance) last action made if performance is not up to standard . KataKunci: Performance, Outsourcing, Contractor, Building, Quality.