Analisis Risiko Keterlambatan Proyek Menggunakan Metode House of Risk Soetjipto, Jojok Widodo; Qudsy, Naahila Hunafaa; Arifin, Syamsul
Journal of Applied Civil Engineering and Infrastructure Technology Vol 2 No 1 (2021): Agustus 2021
Publisher : Indonesian Society of Applied Science

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.52158/jaceit.v2i1.149

Abstract

In the implementation of project development, problems often occur which cause the project to get obstacles, causing delays in project completion time and failure to achieve the project goals. Therefore, it is necessary to research risk analysis and effectively mitigate it to reduce the negative impact of delays. Currently, many studies analyze the risk of delays but are limited to risk assessment based on probability and impact, and mitigation is only carried out on the causal variables without paying attention to the agent of the delay. While in this study using the House of Risk (HOR) method which consists of 2 stages. The first stage (HOR-1) is to determine the main factors causing delays and the second stage (HOR-2) is to mitigate risk effectively to properly resolve the delay problem based on the delay agent. The results of the delay risk analysis using HOR obtained 6 delay events caused by 7 dominant agents/causes of delay based on the Pareto diagram. Recommendations for handling project delays that are effective can be carried out through 4 main mitigation efforts so that the impact of delays can be prevented or reduced.
Probabilitas Ketepatan Biaya Dan Waktu Dengan Metode Monte Carlo Pada Konsep Earned Value Untuk Proyek Jalan Agustin, Chinta Eva; Soetjipto, Jojok Widodo; Hasanudin, Akhmad
Journal of Applied Civil Engineering and Infrastructure Technology Vol 4 No 1 (2023): Agustus 2023
Publisher : Indonesian Society of Applied Science

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.52158/jaceit.v4i1.151

Abstract

Planning and implementing a construction project involves several factors that must be considered including cost, quality and time. This is the main challenge in a project by controlling costs and time without reducing the quality of work. In this study the case of the construction of the Bts Road Reconstruction Package and Widening Package. Bojonegoro-Pajeng City Of Sta 28 + 230 - 32 + 230 is deemed necessary to carry out a cost and time control with the Concept of Earned Value and Monte Carlo to look for more indicators in analyzing the project so that an optimal cost and time estimate is obtained. There are 3 (three) parameters used in the result value concept, namely ACWP, BCWS, BCWP.The analysis was performed by looking for variations in the calculation manually and using the help of Crystal Ball software. The monitoring result with the Result Value Concept is the comparison of the BCWP value below the ACWP value which proves the project is experiencing fund swelling, and the BCWS value above the BCWP value proves the project is experiencing delays. While the results of monitoring the Result Value Concept using the Monte Carlo method produce the maximum and minimum value of all parameters so that it can be used as a reference for the contractor to determine the rescheduling time for the rest of the project so that the costs and time for the project are in accordance with the planning.
Analisis Indeks Kepuasan Pengguna Terhadap Manajemen Pemeliharaan Bangunan Gedung Adikusuma, Candra Wira; Anik Ratnaningsih; Soetjipto, Jojok Widodo
Journal of Applied Civil Engineering and Infrastructure Technology Vol 4 No 2 (2023): Desember 2023
Publisher : Indonesian Society of Applied Science

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.52158/jaceit.v4i2.574

Abstract

Gedung Kimia A Fakultas MIPA Universitas Jember merupakan bangunan yang dipergunakan sebagai laboratorium penelitian. Gedung Kimia A Fakultas MIPA berdiri pada tahun 1991, sehingga telah beroperasi selama ±31 tahun. Penting adanya manajemen operasional pemeliharaan untuk menunjang kualitas bangunan gedung sehingga layak pakai. Penelitian ini bertujuan untuk mengetahui faktor keluhan pengguna, menganalisis nilai indeks kepuasan pengguna dengan metode Customer Satisfaction Index (CSI), dan menentukan strategi peningkatan nilai indeks kepuasan pengguna. Teknik pengambilan sampel dengan metode slovin. Populasi pengguna gedung sebesar 190 orang dengan sampel 66 orang. Teknik pengumpulan data dengan kuesioner. Teknik analisa data adalah rumusan persepsi pengguna terhadap pemeliharaan Gedung Kimia A Fakultas MIPA Universitas Jember. Berdasarkan hasil dan pembahasan, Gedung Kimia A Fakultas MIPA memiliki nilai Indeks Kondisi Bangunan (IKB) sebesar 78,05 % dengan deskripsi kondisi masih baik, dan nilai Customer Satisfaction Index (CSI) sebesar 66,19 % dengan deskripsi cukup puas. Berdasarkan diagram kartesius empat kuadran metode Importance Performance Analysis (IPA), diketahui 5 variabel pada kuadran satu yang berarti prioritas utama perbaikan. Strategi peningkatan nilai indeks kepuasan pengguna dengan dilakukan perbaikan pada komponen yang termasuk kedalam kuadran satu, sehingga dapat dikatakan sangat puas berdasarkan tingkat kepuasan dengan nilai sebesar >80 %.