ANALISIS PRODUKTIVITAS TENAGA KERJA UNTUK PEKERJAAN PONDASI DAN SLOOF PROYEK PEMBANGUNAN PERUMAHAN TALAGO GREEN ASRI KABUPATEN AGAM Wahyudi, Sepri; Lalan, Helny; Hotter, Robby; Midya Octavia, Dyla
Ensiklopedia of Journal Vol 6, No 4 (2024): Vol. 6 No. 4 Edisi 1 Juli 2024
Publisher : Lembaga Penelitian dan Penerbitan Hasil Penelitian Ensiklopedia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33559/eoj.v6i4.2478

Abstract

General development in the province of Western Sumatra has shown a fairly good and rapid improvement. It can be seen in one of the districts of Agam district which is located in the district of Basung Lubuk which is the construction of subsidized housing. In the development of the workforce in the construction industry is an important factor in measuring the performance of a company. Employee productivity is one of the factors affecting the success of the project. In this case, how much productivity can improve the quality of work. In this research use mixed methods, qualitative and quantitative. By taking concepts based on experience that often happens in the field and is general. Types of jobs observed are foundation and sloof jobs. Data collection techniques using field survey data, calculating jobs and documentation. The results of the data analysis are presented in the form of graphs and presentation tables. Based on the results of the research, then it can be said that the work of foundation and sloof was productive, with the analysis of the data of LUR all labor earned more than 50%. The highest productivity result (LUR) on the job of anstampang was of 78,575%, work of sand grinding under the foundation was of 75,975%, then the pair of stone foundation times of 67,045%, and the grinding of the ground was of 66,73%. The highest yield of productivity (LUR) in cutting was 70.11%, then cutting work was 64.84%, and casting of K-175 concrete sloof was 58.89%. Keywords:  Productivity, Labor Utilization Rate (LUR), Funding, Sloof
PENGARUH MANUVER PARKIR KENDARAAN PADA RUAS JALAN JENDERAL SUDIRMAN KOTA SOLOK TERHADAP ARUS LALU LINTAS Maha Putri Handayani AS; Robby Hotter; Adrian Fadhli; Sri Wahyuni
Journal of Scientech Research and Development Vol 6 No 1 (2024): JSRD, June 2024
Publisher : Ikatan Dosen Menulis

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.56670/jsrd.v6i1.384

Abstract

Penggunaan lahan parkir di badan jalan dapat menyebabkan terganggunya arus lalu intas. Salah satu ruas jalan di Kota Solok yang sebagian badan jalannya digunakan untuk parkir kendaraan adalah jalan Jenderal Sudirman. Ketika kendaraan melakukan manuver parkir akan membutuhkan waktu beberapa saat terutama ketika mengeluarkan kendaraan. Aktivitas ini dapat mengakibatkan tertundanya arus lalu lintas dan menimbulkan antrian kendaraan yang seterusnya dapat menyebabkan kemacetan lalu lintas. Penelitian ini bertujuan untuk mengetahui sejauh mana pengaruh manuver parkir badan jalan terhadap karakteristik lalu lintas. Metode yang digunakan adalah Uji Z Dua Arah, yang mana menghasilkan karakteristik parkir dan karakteristik lalu lintas yang dikelompokkan dalam dua kondisi lalu lintas yakni ketika arus lalu lintas lancar dan ketika arus lalu lintas terganggu. Karakteristik parkir yang diteliti berupa durasi manuver parkir ketika memasuki dan meninggalkan ruang parkir yang didasarkan pada faktor keberadaan kendaraan lain disisi ruang parkir, dan karakteristik lalu lintas berupa perhitungan volume kendaraan. Penelitian ini menghasilkan volume kendaraan ketika arus lalu lintas lancar dibandingkan dengan volume arus lalu lintas terganggu terjadi penurunan volume kendaraan dan dilakukan uji z dua arah didapatkan bahwa penurunan yang terjadi bersifat signifikan.
PKM PENDAMPINGAN PEMBUATAN GAPURA PINTU MASUK DI JALAN HANDAYANI RW 14 KOTA PADANG Dian Wahyoni; Adrian Fadhli; Danyl Mallisza; Melda Fajra; Robby Hotter; Nazili; Elly Marni
Journal of Community Service Vol 5 No 2 (2023): JCS, December 2023
Publisher : Ikatan Dosen Menulis

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.56670/jcs.v5i2.177

Abstract

Pengabdian Kepada Masyarakat Pembuatan Gapura Pintu Masuk di Jalan Handayani RW 14 Kota Padang adalah inisiatif kolaboratif antara Fakultas Teknik dan Perencanaan Universitas Ekasakti, Dinas Perumahan dan Kawasan Pemukiman, serta pemangku kepentingan terkait. Proyek ini bertujuan untuk meningkatkan kualitas lingkungan dan memperkuat partisipasi masyarakat dalam pembangunan lokal. Prose ini melibatkan identifikasi kebutuhan masyarakat, survei lapangan, dan konsultasi dengan Dinas Perumahan dan Kawasan Pemukiman untuk memastikan kepatuhan terhadap regulasi teknis. Proses perancangan gapura pintu masuk dilakukan secara partisipatif, melibatkan masyarakat dalam diskusi terbuka dan presentasi desain. Konstruksi dilaksanakan sesuai rencana, dengan melibatkan masyarakat dalam gotong-royong dan pelatihan terkait pemeliharaan. Hasil pelaksanaan proyek mencakup pembangunan gapura sesuai desain yang disepakati, partisipasi aktif masyarakat, dan peningkatan kapasitas mereka dalam pengelolaan infrastruktur. Dukungan penuh dari Dinas Perumahan dan Kawasan Pemukiman membuktikan kolaborasi yang berhasil, mengintegrasikan aspek regulasi dengan kebutuhan masyarakat. Dampak sosial terlihat dalam peningkatan identitas wilayah, estetika lingkungan, dan penguatan hubungan antara perguruan tinggi, pemerintah, dan masyarakat. Ucapan terima kasih kepada semua pihak yang terlibat, serta saran untuk pemeliharaan berkelanjutan, pengembangan keterampilan masyarakat, dan kolaborasi yang lebih erat dengan pemangku kepentingan, diharapkan dapat memperkuat keberlanjutan proyek ini dan memberikan inspirasi bagi upaya serupa di masa mendatang.
PKM FOR DEVELOPMENT OF SPORTS FACILITIES ON HANDAYANI STREET I, RW XIV Dian Wahyoni; Danyl Mallisza; Adrian Fadhli; Hardi Wijaya; Nazili, Nazili; Robby Hotter
Journal of Community Service Vol 6 No 1 (2024): JCS, June 2024
Publisher : Ikatan Dosen Menulis

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.56670/jcs.v6i1.244

Abstract

This Community Service Activity (PKM) was carried out by lecturers from the Civil Engineering Study Program, Faculty of Engineering and Planning, Ekasakti University, with the aim of building sports facilities on Handayani Street I, RW XIV. The project is designed to provide adequate sports facilities to support physical health and improve the social cohesion of the local community. Implementation methods include planning, coordination with related parties, technical implementation, as well as evaluation and monitoring. The results show that the sports facilities built meet quality standards and have been well used by the community, providing significant physical and social benefits. Active community involvement increases the sense of ownership and responsibility for the facility, supporting its sustainability. The success of this project emphasizes the importance of synergy between universities, government and society, and shows the need to consider social and cultural aspects in service projects. This activity strengthens the role of universities in sustainable community development.
Optimalisasi Perencanaan Jalan Lingkungan dalam Penanganan Permukiman Kumuh Menggunakan AutoCAD Elviyanti; Hotter, Robby; Thressia, Merry
Jurnal Informasi dan Teknologi 2022, Vol. 4, No. 4
Publisher : SEULANGA SYSTEM PUBLISHER

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.37034/jidt.v4i4.247

Abstract

Slum areas really need prevention activities. This activity really requires environmental development planning in housing and residential areas. Environmental quality must also be supported by empowering the community to protect the environment. In Sijunjung Regency there are 31 (thirty one) Slum Housing and Slum Housing locations in 8 (eight) sub-districts. The area is 415.20 (four hundred and fifteen point twenty two) hectares. One of these locations is Nagari Muaro in Sijunjung District. This study aims to reduce slum areas by designing environmental roads as the main basis for development. The locations processed were 3 nagari, namely Muaro in Subarang Ombak with an area of 3.98 Ha; Friday market with an area of 8.46 Ha; and Rimbo Kaluang or Jorong Tangah with an area of 7.31 Ha. This location has a percentage of road surface quality of 85%, namely poor road surface quality. The theory used in planning is Doxiadis namely nature, human environment and networks. Data is processed in a descriptive qualitative analysis by way of observation to interview locations and documentation. The results of this study design environmental roads using Autocad software that can be implemented. So that this research can help design roads in an effort to make settlements healthy by maintaining the social aspects of society.
FACTORS THAT INFLUENCE DELAY IN WORK COMPLETION TIME ON SELF-MANAGED PROJECTS Elviyanti; Robby Hotter; Prenio Ahmad
Journal of Scientech Research and Development Vol 6 No 2 (2024): JSRD, December 2024
Publisher : Ikatan Dosen Menulis

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.56670/jsrd.v6i2.833

Abstract

Construction activities carried out in a self-managed manner experienced several problems or obstacles. One of the problems faced is, among others, design changes, changes in material prices, details of costs carried out in the field are not included in the Cost Budget Plan, materials often arrive late from the work plan, work method errors which cause repetitive work, loss of tools and materials at the project location and are still completing the work after the work contract is completed, so this project experiences delays in completing the work even though the work contract has been completed. This research aims to find out what factors influence delays in completion and to find out the dominant factors that influence delays in completion of the project Self-Managed Vocational High School Padang Center of Excellence. This research was analyzed using descriptive statistical analysis methods to determine the dominant factors that influence delays in completing self-managed work. From the results of data analysis using descriptive statistical analysis, it was obtained that there were changes or additions to work during project implementation with factor code (B3) as the dominant factor influencing delays in completing self-managed work.
SUSTAINABLE SPRINGS MANAGEMENT FOR WATER SECURITY OF THE NAGARI PANTI TIMUR COMMUNITY COMMUNITY, PANTI DISTRICT, PASAMAN DISTRICT Helny Lalan; Hardy Wijaya; Elviyanti, Elviyanti; Robby hotter; Julita Andrini; hafiz Maulana; Randi Maulana; Muhammad afdal
Journal of Community Service Vol 6 No 2 (2024): JCS, December 2024
Publisher : Ikatan Dosen Menulis

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.56670/jcs.v6i2.328

Abstract

Nagari Panti Timur, Panti District, Pasaman Regency, has water resources in the form of natural springs which are the main source of the community's clean water needs. However, various problems such as deforestation, lack of awareness of water conservation, and limited water distribution infrastructure threaten the availability and quality of these water resources. This Community Service activity aims to provide education, training and technical solutions in sustainable spring management. Methods for implementing this activity include identifying problems through surveys and interviews, educating the public regarding water conservation, as well as implementing technical solutions such as building infiltration wells, simple filtration systems, reforesting catchment areas, and building spring water reservoirs. Apart from that, monitoring and evaluation is carried out to ensure program sustainability. The results of the activity showed that the community gained an increased understanding of the importance of water conservation and skills in managing water resources. The infrastructure that has been built is expected to increase the availability and distribution of clean water. The sustainability of this program requires active support from various parties so that the benefits continue to be felt by the community.