IDENTIFIKASI RISIKO PADA PROYEK WASTE TO ENERGY MELALUI KERJASAMA PEMERINTAH DENGAN BADAN USAHA DI SUMATERA BARAT Sesmiwati Sesmiwati; Wahyudi Putra Utama; Martalius Peli
Rekayasa Sipil Vol. 16 No. 2 (2022): Rekayasa Sipil Vol.16. No.2
Publisher : Department of Civil Engineering, Faculty of Engineering, Universitas Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21776/ub.rekayasasipil.2022.016.02.7

Abstract

Waste to energy (WTE) project is a solution to solve energy crisis and at the same time may resolve the waste problem. Public private partnership (PPP) scheme has been widely used to deliver WTE project. The success of PPP projects heavily relies on the advisability of management and risk sharing.  Risk management needed to conduct in order to understand specific risks, examine risk sharing between government and public sector and analyze risk mitigation for preventing and rectifying the impact. The effective decision on risk needed to improve decision-making process that may occur in the WTE projects. Therefore, this study identify risk probability in PPP WTE projects in West Sumatera. This probability relying on expert judgement were collected via an empirical questionnaire survey. The respondents were invited to rate a total of 21 risk factors that impact the success of PPP WTE projects as gleaned from previous research. The overall result ranked risk probability factors that land acquisition and administration approval risk, public opposition, construction cost overrun, operating cost overrun, and design/construction/commissioning performance risk are the top five risk factors affecting the sustainable development of PPP WTE Projects. A better understanding of the risk may improve project feasibility and attract private sector for investing in WTE projects.
Indikator Penyebab Praktik Korupsi Pada Industri Konstruksi Di Sumatera Barat vivi ariani; Dwifitra Y. Jumas; Wahyudi P. Utama; Wenny W. Wahyudi
Rekayasa Sipil Vol. 17 No. 1 (2023): Rekayasa Sipil Vol. 17 No. 1
Publisher : Department of Civil Engineering, Faculty of Engineering, Universitas Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21776/ub.rekayasasipil.2023.017.01.3

Abstract

The main objective of this research is to identify and analyze indicators of the causes of corrupt practices in the construction sector in West Sumatra. Research methodology used descriptive statistics and inferential statistical analysis used in the test is Cronbach's Alpha. The results of Cronbach's Alpha test can be seen in the value in the Corrected Item-Total Correlation column for the number of variables as many as 30 can be seen in r table 0.361. This is also supported by Cronbach's alpha value of 0.960. The indicator that causes corruption in the first rank is the existence of tender evaluations that do not meet the criteria (X9). Conclusion in this research are 10 variables (out of 30 variables) indicators of the causes of corrupt practices in construction projects in West Sumatra.