cover
Contact Name
Ma'ulfi Kharis Abadi
Contact Email
maulfikharisabadi@unbaja.ac.id
Phone
+6281911145430
Journal Mail Official
josce@unbaja.ac.id
Editorial Address
Jl. Syech Nawawi Al-Bantani Curug Kota Serang-Banten
Location
Kota serang,
Banten
INDONESIA
Journal of Sustainable Civil Engineering (JOSCE)
ISSN : 26560844     EISSN : 26562766     DOI : https://doi.org/10.47080/josce.v6i01.3325
JOSE bertujuan untuk: 1. Mempublikasikan informasi, pengetahuan dan hasil penelitian terkait dunia teknik sipil 2. Mempromosikan pendekatan komprehensif terhadap teknik sipil yang menggabungkan sudut pandang berbagai disiplin ilmu. 3. Memperkuat pertukaran akademik dengan institusi lain. 4. Mendorong ilmuwan, praktisi insinyur, dan pihak lain untuk melakukan penelitian dan aktivitas serupa lainnya. JOSCE mempunyai ruang lingkup untuk: 1. Ilmu teknik Sipil 2. Ilmu transportasi 3. Ilmu pendukung teknik sipil
Articles 140 Documents
EVALUASI KINERJA FASILITAS PEJALAN KAKI UNTUK MENCIPTAKAN RUANG PEJALAN YANG HUMANIS Nila Prasetyo Artiwi; Dinda Nurfariani Firdaus; Bambang Hariyanto
Journal of Sustainable Civil Engineering (JOSCE) Vol. 7 No. 02 (2025): JOSCE: Journal of Sustainable Civil Engineering
Publisher : LPPM

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.47080/josce.v7i02.4350

Abstract

https://docs.google.com/document/d/1jjlqT7UGYB78ZeMH0FNm1MqfFyBbl_e9/edit?usp=drive_link&ouid=116007635674699641810&rtpof=true&sd=true
Policy Paper : Penguatan Kompetensi Pekerja Konstruksi Melalui Standardisasi Asesmen, Pelatihan Teknis, Dan Integrasi Data Digital di Lampung Selatan Lita Istiyanti; Nila Prasetyo; Rina Febrina
Journal of Sustainable Civil Engineering (JOSCE) Vol. 7 No. 02 (2025): JOSCE: Journal of Sustainable Civil Engineering
Publisher : LPPM

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.47080/josce.v7i02.4417

Abstract

Policy paper ini mengkaji penguatan sistem sertifikasi tenaga kerja konstruksi di Kabupaten Lampung Selatan dengan menyoroti tiga permasalahan utama yang selama ini menghambat efektivitas pelaksanaan sertifikasi. Masalah tersebut meliputi ketidakterstandaran asesmen yang berdampak pada variasi kualitas hasil sertifikasi, belum tersedianya pembekalan teknis pra-sertifikasi yang memadai untuk memastikan kesiapan peserta sebelum mengikuti uji kompetensi, serta pengelolaan data sertifikasi yang masih dilakukan secara manual dan terfragmentasi antar lembaga. Kondisi ini menyebabkan rendahnya akurasi dan keterlacakan data, serta kurangnya dukungan  terhadap pengambilan keputusan dalam pengembangan SDM konstruksi daerah. Analisis dalam kajian ini dilakukan melalui pemetaan konsep isu strategis, telaah regulasi terkait sistem sertifikasi, kajian sistematik terhadap kebutuhan kompetensi, serta penilaian alternatif kebijakan menggunakan metode USG (Urgency, Seriousness, Growth) dan kriteria pemilihan prioritas. Tiga opsi kebijakan dirumuskan, yaitu standarisasi asesmen berbasis SKKNI, penerapan kewajiban pembekalan teknis secara terstruktur sebelum sertifikasi, serta digitalisasi dan integrasi data sertifikasi melalui platform SPBE. Hasil penilaian menunjukkan bahwa digitalisasi dan integrasi data perlu menjadi kebijakan prioritas karena berpotensi meningkatkan keandalan layanan, mempercepat proses administrasi, serta memperkuat transparansi dan keamanan informasi kompetensi tenaga kerja. Kebijakan ini harus diimplementasikan secara terpadu dengan standarisasi asesmen dan penyediaan pelatihan teknis agar hasil sertifikasi benar-benar merefleksikan kompetensi riil tenaga kerja konstruksi di lapangan. Diperlukan dukungan komitmen kelembagaan, pembangunan infrastruktur digital, peningkatan kapasitas asesor dan operator sistem, serta mekanisme monitoring dan evaluasi yang berkelanjutan untuk memastikan keberhasilan implementasi dan peningkatan daya saing tenaga kerja konstruksi daerah.
PENINGKATAN DAYA TAHAN FATIGUE CAMPURAN ASPAL PANAS BERBASIS BITUMEN ASBUTON BERMINERAL Ali Amal
Journal of Sustainable Civil Engineering (JOSCE) Vol. 7 No. 02 (2025): JOSCE: Journal of Sustainable Civil Engineering
Publisher : LPPM

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.47080/josce.v7i02.4450

Abstract

Salah satu parameter kriteria kinerja perkerasan jalan lentur adalah kerusakan retak akibat kelelahan (fatigue), yang disebabkan oleh kendaraan berat dan beban berulang serta temperatur perkerasan jalan yang tinggi. Retaknya perkerasan jalan lentur akibat kelelahan menerima beban lalu lintas berulang, menyebabkan menurunnya kondisi kekuatan atau daya dukung perkerasan jalan. Penurunan kondisi ini menyebabkan konstruksi perkerasan jalan mengalami kerusakan yang lebih parah, dan berdampak pada penurunan fungsi pelayanan jalan. Penelitian ini bertujuan untuk mendapatkan kinerja campuran beraspal panas yang tahan terhadap kelelahan (fatigue) menggunakan bahan pengikat Bitumen Asbuton Mengandung Mineral (BAMM), hasil semi ekstraksi Asbuton Lawele. Metoda yang digunakan adalah percobaan eksperimental di laboratorium, melalui pengujian kinerja parameter kekuatan (stabilitas) dan ketahanan kelehahan (fatigue) campuran beraspal panas. Sampel yang digunakan adalah jenis campuran Laston–Lapis Antara atau Asphalt Concrete–Binder Course (AC–BC). Dalam rancangan campuran beraspal, bahan pengikat campuran yang digunakan adalah Bitumen Asbuton Mengandung Mineral (BAMM). Mineral yang terkandung dalam bitumen Asbuton diperhitungkan sebagai bahan pengisi (filler) campuran, kemudian dibandingkan dengan parameter yang sama dari campuran beraspal panas menggunakan bahan pengikat Aspal Minyak Penetrasi 60 (AMP 60) dengan agregat gabungan komposisi yang sama. Hasil percobaan menunjukkan bahwa campuran beraspal panas menggunakan bahan pengikat bitumen Asbuton mengandung mineral (BAMM) mempunyai ketahanan kelelahan (fatigue) yang lebih tinggi atau lebih tahan lama dibandingkan campuran beraspal menggunakan bahan pengikat Aspal Minyak Penetrasi 60 (AMP 60), dan dengan penggunaan  campuran beraspal dengan Asbuton sebagai lapis perkerasan jalan, maka dapat mempertahankan umur rencana jalan. 
STABILISASI TANAH DUA TAHAP KAPUR TOHOR  DAN SEMEN PADA JALAN ANGKUTAN KAYU RPH CIBULUH Prabowo Budi Setyawan; Fajar Falah; Eko Wahyu Utomo; Raisa Fadhila
Journal of Sustainable Civil Engineering (JOSCE) Vol. 7 No. 02 (2025): JOSCE: Journal of Sustainable Civil Engineering
Publisher : LPPM

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.47080/josce.v7i02.4499

Abstract

Tanah dasar merupakan elemen penting dalam konstruksi jalan, khususnya pada jalan angkutan Kayu yang menerima beban lalu lintas berat dan berulang. Permasalahan yang sering dijumpai adalah rendahnya daya dukung tanah akibat tingginya kandungan lempung dan indeks plastisitas yang besar. Penelitian ini bertujuan untuk menganalisis pengaruh stabilisasi tanah dua tahap menggunakan kapur tohor (CaO) dan semen terhadap peningkatan daya dukung tanah pada jalan angkutan kayu RPH Cibuluh, Kabupaten Sumedang. Metode penelitian yang digunakan adalah penelitian eksperimental melalui pengujian laboratorium. Tahap pertama dilakukan stabilisasi dengan variasi kadar kapur tohor, kemudian dilanjutkan tahap kedua dengan penambahan semen. Pengujian yang dilakukan meliputi pengujian sifat fisik tanah, batas-batas Atterberg, pemadatan, dan kuat tekan bebas (Unconfined Compressive Strength/UCS). Hasil penelitian menunjukkan bahwa penambahan kapur tohor 12% mampu menurunkan indeks plastisitas dari 42,84% menjadi 15,26% secara signifikan, sedangkan kombinasi stabilisasi dua tahap dengan kapur dan semen meningkatkan nilai kuat tekan bebas tanah dari 426,40 KN/m2  menjadi 2575,93 KN/m2 secara signifikan hingga memenuhi persyaratan teknis yakni 2400 KN/m2 sebagai tanah dasar jalan. Dengan demikian, metode stabilisasi dua tahap ini efektif untuk memperbaiki karakteristik dan daya dukung tanah lempung pada jalan angkutan kayu.
Tinjauan Sistematis Warm Mix Asphalt di Tropis Basah: Analisis Trade-off Stabilitas dan Ketahanan Air Wahyu Araska
Journal of Sustainable Civil Engineering (JOSCE) Vol. 7 No. 02 (2025): JOSCE: Journal of Sustainable Civil Engineering
Publisher : LPPM

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.47080/josce.v7i02.4521

Abstract

Transisi menuju konstruksi jalan berkelanjutan di Indonesia memerlukan alternatif material yang mengurangi emisi karbon tanpa mengorbankan kinerja struktural. Warm Mix Asphalt (WMA) menawarkan penurunan suhu produksi 30-40°C dibanding Hot Mix Asphalt (HMA), namun aplikasinya di iklim tropis basah dengan intensitas hujan tinggi dan suhu permukaan ekstrem masih dipertanyakan. Artikel ini bertujuan mensintesis bukti empiris terkini (2020-2025) mengenai kinerja tiga varian teknologi WMA (Organik, Kimia, dan Foaming) dengan fokus pada parameter stabilitas mekanis dan ketahanan air. Metode Systematic Literature Review (SLR) dengan protokol Preferred Reporting Items for Systematic Reviews and Meta-Analyses (PRISMA) diterapkan pada database ScienceDirect, Google Scholar, dan DOAJ. Dari 387 artikel teridentifikasi, 25 artikel memenuhi kriteria inklusi. Data Stabilitas Marshall, Marshall Quotient (MQ), Void in Mix (VIM), dan Tensile Strength Ratio (TSR) disintesis menggunakan teknik weighted average synthesis. Hasil menunjukkan WMA Organik (Sasobit) menghasilkan stabilitas tertinggi (1.420 kg) dan ketahanan alur terbaik (MQ 451 kg/mm), namun memiliki kerentanan terhadap air (TSR 84,2%). WMA Foaming (Zeolit) paling rentan terhadap kerusakan air (TSR 78,5%) akibat residu kelembaban. WMA Kimia (Evotherm) menawarkan keseimbangan optimal dengan stabilitas memadai (1.210 kg) dan ketahanan air terbaik di antara WMA (TSR 89,1%). Artikel ini menyimpulkan bahwa pemilihan teknologi WMA harus kontekstual: organik untuk ruas jalan dengan beban berat dan drainase baik, kimia sebagai solusi umum di Indonesia, sedangkan foaming murni tidak direkomendasikan tanpa modifikasi filler aktif. Implikasi kebijakan mencakup perlunya revisi Standar Nasional Indonesia (SNI) untuk mengakomodasi spesifikasi WMA yang spesifik iklim tropis.
Evaluasi Karakteristik CPHMA Berdasarkan Data Historis Tahun 2017 Terhadap Spesifikasi Umum Bina Marga 2025 Buhardiman; La One; Ridwan Syah Nuhun
Journal of Sustainable Civil Engineering (JOSCE) Vol. 8 No. 02 (2026): JOSCE: Journal of Sustainable Civil Engineering
Publisher : LPPM

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.47080/josce.v8i02.4871

Abstract

This study aims to evaluate the level of compliance of Buton Asphalt CPHMA that has been implemented in the field with the latest requirements of the 2025 Bina Marga General Specifications. The research method used is a comparative evaluation utilizing Marshall test data from the 2017 Buton Asphalt CPHMA project on the Tapak Kuda road section in Kendari City. The use of this historical data is intended to represent actual field conditions. Previous studies only evaluated the performance of Buton Asphalt CPHMA mixtures based on the specifications applicable at the time of testing. As a result, the level of compliance of CPHMA mixture performance with the latest standards had not yet been determined. Based on the evaluation according to the 2025 Bina Marga General Specifications, four parameters were found to meet the requirements, while two parameters did not satisfy the specified Marshall test criteria. The parameters that met the requirements were VMA with a value of 21.0%, VIM with a value of 8.5%, Stability with a value of 814 kg, and Flow with a value of 4.2 mm. The parameters that did not meet the requirements were VFB at 59.6% because it was below the 60% standard, and VIM at 8.5% because it exceeded the specified range of 4–8%. These evaluation results indicate that the application of CPHMA remains relevant for use in road pavements. However, future optimization of the aggregate gradation is necessary to increase the VFB value and reduce the VIM value so that the durability of CPHMA can comply with the 2025 Bina Marga General Specifications.
Kajian Pengendalian Banjir Sungai Tawing Desa Senden Kabupaten Trenggalek Menggunakan HEC-HMS, HEC-RAS, dan PLAXIS 2D Acep Gita Abdul Wahid; Ignatius Sudarsono; Fauzia Mulyawati
Journal of Sustainable Civil Engineering (JOSCE) Vol. 8 No. 02 (2026): JOSCE: Journal of Sustainable Civil Engineering
Publisher : LPPM

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.47080/josce.v8i02.4873

Abstract

The Tawing River in Senden Village, Kampak Subdistrict, Trenggalek Regency, frequently experiences flooding due to heavy rainfall, changes in land use, and sedimentation, which have reduced the river’s cross-sectional capacity to the point where it can no longer accommodate flood discharge. This study aims to calculate the design flood discharge, analyze hydraulic conditions, and evaluate design stability. The analysis was conducted through hydrological analysis using statistical tests, the Thiessen method, frequency analysis, and HEC-HMS modeling, followed by hydraulic modeling using HEC-RAS and stability analysis using PLAXIS 2D. The results of the HEC-HMS analysis indicate a 25-year return period flood discharge of 393.40 m³/s at the Senden location. The HEC-RAS modeling showed that several sections of the river experienced overtopping because the floodwater level exceeded the existing levees. Mitigation measures are planned for the TW.174–LT.35 segment, spanning 1,076 m, including river normalization, levee raising, and the installation of gabions at erosion-prone locations. The results of the PLAXIS 2D analysis show a safety factor of 1.87 under normal water level conditions and 2.11 under flood water level conditions; thus, the design is deemed safe in terms of global stability based on the criteria used in this study. The study’s findings provide technical recommendations for flood control, including river normalization, embankment raising, and slope reinforcement using gabions with bamboo stakes and mats.
Evaluasi K3 Pekerjaan Pier Head di Ketinggian Kartika Hapsari Sutantiningrum; Nanda Ayu Ningtias
Journal of Sustainable Civil Engineering (JOSCE) Vol. 8 No. 02 (2026): JOSCE: Journal of Sustainable Civil Engineering
Publisher : LPPM

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.47080/josce.v8i02.4890

Abstract

Pekerjaan pier head pada Proyek Jalan Tol Harbour Road II (Elevated) berisiko tinggi mengalami kecelakaan jatuh karena dilaksanakan di area terbuka pada ketinggian kerja 14,11 m dan berdampingan dengan jalur tol aktif. Penelitian ini mengevaluasi kesesuaian prosedur kerja aman pada pekerjaan pier head titik P134S terhadap 17 kriteria dalam Peraturan Menteri Ketenagakerjaan (Permenaker) Nomor 9 Tahun 2016 tentang Keselamatan dan Kesehatan Kerja dalam Pekerjaan pada Ketinggian, sekaligus merumuskan strategi pengendalian risikonya. Pendekatan kualitatif deskriptif evaluatif digunakan melalui observasi lapangan (Februari–April 2026), wawancara mendalam terhadap dua Safety Officer, satu Supervisor lapangan, dan lima pekerja, kuesioner yang diisi tiga personel K3 dan pengawas proyek, serta dokumen proyek. Instrumen divalidasi tiga pakar dan data divalidasi dengan triangulasi sumber, kemudian dianalisis dengan gap analysis dan metode Identifikasi Bahaya, Penilaian Risiko, dan Pengendalian Risiko (IBPRP) menurut Permen PUPR Nomor 10 Tahun 2021. Tingkat kesesuaian mencapai 59% (10 dari 17 kriteria), sedangkan 41% (7 kriteria) belum terpenuhi, yaitu ketiadaan kotak P3K di platform kerja, ganjalan kayu bekas pada perancah, kesalahan teknik pengaitan body harness, pengawasan lapangan yang lemah, ketiadaan pemeriksaan kesehatan sistematis sebelum naik, sertifikasi Tenaga Kerja Bangunan Tinggi (TKBT) Tingkat 2 yang belum lengkap, serta clearance vertikal 4,5 m terhadap acuan 5,0 m. IBPRP menempatkan lima temuan pada kategori risiko besar (nilai 16–20) dan dua temuan pada kategori sedang (nilai 6 dan 12). Strategi pengendalian disusun menurut hierarki pengendalian risiko. Penelitian ini berkontribusi berupa model evaluasi yang memadukan gap analysis regulasi tingkat pasal dengan prioritas IBPRP.
Analisis Struktur Bangunan Bertingkat Terhadap Beban Gempa Pada Bangunan Rumah Sakit (Studi Kasus: RS Primaya-Tangerang, Banten) Afiatur Rizki Ramadhan; Pio Ranap Tua Naibaho
Journal of Sustainable Civil Engineering (JOSCE) Vol. 8 No. 02 (2026): JOSCE: Journal of Sustainable Civil Engineering
Publisher : LPPM

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.47080/josce.v8i02.4895

Abstract

Traffic This study evaluates the seismic response of a multi-storey hospital building at Primaya Hospital, Tangerang, Banten, Indonesia. Considering the importance of maintaining structural performance in essential healthcare facilities, the assessment focuses on the building’s dynamic characteristics, inter-story drift, and second-order effects under earthquake loading. A quantitative case-study approach was employed by modelling the eleven-storey reinforced concrete structure using ETABS. The structural evaluation was conducted through dynamic response spectrum analysis in accordance with Indonesian seismic design provisions, particularly SNI 1726:2019. The results indicate that the fundamental periods in the X and Y directions are 0.743 s and 0.977 s, respectively, while the first two vibration modes are predominantly translational and the third mode exhibits torsional behaviour. The cumulative modal mass participation reaches 100% in both horizontal directions by the thirty-fifth mode. The maximum inter-story drifts are 16.001 mm in the X direction and 28.398 mm in the Y direction, both of which remain below the reported allowable limit of 30.769 mm. Furthermore, the P-Delta coefficients are 0.0064 and 0.0117 in the X and Y directions, respectively, indicating that the Y direction exhibits a comparatively greater second-order effect. Overall, the evaluated parameters satisfy the corresponding criteria reported in the analysis, although the Y direction requires greater attention in structural assessment. These findings provide a basis for understanding the seismic response of the investigated hospital building. However, the results should not be interpreted as comprehensive evidence of building safety or post-earthquake hospital functionality, since member capacity, non-structural components, and essential utility systems were beyond the scope of this study.
Analisis Kinerja Biaya dan Waktu Proyek Pembangunan Jotun Water-Based Production Facility di Bekasi Menggunakan Metode Earned Value Adi Purnomo; Siti Abadiyah
Journal of Sustainable Civil Engineering (JOSCE) Vol. 8 No. 02 (2026): JOSCE: Journal of Sustainable Civil Engineering
Publisher : LPPM

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.47080/josce.v8i02.4947

Abstract

Project management is the application of knowledge, skills, tools, and techniques in executing project activities to achieve predetermined objectives while considering the constraints of cost, time, and scope. The Jotun Water-Based Production Facility Bekasi construction project was planned to have a duration of 546 days, but its realization reached 630 days, resulting in a delay of 84 days. This study aims to determine how the estimated total cost and time of the work using the earned value method, as well as the profit or loss on the Jotun Water-Based Production Facility construction project. The research method used is descriptive quantitative by analyzing project performance based on Earned Value indicators. The analysis results show that the Estimate at Completion (EAC) is Rp96,386,423,076.92, with an estimated additional completion time of 12 weeks. The Estimate at Schedule (EAS) reaches 90 weeks. Based on these estimation results, assuming the project performance in the remaining period remains the same, the project is estimated to experience a loss of Rp12,851,523,076.92. This value is obtained from the difference in the Execution Budget Plan (RAP) at week 78 and week 90, including a tax of 11% of the Cost Budget Plan (RAB). The results show that the Earned Value method can be used to estimate the cost and completion time of the project based on the performance achieved and to identify potential cost and time deviations at the end of the project.