cover
Contact Name
Nohan
Contact Email
retii@itny.ac.id
Phone
-
Journal Mail Official
retii@itny.ac.id
Editorial Address
https://journal.itny.ac.id/index.php/ReTII/about/editorialTeam
Location
Kab. sleman,
Daerah istimewa yogyakarta
INDONESIA
Prosiding Seminar Nasional Rekayasa Teknologi Industri dan Informasi ReTII
ISSN : 19075995     EISSN : -     DOI : -
Sub – Tema : Manajemen EBT (Energi Baru Terbarukan) & Energy Harvesting IOT Robotika Era Industry 4.0 Green Manufacturing Sains Terapan Berbasis Kecerdasan Teknologi Transportasi Cerdas & Ramah Lingkungan Rekayasa Material Maju & Teknologi Nano Teknologi Eksplorasi Mineral, Limbah & Lingkungan Sistem Peringatan Dini & Mitigasi Bencana Alam Teknologi Penanganan Pandemi Covid-19 Teknologi Informasi & Komunikasi Berkesinambungan Berbasis Layanan Technology in Teaching Technology of Online Business Perguruan Tinggi Dalam Pemberdayaan Masyarakat Pengembangan Ekonomi Kreatif di Indonesia Pembangunan Masyarakat Madani Siap Era Industri 4.0 & Society 5.0 Perencanaan Wilayah Kota Berkelanjutan Peran Teknologi Digital Pasca Pandemi & Perubahan Budaya Kerja Rekayasa Infrastruktur Berbasis Manajemen Resiko Bencana Proses Peer Review Editor akan menyerahkan tulisan yang telah diterima kepada tim redaksi untuk menentukan review bagi tulisan yang telah diterima. Pada dasarnya setiap tulisan akan direview oleh seorang ahli (mitra bestari) yang berkompeten di bidang yang menjadi fokus tulisan. Berdasar hasil review pertama, Editor akan menentukan prosedur lanjutan dari sebuah tulisan, diterima dengan perbaikan minor; diterima dengan perbaikan mayor, atau ditolak. Tulisan yang telah direview dan memerlukan perbaikan, akan segera dikirim kepada penulis melalui kontak yang tertera dalam tulisan. Selain substansi tulisan yang diatur dalam proses review, Redaksi juga berhak meminta perbaikan teknis, sebelum tulisan benar-benar diterbitkan. Waktu perbaikan harus memenuhi ketentuan seperti yang diberikan. Setelah proses perbaikan selesai, dan tulisan dinyatakan siap terbit, maka penulis juga harus menyerahkan pernyataan pengalihan hak cipta bagi distribusi tulisan kepada Redaksi Jurnal ReTII atau Penerbit. Semua tulisan yang masih dalam proses review, menjadi tanggung jawab redaksi dan redaksi akan bertanggung jawab terhadap kerahasiaan isi tulisan. Semua tulisan dan dokumen lain yang telah diserahkan kepada redaksi tidak akan dikembalikan
Articles 905 Documents
Analisis Produktivitas Alat Muat Menggunakan Metode Overall Equipment Effectiveness Pada Kegiatan Pengupasan Overburden Di PT. Antareja Mahada Makmur Site PT. Multi Harapan Utama, Kabupaten Kutai Kartanegara, Kalimantan Timur Dirgantara Syah Aditama; Misdiyanta, Partama; Purnomo, Hendro
Retii Vol 18 No 1 (2023): Prosiding Seminar Nasional ReTII ke-18 (Edisi Penelitian)
Publisher : Institut Teknologi Nasional Yogyakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

PT. Antareja Mahada Makmur merupakan salah satu kontraktor pada sektor pertambangan yang melakukan kegiatan penambangan pada wilayah PKP2B milik PT. Multi Harapan Utama. Pada proses pemuatan overburden PT. Antareja Mahada Makmur menggunakan excavator jenis Komatsu PC 2000-8 dengan target produktivitas per unit yang direncanakan sebesar 850 BCM/jam dan target produksi per unit dalam satu minggu pada Pit Sentuk Utara seam 100 sebesar 88.500 BCM. Dari data historikal pada bulan Maret didapatkan produksi rata-rata mingguan belum mencapai target. Produksi pada unit Excavator PC 2000-8 dengan nomor unit 2008-5 sebesar 82.013 BCM dan pada nomor unit PC 2008-6 sebesar 84.674 BCM. Penelitian ini bertujuan menganalisis produktivitas alat muat yang diperoleh menggunakan perhitungan secara aktual dan menggunakan metode Overall Equipment Effectiveness (OEE) serta menganalisa faktor yang mempengaruhi produktivitas alat muat Komatsu PC 2000-8 pada kegiatan pengupasan overburden. Metode OEE digunakan untuk menganalisa peluang peningkatan performa alat operasi penambangan. Berdasarkan hasil penelitian dan analisis yang telah dilakukan, rata-rata produksi pengupasan overburden mingguan pada bulan April unit PC 2000-8 dengan nomor unit 2008-5 sebesar 49.531 BCM dan nomor unit 2008-6 sebesar 79.722 BCM. Sedangkan, setelah melakukan perhitungan OEE rata-rata produksi pengupasan overburden mingguan pada bulan April unit PC 2000-8 dengan nomor unit 2008-5 sebesar 78.433 BCM dan nomor unit 2008-6 sebesar 111.593 BCM. Faktor-faktor penyebab belum tercapainya target produktivitas adalah rendahnya waktu kerja efektif dan efisiensi kerja serta belum tercapainya waktu edar yang telah direncanakan. Upaya yang dapat dilakukan untuk mencapai target produksi, yaitu meningkatkan waktu kerja efektif dengan menekan waktu hambatan yang dapat dihindari, mengoptimalkan efisiensi kerja alat dan melatih keterampilan operator untuk menunjang waktu edar alat muat.
Analisis Kestabilan Lereng Lowwall Pada Penambangan Batugamping di PT Semen Baturaja (Persero) Tbk Kabupaten Ogan Komering Ulu Provinsi Sumatera Selatan Sutejo, Dwiki; Safaruddin; Haryoto, Y.
Retii Vol 18 No 1 (2023): Prosiding Seminar Nasional ReTII ke-18 (Edisi Penelitian)
Publisher : Institut Teknologi Nasional Yogyakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

PT Semen Baturaja (Persero) Tbk is a mining company located in West Baturaja District, Ogan Komering Ulu Regency, South Sumatra Province which is engaged in the mining and processing of Limestone and Clay. Slope stability is one of the most important aspects in the world of mining because slopes are directly related to the safety of workers, equipment and the mining process itself. This research uses the limit equilibrium method of the bishop model with the final result being the value of the factor of safety. The parameters used in this method are the cohesion value, the internal shear angle value and the rock density value. This analysis was carried out on the lowwall mining slope of PT Semen Baturaja (Persero) Tbk by conducting try and error of the mining slope geometry, so that the overall slope geometry is safe with dynamic safety factor > 1.25
ANALISIS KUALITAS BATUAN ANDESIT SEBAGAI BAHAN BANGUNAN DI CV CENTRAL STONE PERKASA Mataheru, Juan Aknes; Wardana , Novandri Kusuma; Isjudarto, Agustinus
Retii Vol 18 No 1 (2023): Prosiding Seminar Nasional ReTII ke-18 (Edisi Penelitian)
Publisher : Institut Teknologi Nasional Yogyakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Andesite rock is an igneous rock that has an important role in the construction of buildings, infrastructure and roads with various advantages. the quality of andesite must also meet certain requirements set out in SNI 03-0394-1989. From the results of the compressive strength test on 4 samples, the average value of compressive strength on andesite rock was 925.18 kg/cm². From the shear resistance test conducted on 2 samples, the average value of shear resistance was 17.59%. This water absorption test was carried out on 2 samples of andesite rock aggregates which resulted in an average value of 1.835%. Petrographic analysis of the 4 samples was carried out at 10x ocular magnification and 5x objective magnification contains the mineral plagioclase 35% – 45%, quartz 4% - 10%, chlorite 4% – 10%, calcite 4% – 15%, basic mass 37% -39%, and Opaque minerals 2% – 3%.
Analisis Pengaruh Faktor Isian Terhadap Hasil Fragmentasi Pada Kegiatan Peledakan Di PT.Putra Perkasa Abadi Site PT.BIB Hutabarat, Hans William; Kusuma, Novandri; Sumarjono, Erry
Retii Vol 18 No 1 (2023): Prosiding Seminar Nasional ReTII ke-18 (Edisi Penelitian)
Publisher : Institut Teknologi Nasional Yogyakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Adanya Boulder dengan ukuran yang lebih dari 80cm pada lokasi hasil kegiatan peledakan dapat menghambat kinerja produksi atau OB Removal. Jika material Boulder > 15% maka dapat menghambat kegiatan operasi penambangan lainnya. Oleh karena itu dengan penelitian ini dapat diambil kesimpulan bahwa ukuran fragmentasi dengan ayakan lebih dari 80 cm pada diameter 200 mm memiliki perbandingan secara (Metode Kuz-Ram) dengan metode Kuz-Ram yaitu 63,41 % dan secara (image analysis) dengan pembacaan delinisiasi Split Desktop 4.0 72,43%, sedangkan pada diameter lubang 171 mm secara (Metode Kuz-Ram) 76,80% dan secara (image analysis) 85,30% sehingga dilakukan Analisis Regresi dengan Metode Eksponen yang menyimpulkan besar nilai pada hasil fragmentasi diameter lubang 200 mm yaitu R= 0,826 dan nilai R2 = 68,3% dan pada diameter lubang 171mm nilai R= 0,960 dan nilai R2 = 92,1% . Sehingga dari hasil Analisis Regresi didapatkan persamaan y= 30.629e5.5227x .pada variabel dependent X (PF) dan variabel independent Y( Fragmentasi Ukuran ayakan 80 cm) pada diameter lubang 200mm dan persamaan y= 229,444 + 78,104(ln)X pada diameter lubang 171mm dengan metode Logarithm. Maka untuk PF yang menjadi rekomendasi dari hasil analisis yaitu PF= 0,185 pada diameter lubang 200mm dan PF= 0,16 pada diameter lubang 171mm.
Evaluasi Produktivitas Excavator Dan Dump Truck Di Pit Cendana Seam U, PT. Bhumi Rantau Energi, Provinsi Kalimantan Selatan Singal, Nahbhilah Ken Hapsari; Supandi; Mukarom, Faisol
Retii Vol 18 No 1 (2023): Prosiding Seminar Nasional ReTII ke-18 (Edisi Penelitian)
Publisher : Institut Teknologi Nasional Yogyakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

In production operations at PT. Bhumi Rantau Energi, the equipment used in coal getting activities include: 1 Komatsu PC 400 LC-7 digger excavator with a productivity of 165.71 BCM/hour and 11 Hino FM 260 JD dump truck hauler with a productivity of 11.04 BCM/hour O'clock are used in coal-getting activities. The reality in the field is that the productivity of each tool is not maximized due to several factors, one of which is that working time is not used optimally, which affects the EU (Effective Utilization) values of 59% and 54%, which do not meet the expected values. Therefore, an evaluation of the factors that affect productivity was carried out using the Quality Control Circle method, which was then carried out to Improve EU, which was previously low, then increased to 65% and 60% so that the productivity of the digger equipment increased by 182,14 BCM/hour and the productivity of the means of hauler was 12,14 BCM/hour by increasing the number of means of hauler so that the digger equipment and the means of hauler are in harmony. Efforts to increase the work efficiency of tools with good time management and supervision This is done in order to avoid the productivity of the tool not working properly, or it can be said that the tool is not working as it should because time cannot be used properly.
Dampak Pengolahan Batu Andesit Terhadap Kondisi Lingkungan di Desa Dadirejo Kecamatan Baleng Kabupaten Purworejo Provinsi Jawa Tengah Siti fadjriah kader; Aprilia Rande, Shilvyanora; Ali Mohamad, Mustapa
Retii Vol 18 No 1 (2023): Prosiding Seminar Nasional ReTII ke-18 (Edisi Penelitian)
Publisher : Institut Teknologi Nasional Yogyakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

PT. Gawi Maju Karsa atau disingkat dengan PT. GMK merupakan perusahaan skala nasional yang bergerak dibidang penambangan batu andesit. Pada kegiatan penambangan batu andesit yang dilakukan PT Gawi Maju Karsa kondisi lingkungan,sosial, dan ekonomi masyarakat yang ada di sekitar lokasi penambangan harus diperhatikan dengan baik. Tujuan dilakukannya penelitian ini adalah guna mengetahui dampak industri pengolahan batu andesit terhadap kondisi lingkungan, sosial, dan ekonomi masyarakat yang ada di sekitar lokasi tambang serta faktor-faktor yang mendorong berkembangnya pengolahan batu andesit.Metode yang dilakukan untuk mengetahui dampak terhadap kondisi lingkungan, sosial dan ekonomi adalah uji laboratorium serta interview kepada masyarakat sekitar sehingga didapatkan dampak industri pengolahan batu andesit terhadap kondisi fisik lingkungan sangat mempengaruhi lingkungan dikarenakan semakin besar permintaan kebutuhan batu andesit, maka mendorong PT Gawi Maju Karsa untuk memproduksi secara besar-besaran sehingga tidak memperhatikan kondisi lingkungan yang menyebabkan kerusakan lingkungan seperti timbulnya lahan kritis. Dan juga hasil pengujian kualitas udara dan air masih dalam keadaan normal yang tidak membahayakan dan merugikan masyarakat.Dampak sosial ekonomi masyarakat akibat adanya industri pengolahan batu andesit merupakan salah satu pendapatan bagi masyarakat sekitar yang berada di lokasi tambang sehingga masyarakat memanfaatkan kesempatan untuk meningkatkan ekonomi demi mensejahterakan kehidupannya. Saran yang diajukan yaitu bagi pemerintah setempat hendaknya melakukan pengawasan dan menindak tegas bagi perusahaan-perusahaan yang melakukan pelanggaran- pelanggaran pokok terhadap lingkungan hidup.
kolam pengendapan Rancangan Teknis Desain Pre compartement Untuk Kolam Pengendapan Diarea Pit 14 Asteng Job Site PT Arutmin Indonesia Asam Asam Kalimantan Selatan Khindyarti, Izulkhaq; Supandi; Mukarom, Faisol
Retii Vol 18 No 1 (2023): Prosiding Seminar Nasional ReTII ke-18 (Edisi Penelitian)
Publisher : Institut Teknologi Nasional Yogyakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Rancangan pre compartement untuk kolam pengendapan lumpur didasarkan pada debit air yang masuk sebesar 0,60 m³/detik yang berasal dari debit pompa sebesar 0,22 m³/detik dan debit air limpasan di sekitar pre compartement sebesar 0,159 m³/detik dan nilai TSS 3489 pada zona inlet. Pre compartement yang dirancang berbentuk limas terpancung dan memiliki 4 kompartemen dengan dimensi, luas 521 m², lebar atas 16 m, panjang atas 32 m, lebar bawah 6 m, panjang bawah 24 m kedalaman 5 m, kemiringan 450, volume kolam 1365 m³. Ada 3 buah penyekat dengan lebar penyekat 3 m, dan panjang penyekat 29 m. Untuk waktu maintenance pre compartement akan dibersihkan dari material yang mengendap dengan menggunakan alat excavator pc 200-8, setiap kompartemen memiliki waktu maintenance yang berbeda-beda kompartemen pertama 24 hari, kompartemen kedua 138 hari, kompartemen ketiga 809 hari, dan kompartemen keempat 4742 hari. Berdasarkan rancangan pre compartement tersebut waktu pengendapan menggunakan perhitungan hukum stokes di dapatkan waktu pengendapan sebesar 25 menit dan kecepatan aliran debit air di dalam kolam sebesar 121 menit, sehingga rancangan pre compartement bisa diterapkan pada Settling pond baru Pit 14 Asteng PT Arutmin Indonesia dengan waktu perawatan yang efektif berdasarkan presentase pengendapan pertikel padatan yang berhasil diendapkan. Kata kunci: : Dimensi pre compartement, Debit air yang masuk pre compartement, Maintenance pre compartement
Rancangan Teknis Pushback Penambangan Batu Bara di Pit Block 01 PT. Borneo Alam Semesta Site PT. Binuang Mitra Bersama Kecamatan Lokpaikat Kabupaten Tapin Provinsi Kalimantan Selatan Wahdian Noor, Ahmad; Supandi; Sidiq, Hidayatullah
Retii Vol 18 No 1 (2023): Prosiding Seminar Nasional ReTII ke-18 (Edisi Penelitian)
Publisher : Institut Teknologi Nasional Yogyakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

PT. Borneo Alam Semesta is a national private company engaged in coal mining contracting at PT. Binuang Mitra Bersama which is located in Budimulya Village, Lopaikat District, Tapin Regency, South Kalimantan Province. PT. Binuang Mitra Bersama as the owner has a production operation mining permit (IUP) covering an area of 537,48 Ha. PT. Binuang Mitra Bersama requires an annual production target of ± 850.000 tons with an average stripping ratio of ± 4:1 according to a predetermined target.Based on the annual mine progress plan that has been made and from the results of volume calculations in the pit, an estimated mining life of pit bmb block 01 is 3 years 4 months with an average number of loading and unloading equipment per year of ± 6 units. In the first year of miningthe volume of overburden uncovered was 3.547.795 Bcm and coal was 857.301 tons. In the second year of mining the volume of overburden uncovered was 3.531.342 Bcm and coal was 860.745 tons. In the third year of mining the volume of overburden uncovered was 3.427.688 Bcm and coal was 879.663 tonnes. and in mining in the last year the volume of overburden uncovered was 865.238 Bcm and coal was 324.643 tons.Keywords: Stripping Ratio, Production Scheduling, Mine Life
Analisis Kualitas Batubara Untuk Memenuhi Spesifikasi Batubara Pasar Ekspor Dengan Menggunakan Metode Blending Di PT. Kutai Energi, Teluk Dalam, Kutai Kartanegara, Kalimantan Timur Lamers, Julinda F M; Purnomo, Hendro; Aprilia Rande, Shilvyanora
Retii Vol 18 No 1 (2023): Prosiding Seminar Nasional ReTII ke-18 (Edisi Penelitian)
Publisher : Institut Teknologi Nasional Yogyakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

PT. Kutai Energi merupakan perusahaan tambang batubara yang diekspor ke pasar negara seperti China, India, Thailand dan negara lainnya. PT. Kutai Energi memiliki 2 kualitas batubara yang berbeda yaitu Low Calorific Value (LCV) dan High Calorific Value (HCV). Kualitas batubara LCV PT. Kutai Energi antara lain; Total Moisture 32,99%; Inherent Moisture 16,62%; Ash Content 5,42%; Volatite Matter 39,86%; Fixed Carbon 38,08%; Total Sulfur 0,80%; Calorific Value (arb) 4159,09 Kal/g. Sedangkan batubara HCV mempunyai Total Moisture 16,22%; Inherent Moisture 12,63%; Ash Content 5,41%; Volatite Matter 40,12%; Fixed Carbon 41,82%; Total Sulfur 1,77%; Calorific Value (arb) 5834,69 Kal/g. Dengan spesifikasi standar kualitas batubara di PT. Kutai Energi yang belum sesuai dengan permintaan konsumen, maka perlu dilakukan pencampuran batubara beda kualitas. Untuk menghitung komposisi pencampuran batubara, digunakan metode Trial and Error dan metode Solver pada Microsoft Excel dan metode Simpleks Program Linier menggunakan Sofware POM-QM for Windows v5. Untuk metode Simpleks didapatkan sebanyak 964 MT dan sebanyak 9436 MT dengan Total Moisture 17,7836%; Inherent Moisture 13,002%; Volatite Matter 40,1021%; Calorific Value 5679,31 Kal/g, dan untuk Metode Trial and Error dan metode solver mendapatkan LCV sebanyak 959 MT dan sebanyak 9441 MT dengan masing-masing parameter Total Moisture 17,775%; Inherent Moisture 13%; Volatite Matter 40,1023%; Calorific Value 5680,2 Kal/g. Kata Kunci: LCV, HCV, Blending, Simpleks, Trial and Error, Solver
Rencana Keberhasilan Reklamasi Pada Kegiatan Penambangan Bijih Nikel PT. Bhumi Karya Utama, Kabupaten Konawe Utara, Sulawesi Tenggara Anisa Sapana, Erin; Supandi; Shilvyanora Aprilia Rande
Retii Vol 18 No 1 (2023): Prosiding Seminar Nasional ReTII ke-18 (Edisi Penelitian)
Publisher : Institut Teknologi Nasional Yogyakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Mining activities have had both positive and negative impacts on the environment. The biggest negative impact is land and soil degradation which causes expansion of critical land, loss of surface layer, loss of soil organic matter, and damage to environmental ecosystems. One way to improve or restore the environmental conditions of former mining activities is to revegetate. The purpose of this research is to find out and make plans for land management that will be carried out of reclamation activities, make and know plans for revegetation activities carried out as part of reclamation activities, as wellas calculating and knowing the estimated costs for reclamation activities. The research method used is qualitative wich is focused on observing the area to be reclaimed. The total area of the mining area is 310 Ha, with a total planned area to be reclaimed in 2022 of 14.70 Ha which will be carried out in stages and starting in the Blok. Utara, Pit. Nakula 1 Selatan with an area of 1.65 Ha and requires a plant of 1,031 trees. From this research it can be seen that the planned total needs for overburden and topsoil will later be used as backfilling in the Block area. North, Nakula Pit 1 South is 16,500 . The types of plants that will be used in revegetation activities are covercrop (Centrosema Pubescens and Pueraria Javanica), pioneer plants (Circumber and Teak) and insert trees (Cashew). The estimated cost of this reclamation activity plan is Rp.332.244.500. Reclamation planning in this study can be said to be successful because it has fulfilled and followed the steps contained in Kepmen ESDM No. 1827 K/30/MEM/2018.