cover
Contact Name
Lithrone Laricha Salomon
Contact Email
lithrones@ft.untar.ac.id
Phone
+62215672548
Journal Mail Official
jmti@ft.untar.ac.id
Editorial Address
Jl. Letjen S Parman No.1
Location
Kota adm. jakarta barat,
Dki jakarta
INDONESIA
Jurnal Mitra Teknik Industri
ISSN : 28293347     EISSN : 2829338X     DOI : https://doi.org/10.24912/jmti
Core Subject : Engineering,
Jurnal Mitra Teknik Industri (JMTI) adalah Jurnal Ilmiah sebagai wadah pengembangan bidang ilmu Teknik dan Manajemen Industri, berisi hasil kajian dan penelitian dari dosen, peneliti, serta praktisi industri. Jurnal Mitra Teknik Industri diterbitkan oleh Program Studi Teknik Industri Fakultas Teknik Universitas Tarumanagara Jakarta, dalam waktu 1 (satu) tahun terbit 3 (tiga) kali.
Articles 146 Documents
INTEGRASI STATISTICAL QUALITY CONTROL DAN METODE TAGUCHI UNTUK OPTIMASI KUALITAS PADA PROSES INVESTMENT CASTING: STUDI KASUS PART G4-28 Armansyah; M. Fadhil Riza S; Siti Rohana Nasution; Intan Novita Dewi
Jurnal Mitra Teknik Industri Vol. 5 No. 2 (2026): Jurnal Mitra Teknik Industri
Publisher : Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24912/jmti.v5i2.39035

Abstract

Product quality is a critical factor in enhancing the competitiveness of the manufacturing industry, particularly in the investment casting sector, where complex production processes are susceptible to various types of defects. PT XYZ has experienced a defect rate of 30% in the G4-28 casting part, exceeding the company’s Internal Failure Rate standard (<20%), with shrinkage identified as the predominant defect. This study aims to identify the major contributing factors to defects and determine a recommended combination of process parameters through the integration of Statistical Quality Control (SQC) and the Taguchi Method. A quantitative descriptive-experimental approach was employed using data from 1,440 casting products produced between June and August 2025. SQC analysis was conducted using check sheets, histograms, Pareto charts, and fishbone diagrams, while process optimization was performed using the Taguchi Method with an L9 (3³) Orthogonal Array, Signal-to-Noise (S/N) Ratio, and Analysis of Variance (ANOVA). The results indicate that shrinkage accounted for 63% of the total defects, followed by porosity at 18%. Root cause analysis identified method, machine, and material factors as the primary contributors to defect occurrence. Based on the Taguchi analysis, the recommended process parameter combination was a melting temperature of 1430°C, a holding time of 15 minutes, and seven shell layers. Although the ANOVA results did not indicate statistically significant factor effects (p-value > 0.05), the Taguchi analysis provided a recommended process parameter combination based on the S/N response. The integration of SQC and the Taguchi Method provides a systematic approach for identifying defect sources and determining process parameters with the potential to improve process stability and product quality in investment casting.
INTEGRASI FMECA DAN DISTRIBUSI WEIBULL DALAM PEMETAAN RISIKO KEGAGALAN UNIT HORIZONTAL DRYER Viriya Toti; Lithrone Salomon; Carla Olyvia Doaly
Jurnal Mitra Teknik Industri Vol. 5 No. 2 (2026): Jurnal Mitra Teknik Industri
Publisher : Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24912/jmti.v5i2.39037

Abstract

The research was conducted at a PET plastic recycling manufacturing company, specifically focusing on the Horizontal Dryer unit which frequently experiences operational failures. The primary issue lies in a high breakdown frequency of 11 occurrences, with downtime durations reaching up to 480 minutes due to material overload conditions that trigger motor current surges during the period of July 2025 to April 2026. This study aims to evaluate the machine's failure characteristics by integrating Overall Equipment Effectiveness (OEE), Failure Mode Effects and Criticality Analysis (FMECA), and Weibull Distribution methods. The calculation results show an average OEE value of 79.89%, where performance efficiency is identified as the main factor for low productivity. Based on the FMECA analysis, the blade component within the main shaft system was identified as the most critical component with the highest risk priority number of 405. Through Weibull statistical modeling, it was found that the failure rate characteristics of this critical component are in the wear-out phase. These findings provide a scientific basis for the company to establish maintenance priorities to minimize the risk of recurring failures in the future.
PENENTUAN WAKTU STANDAR PROSES INBOUND MENGGUNAKAN METODE TIME STUDY DI GUDANG LITHOS DSP PT XYZ Aghnia Gema Agustiany; Agustian Suseno
Jurnal Mitra Teknik Industri Vol. 5 No. 2 (2026): Jurnal Mitra Teknik Industri
Publisher : Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24912/jmti.v5i2.39039

Abstract

The efficiency of the inbound process is a crucial factor in maintaining smooth operations in modern warehousing. The Lithos Warehouse at the Depot Supply Point (DSP), PT XYZ, faces constraints due to the absence of a systematically measured standard time, causing operational performance evaluations to rely on subjective estimates that potentially conceal time waste. This study aims to measure work time, establish standard time parameters, and evaluate the efficiency of the inbound process flow, which includes unloading-staging, checking, and put-away activities. The approach used is the Time Study method through direct observation of 77 actual data points for each activity. Data processing involves statistical validity testing (data adequacy and consistency tests), performance rating adjustment using the Westinghouse Rating System, and allowance factor calculations. The results successfully establish the official standard times: 24.29 minutes for unloading-staging, 29.12 minutes for checking, and 111.90 minutes for put-away. Based on the Process Efficiency Score, all work stations are categorized as inefficient, achieving scores of 79.78%, 73.24%, and 74.82%, respectively. The study concludes that time waste gaps exist in the field, with the put-away activity recording the largest time loss of 28.17 minutes per cycle, making it the primary priority for the company's operational improvement proposals.
ANALISIS POSTUR TUBUH PEKERJA PADA PEMBANGUNAN RUMAH 4 LANTAI DENGAN MENGGUNAKAN METODE REBA Hamdani Purba; I Wayan Sukania; Lamto Widodo
Jurnal Mitra Teknik Industri Vol. 5 No. 2 (2026): Jurnal Mitra Teknik Industri
Publisher : Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24912/jmti.v5i2.39064

Abstract

The construction sector presents considerable occupational health and safety challenges, particularly the risk of work-related musculoskeletal disorders (MSDs) associated with physically demanding tasks, manual material handling, and non-neutral working postures. This study assesses ergonomic risks among workers on a four-story residential building project using the Rapid Entire Body Assessment (REBA) method. Data were collected through direct observation, photographic documentation, and postural assessment of four workers performing distinct activities: removing nails from wooden beams, lifting cement bags, transporting cement, and adding sand to a cement mixture. The REBA scores were 10, 9, 10, and 10, respectively, placing all activities in the high-risk category and indicating the need for prompt corrective action. The identified risks were primarily associated with trunk flexion, manual handling of materials, high physical exertion, and repetitive movements. These findings underscore the importance of systematic ergonomic interventions, including improved working postures, appropriate material-handling aids, optimized work–rest schedules, and strengthened occupational safety practices. Such measures may reduce ergonomic exposure and the potential risk of MSDs while supporting a safer and more sustainable construction work environment.
PENERAPAN LEAN MANUFACTURING PADA PROSES PRODUKSI STRIPPER BUSHING DI CV SURYA BAJA MANDIRI Rasyid Zainulmuttaqin; Risma Fitriani; Ade Momon S
Jurnal Mitra Teknik Industri Vol. 5 No. 2 (2026): Jurnal Mitra Teknik Industri
Publisher : Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24912/jmti.v5i2.39065

Abstract

Increasing competition in the manufacturing industry encourages businesses, particularly small and medium enterprises in the metal manufacturing sector, to continuously improve production process efficiency to maintain competitiveness. CV Surya Baja Mandiri is a metal manufacturing SME in Karawang that faces waste issues in the stripper bushing production process, particularly at the turning station which experiences overprocessing due to machining results that do not meet the specified dimensional requirements. This study aims to identify waste occurring in the stripper bushing production process and to design improvement proposals to enhance production efficiency. The method used is Value Stream Mapping (VSM) supported by Process Activity Mapping (PAM) within a lean manufacturing framework, with data collected through direct process time measurement using a stopwatch and field observation. The results identified four types of waste, namely overprocessing, defect, inventory, and motion, with a total Non Value Added Time of 105 seconds or 18.41% of the total process time. The actual production process has a lead time of 572 seconds with a Process Line Efficiency of 39%. Improvement proposals consisting of SOP and standard time development for the turning station, preventive maintenance for the lathe machine, and polibox relayout produced a future state map design with a lead time reduction to 448 seconds and an increase in Process Line Efficiency to 50%.
RULE-BASED DECISION SUPPORT DASHBOARD FOR QUALITY 4.0 PERFORMANCE MEASUREMENT IN THE FOOD AND BEVERAGE INDUSTRY Mohammad Agung Saryatmo; Parwadi Moengin; Dadang Surjasa; Rina Fitriana
Jurnal Mitra Teknik Industri Vol. 5 No. 2 (2026): Jurnal Mitra Teknik Industri
Publisher : Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24912/jmti.v5i2.39066

Abstract

Quality 4.0 implementation requires a performance measurement mechanism capable of translating measurement results into actionable information for performance improvement. This study aims to operationalize an empirically validated Quality 4.0 Performance Measurement System (Q4PMS) model into a rule-based decision support dashboard for the food and beverage industry. The underlying model consists of five dimensions: Digital Readiness, Technological Capability, Process Performance, Organizational Performance, and Sustainability Performance. Empirical parameters previously derived from PLS-SEM and IPMA are incorporated as fixed system inputs and are not re-estimated in the present study. The dashboard integrates a Performance Evaluation Engine that converts assessment data into Performance Scores and Performance Levels with a Decision Engine that combines performance and importance information through IF-THEN decision rules to generate priority classifications and recommended actions. Application of the decision mechanism classified Organizational Performance as the Primary Improvement Priority, Process Performance as Maintain, and Digital Readiness and Technological Capability as Monitor. Expert validation produced scores ranging from 4.20 to 4.60, while field validation resulted in an overall average score of 4.625 on a five-point scale. The findings demonstrate the feasibility of the proposed dashboard as a decision-support mechanism for translating Quality 4.0 performance information into systematic improvement priorities and managerial recommendations.