cover
Contact Name
Lithrone Laricha Salomon
Contact Email
lithrones@ft.untar.ac.id
Phone
+62215672548
Journal Mail Official
jmti@ft.untar.ac.id
Editorial Address
Jl. Letjen S Parman No.1
Location
Kota adm. jakarta barat,
Dki jakarta
INDONESIA
Jurnal Mitra Teknik Industri
ISSN : 28293347     EISSN : 2829338X     DOI : https://doi.org/10.24912/jmti
Core Subject : Engineering,
Jurnal Mitra Teknik Industri (JMTI) adalah Jurnal Ilmiah sebagai wadah pengembangan bidang ilmu Teknik dan Manajemen Industri, berisi hasil kajian dan penelitian dari dosen, peneliti, serta praktisi industri. Jurnal Mitra Teknik Industri diterbitkan oleh Program Studi Teknik Industri Fakultas Teknik Universitas Tarumanagara Jakarta, dalam waktu 1 (satu) tahun terbit 3 (tiga) kali.
Articles 146 Documents
PENGENDALIAN KUALITAS PADA KOMPONEN BARREL PENA E7 DENGAN METODE SIX SIGMA DI PT. X Moses Xanthus; Marcellinus Irvan P; Angelina Laurentcia; Vanessa Stefani; Lithrone Laricha Salomon
Jurnal Mitra Teknik Industri Vol. 5 No. 1 (2026): Jurnal Mitra Teknik Industri
Publisher : Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24912/jmti.v5i1.38038

Abstract

This study analyzes quality control in the production of E7 pen barrel components in the injection department of PT. X, where the Defect rate consistently exceeded 5% from January to September 2025, peaking at 12.30% in July. The Six sigma method was applied through a Project Charter, Fishbone Diagram, FMEA (with the highest RPN values for material drying at 105 and flashing at 96), as well as data analyses such as Pareto charts to identify dominant Defects arising from unstable mold temperature, low injection pressure, and non-uniform cooling. This descriptive quantitative research uses primary data (observations of temperature, pressure, and Defects) and secondary data from company reports, collected through observation, interviews, and analytical tools such as Minitab and Excel for DPMO calculation and reliability validation. The results indicate potential improvements in the efficiency of the main production process (70% of pen output) through the stabilization of machine parameters and the process DPMO value was reported at 310,416 with a sigma level of 1.995, indicating that the process quality remains low. The main improvement solution involves the application of a Cooling conformal channel to the injection mold, which includes the design of a water-cooling system aimed at distributing heat uniformly and reducing sink marks and flash on the thin walls of the barrel.
ANALISIS PENGARUH MOBIL LISTRIK TERHADAP PENJUALAN MOBIL INTERNAL COMBUSTION ENGINE (ICE) BERDASAR UJI ANOVA Wilson Patrick Tirtamidjaja; Anjerina Hartanto Widjaya; Claudia Glory Marchatmyna; Lina Gozali; Meirista Wulandari
Jurnal Mitra Teknik Industri Vol. 5 No. 1 (2026): Jurnal Mitra Teknik Industri
Publisher : Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24912/jmti.v5i1.38039

Abstract

The purpose of this paper was to determine whether Indonesian sales of internal combustion engine (ICE) vehicles are impacted by the growth in electric vehicle sales. The Association of Indonesian Automotive Industries' (GAIKINDO) publicly available wholesales reports for the years 2020–2024 provided the data used in the analysis. The association between the sales of the electric vehicle (X variable) dan the sales of the ICE vehicle (Y variable) was investigated quantitatively using simple regression analysis dan the F-test. The test results show that the significance value is greater than 0.05, with a value of 0.729. Therefore, it can be stated that the data distribution is normal. Then, the Spearman's Rank Correlation Test was performed, yielding a correlation coefficient value of -0.545, which means the two variables have a strong negative relationship; when one variable increases, the other will decrease. The significance value of the Spearman's rank correlation test performed was 0.067, which is below 0.1 as the P-Value. Next, the F-test was performed, resulting in an F-statistic value of 5.026, which, when compared to the F-table, is 4.96 (F-statistic ≥ F-table). From the 3 tests conducted, it can be concluded that H0 is accepted, meaning that the sale of electric cars significantly affects the sale of ICE (Internal Combustion Engine) cars.
PERANCANGAN KONSEP MODULAR PRODUCTION SYSTEM (MPS) DENGAN MENGGUNAKAN METODE VDI 2221 DAN ANALISIS KONSUMSI ENERGI PADA SISTEM PRODUKSI MODULAR (MPS) ALian Jaya Lesmana; Agus Halim; Didi Widya Utama
Jurnal Mitra Teknik Industri Vol. 5 No. 1 (2026): Jurnal Mitra Teknik Industri
Publisher : Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24912/jmti.v5i1.38040

Abstract

This study aims to design a modular production system (MPS) concept that is capable of optimally lifting and moving workpieces and analysing the energy consumption required during operation. The method used is VDI 2221 for systematic concept design, combined with a sensor-based quantitative experimental method to measure air and electrical energy consumption. The design results produce four concept variations, with variation 4 (4-axis robot, specific gripper bracket, magnetic sensor, electric gripper, aluminium profile as bed plate, table, steel foot adjuster, PLA+ jaw gripper) selected as the best concept because it is in accordance with the initial specification list and has the highest weight value (4.54). Pneumatic energy consumption over one hour recorded a total air volume of 338 L, a converted power of 1.16 kW, and a total energy of 4,175.424 kJ. Total electrical energy consumption reached 0.315 kWh, with the compressor accounting for the largest share at 0.239 kWh. The VDI 2221 method proved effective in producing a systematic MPS design concept that fulfils all established technical specifications.
OPTIMASI KINERJA RANTAI PASOK PERUSAHAAN MAKANAN RAMEN X DENGAN PENDEKATAN HOR-MOORA Elena Cecilia Lam; Lithrone Salomon; Wilson Kosasih
Jurnal Mitra Teknik Industri Vol. 5 No. 1 (2026): Jurnal Mitra Teknik Industri
Publisher : Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24912/jmti.v5i1.38718

Abstract

Ramen X is part of PT. XYZ that runs a restaurant business in the Food and Beverage sector. The food they sell can go bad quickly so there are a lot of risks involved in getting it from one place to another. If these risks are not managed properly, they can cause problems with the way the business runs and lead to losses. This study focuses on analyzing and mitigating supply chain risks in Ramen X using the SCOR 12.0 framework and an integrated HOR-MOORA approach. The study found that supply chain mapping using the SCOR 12.0 model identified 14 activities across the five main processes, plan, source, make, deliver, and return. From these activities, 22 risk events and 24 risk agents were identified throughout the supply chain. Furthermore, 14 priority risk agents were selected based on the ARP values in HOR phase 1 and 14 mitigation actions determined using the values in HOR phase 2. In addition, the MOORA analysis ranked these mitigation actions based on values, with PA9, PA2, PA5, PA13, PA1, PA4, PA7, PA12, PA3, PA8, PA14, PA6, PA11, and lastly PA10. Both HOR and MOORA consistently indicate that the top three mitigation actions are PA9, PA2, and PA5. Therefore, these three mitigation actions are recommended as the best strategies to handle Ramen X’ supply chain risk problems.
EVALUASI SISTEM MANAJEMEN TUGAS BERBASIS DISCORD DENGAN INTEGRASI GOOGLE SHEETS UNTUK MENDUKUNG KOLABORASI TIM PADA GEN Z Angelica Trifosa Angelica Trifosa1; Nicolas Chandra; Endah Setyaningsih; Meirista Wulandari
Jurnal Mitra Teknik Industri Vol. 5 No. 1 (2026): Jurnal Mitra Teknik Industri
Publisher : Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24912/jmti.v5i1.38719

Abstract

This study aims to evaluate the usability of a task management system based on a Discord bot integrated with Google Sheets to support digital collaboration activities. The background of this research is the fragmentation of collaboration tools across multiple applications, which may reduce efficiency and increase task management complexity. A mixed-method approach was employed by combining quantitative and qualitative analyses to obtain a comprehensive understanding of user experience. The system was tested with 15 participants through simulated task management scenarios, including task creation, updating, deletion, and monitoring via the integration of Discord and Google Sheets. Data were collected through observation and questionnaires covering aspects of effectiveness, efficiency, workflow clarity, system understanding, and usage potential. The results show that all participants successfully completed the assigned tasks with a 100% success rate. Most users were able to understand the system workflow after a single use, and the division of functions between platforms was considered clear without significant confusion. However, improvements are still needed in onboarding support and user documentation. In conclusion, the developed system demonstrates good usability and has potential to effectively support task management in digital collaborative environments.
PENGUKURAN WAKTU DAN PEMBUATAN PETA TANGAN KIRI DAN TANGAN KANAN PROSES PERAKITAN STEKER LISTRIK I Wayan Sukania; Lamto Widodo; Rymartin; Michael Hidayat
Jurnal Mitra Teknik Industri Vol. 5 No. 1 (2026): Jurnal Mitra Teknik Industri
Publisher : Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24912/jmti.v5i1.38720

Abstract

A work chart is an analytical tool used to understand work activities and support work improvement to increase efficiency and productivity. A workstation chart analyzes activities performed at a single workstation, while a left-hand and right-hand process chart analyzes both hand movements during assembly. Proper task allocation between the hands and appropriate component placement on the worktable can make assembly faster, more efficient, and ergonomic. This study aims to determine the standard time for each work element in assembling an electrical plug. The research used direct time measurement of manual assembly involving five components: the plug body, plug cover, screws, cable clamp, and cable. The respondents were students of the Industrial Engineering Study Program at Universitas Tarumanagara. The results identified 30 work elements in the assembly process. The longest element was installing screw 3, requiring 5 seconds, while most of the shortest elements required 0.5 seconds. The total cycle time was 32.5 seconds. After considering adjustment factors based on skill, effort, working conditions, and consistency, the normal time was 28.83 seconds. Furthermore, allowances for personal needs, fatigue, environmental conditions, physical effort, working posture, concentration, and unavoidable delays were incorporated. Based on these factors, the standard time for the electrical plug assembly process was 32.15 seconds, providing a reference for evaluating assembly performance and improving work methods and workstation efficiency in future assembly operations and productivity.
PENGUATAN SISTEM ASSESSMENT KINERJA MITRA KERJA MENGGUNAKAN METODE WEIGHTED SCORING MODEL DAN INDEKS KONSISTENSI PENILAIAN PADA PT INDUSTRI TELEKOMUNIKASI INDONESIA (PERSERO) Leoni; Risma Fitriani; Ade Momon S
Jurnal Mitra Teknik Industri Vol. 5 No. 2 (2026): Jurnal Mitra Teknik Industri
Publisher : Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24912/jmti.v5i2.39029

Abstract

Partner performance Assessment is an essential aspect of maintaining the Quality of goods and services procurement while supporting sustainable collaboration between a company and its vendors. PT Industri Telekomunikasi Indonesia (Persero) implements a partner performance Assessment system based on multiple weighted evaluation criteria. However, the involvement of more than one evaluator may lead to differences in judgment, potentially affecting the objectivity and consistency of the Assessment results. This study aims to strengthen the partner performance Assessment system through the implementation of the Weighted Scoring Model (WSM) and the Assessment Consistency Index (ACI). The WSM method was used to calculate the final performance scores and rank partners based on the assigned weights and evaluation scores for each criterion, while the ACI was employed to measure the level of consistency between Assessments conducted by the Procurement and Partnership Division (PK) and the User Division (MP). The data were obtained from PT Industri Telekomunikasi Indonesia (Persero)'s partner performance Assessment documents for the October 2025 evaluation period. The results indicate that all partners achieved WSM scores ranging from 4.40 to 5.00, placing them in the good to very good performance categories. Furthermore, the ACI value of 1.01 indicates a very high level of consistency between the evaluations conducted by the Procurement and Partnership Division (PK) and the User Division (MP). These findings demonstrate that integrating the WSM and ACI methods enhances the objectivity, transparency, and reliability of the partner performance Assessment system.
RANCANGAN RANSEL KEDARURATAN DENGAN METODE SCAMPER UNTUK MENGANTISIPASI KONDISI BENCANA Rafilia Vita Liveani Pertiwi; Lamto Widodo; Didi Widya Utama
Jurnal Mitra Teknik Industri Vol. 5 No. 2 (2026): Jurnal Mitra Teknik Industri
Publisher : Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24912/jmti.v5i2.39030

Abstract

As the largest archipelagic country located on the Ring of Fire, Indonesia experiences a very high frequency of natural disasters. The speed of individual response is a key determinant of safety, especially in the concept of the first 72 hours after a disaster. However, in a state of panic, ordinary people tend to carry non-essential items in makeshift bags. This study aims to design a disaster preparedness bag that is ergonomic, functional, and meets the needs of the Indonesian people. The method used is SCAMPER to modify the bag's features and Ulrich & Eppinger for concept development, selection of the best design, and prototype creation. Based on a survey via Google Form, problems were identified during evacuation and the need for emergency equipment. Based on the SCAMPER analysis, three alternative concept designs were generated. Through the concept selection process, the third design was selected as the best concept for implementation with specifications of a bag height of 43 cm, a bag width of 30 cm, a distance between shoulder straps of 20 cm, a shoulder strap width of 7 cm, and a bag handle of 10 cm, which are in accordance with the anthropometry of Indonesian people of productive age.
SYSTEMATIC LITERATURE REVIEW: FREKUENSI PENGGUNAAN TOOLS PADA SETIAP FASE DMAIC DALAM LEAN SIX SIGMA Muhammad Afiril Susanto; Joniarto Parung; Markus Hartono
Jurnal Mitra Teknik Industri Vol. 5 No. 2 (2026): Jurnal Mitra Teknik Industri
Publisher : Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24912/jmti.v5i2.39031

Abstract

The implementation of Lean Six Sigma through the DMAIC (Define, Measure, Analyze, Improve, Control) framework has been widely recognized as effective in improving product quality and process efficiency, yet mapping the frequency of tool usage across each phase remains scarcely addressed. This study aims to identify and analyze the frequency of tool usage in each DMAIC phase within Lean Six Sigma implementation. A systematic literature review method was employed, with searches conducted via Publish or Perish based on Google Scholar data over the past five years, yielding 90 relevant papers for analysis. Findings show the Improve phase recorded the highest frequency (232), followed by Measure (229), Define (221), and Analyze (220), while Control recorded the lowest (198); the high frequency in Improve reflects the complexity of designing solutions and assessing baseline conditions, whereas Control, being more oriented toward sustaining outcomes, relies on more targeted tools. Each phase had its own predominant tools: SIPOC and Project Charter (Define), Control Chart and Pareto Chart (Measure), Fishbone Diagram (Analyze), Standard Work/SOP (Improve), and Control Chart and Standardization (Control). Bibliometric analysis using VOSviewer confirmed Lean and Six Sigma as a unified conceptual framework, with case studies as the dominant research design and Indonesia as the leading contributor.
USULAN PERBAIKAN KUALITAS PRODUKSI LEM MENGGUNAKAN PENDEKATAN LEAN SIX SIGMA DAN POKA-YOKE DI PT LIGNO SPECIALITY ADHESIVE Whilly Abdullah Wicaksono; Ahmad; Carla Olyvia Doaly
Jurnal Mitra Teknik Industri Vol. 5 No. 2 (2026): Jurnal Mitra Teknik Industri
Publisher : Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24912/jmti.v5i2.39033

Abstract

Manufacturing companies in Indonesia consistently show dynamic development from year to year. PT Ligno Specialty, a manufacturing company, has issues in its production process that are causing an increase in defect rates. This research aims to reduce the defect rate of the LA 232 A adhesive product at PT Ligno Specialty Adhesive thru the application of the Lean Six Sigma method with the DMAIC framework and the design of Poka-Yoke mechanisms. Production data for the year 2025 shows a total defect of 5,970 kg out of 91,703 kg of production, with a DPU value of 0.0651, a DPMO of 16,275, and a sigma level of 3. These results indicate that the process quality is still at the industry average level. Root cause analysis shows the dominance of human error, such as material weighing mistakes and non-compliance with production flow. The proposed improvements include the implementation of the Poka-Yoke system at critical points in the process and Lean Six Sigma-based quality control. To reduce the defect rate, the research suggests improvements thru the Poka-Yoke approach. The proposed solutions include the addition of a flow meter on the water tap for measurement accuracy, the provision of a quarantine area for weighed materials to prevent mixing, and the implementation of a production check sheet that must be filled out by operators and supervised by a supervisor. It is expected to improve production yield and reduce the Cost of Poor Quality (COPQ).