cover
Contact Name
Juliana Fisaini
Contact Email
j.fisaini@usk.ac.id
Phone
+6281377412304
Journal Mail Official
jurnaltekniksipil@usk.ac.id
Editorial Address
Jurusan Teknik Sipil, Fakultas Teknik, Universitas Syiah Kuala Jl. Syech Abdurrauf No. 7 Darussalam, Banda Aceh 23111
Location
Kab. aceh besar,
Aceh
INDONESIA
Jurnal Teknik Sipil
ISSN : 20889321     EISSN : 25025295     DOI : http://dx.doi.org/10.24815/jts.v12i2.30788
Core Subject : Engineering,
Jurnal Teknik Sipil (Journal of Civil Engineering) Universitas Syiah Kuala is a scientific journal, published by Civil Engineering Department, Faculty of Engineering, Universitas Syiah Kuala. It is aimed at disseminating research results related to civil engineering fields, where readers of the journal are expected from civil engineering researchers/scientists, students in related fields, engineers, and practitioners in this field. Jurnal Teknik Sipil (Journal of Civil Engineering) Universitas Syiah Kuala publishes the scientific articles in area of civil engineering, as follows. Structural Engineering, Water Resources Engineering, Transportation Engineering, Geotechnical Engineering, Construction Engineering & Management, Urban Planning Geospatial and Geomatics Engineering, and Ocean Engineering
Articles 355 Documents
PERBANDINGAN KUAT TEKAN SILINDER TAK TERKEKANG DENGAN CONE INDEKS PADA TANAH DICAMPUR DENGAN SEMEN Khaizal Jamaluddin
JURNAL TEKNIK SIPIL Vol 3, No 2 (2014): Volume 3, Nomor 2, Januari 2014
Publisher : Jurusan Teknik Sipil, Fakultas Teknik, Universitas Syiah Kuala

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Since 1981, Indian geotechnical expert have been introduced shear strength of soil is cone index (CI). Recently, common existing shear strength index in soil mechanic studies such as N-SPT, qc-CPT.However, the cone index (CI) parameter till in this time not yet been made by standard of the testing of soil sample in the soil mechanics laboratory. Pursuant to this problem, we have correlated cone index (CI) with unconfined compression strength (qu). The research used two  measurement are unconfined compression and penetration ofcone bar silinder into soil sample. Diameter cone bar penetration is 0.5 cm, high 7 cm and cone angle part of 60 degree. The soil samples for research from Indrapuri sub district, Aceh Besar. For strength variation soil sample mixed cement with content 0%, 3%, 6% and 9% with waiting periode of samples 0, 2 and 4 days. The results of research showed good and strong correlation between cone index (CI) and unconfined compression strength (qu). Parameters with R2 80% from linear comparison.
ANALISIS FAKTOR-FAKTOR PEMBENGKAKAN BIAYA (COST OVERRUN) YANG BERPENGARUH TERHADAP KETIDAKPASTIAN BIAYA (CONTINGENCY COST) PADA PROYEK IRIGASI DI KABUPATEN ACEH BESAR Bima Risandi; Masimin Masimin; Anita Rauzana
JURNAL TEKNIK SIPIL Vol 1, No 2 (2017): Volume 1 Special Issue, Nomor 2, Desember 2017
Publisher : Jurusan Teknik Sipil, Fakultas Teknik, Universitas Syiah Kuala

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Abstract: The success of carrying out construction projects on time with an appropriate budget plan goals and expectations are project owners and contractors. But in fact frequently encountered problems emergence of cost overrun in construction projects during the implementation phase of the work, which is caused by several factors. To minimize the occurrence of the value of cost overrun on the next project, then each factor should be considered properly or always considered ditahap initial estimate, so it can be prevented or avoided. The purpose of this study was to analyze the dominant factor causes of cost overrun on irrigation projects, as well as to analyze the relationship and influence between the factors of cost overrun on contingency cost on irrigation projects in the district of Aceh Besar. Irrigation projects is observed which has been completed from 2010-2015. This study used interviews and questionnaires aimed to contractors in irrigation, ranging from qualifying K3, M1, M2 and B1. Total population gained as much as 46 contractors, through the equation Slovin the study sample was obtained as many as 32 contractors. The results showed that the dominant factor in the cause of the irrigation project cost overrun due to factors estimate, with a mean value of 4.397. Relationship factors toward contingency cost overrun on the cost of irrigation projects that have a relationship quite a factor of project documents with Pearson correlation coefficient between 0.400-0.700. Factors influence the cost overrun contingency cost on irrigation projects, the most influential factor is the project document, with a regression coefficient of 0.059.Abstrak: Keberhasilan melaksanakan proyek konstruksi tepat waktu dengan anggaran yang sesuai rencana adalah sasaran dan harapan pemilik proyek maupun kontraktor. Namun pada kenyataannya sering dijumpai permasalahan munculnya cost overrun pada proyek konstruksi selama tahap pelaksanaan pekerjaan, yang disebabkan oleh beberapa faktor. Untuk meminimumkan terjadinya nilai cost overrun pada proyek berikutnya, maka hendaknya setiap faktor diperhatikan dengan baik atau selalu dipertimbangkan ditahap estimasi awal, sehingga dapat dicegah atau dihindari. Tujuan penelitian ini adalah untuk menganalisis faktor dominan penyebab terjadinya cost overrun pada proyek irigasi, serta untuk menganalisis hubungan dan pengaruh antara faktor-faktor cost overrun terhadap contingency cost pada proyek irigasi di Kabupaten Aceh Besar. Proyek irigasi yang diamati adalah yang telah selesai dilaksanakan mulai dari tahun 2010-2015. Penelitian ini menggunakan wawancara dan kuesioner yang ditujukan kepada kontraktor bidang irigasi, mulai dari kualifikasi K3, M1, M2 dan B1. Jumlah populasi diperoleh sebanyak 46 perusahaan kontraktor, melalui persamaan Slovin maka sampel penelitian diperoleh sebanyak 32 kontraktor. Hasil penelitian menunjukkan bahwa faktor dominan penyebab terjadinya cost overrun proyek irigasi disebabkan faktor estimasi, dengan nilai mean sebesar 4,397. Hubungan faktor-faktor cost overrun terhadap contingency cost pada proyek irigasi yang mempunyai hubungan cukup adalah faktor dokumen proyek dengan nilai koefisien korelasi Pearson antara 0,400-0,700.  Pengaruh faktor-faktor cost overrun terhadap contingency cost pada proyek irigasi, yang paling berpengaruh adalah faktor dokumen proyek, dengan nilai koefisien regresi sebesar 0,059.
Hubungan Kuat Tekan, Tarik Belah, dan Tarik Lentur Beton dengan Bahan Tambah akibat Penggunaan Metode Perencanaan Campuran yang Berbeda Abdullah, Nora; Ranian, Cut; Hardi, Ivan; Kurniawan, Kurniawan; Syauki, Mukhayar
JURNAL TEKNIK SIPIL Vol 11, No 2 (2022): Volume 11 Nomor 2 November 2022
Publisher : Jurusan Teknik Sipil, Fakultas Teknik, Universitas Syiah Kuala

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24815/jts.v11i2.25820

Abstract

Due to the difference in concrete mix design method that applied in Standar Nasional Indonesia, SNI (Indonesian National Standard) in the last 25 years, which SNI 03-2834-2000 is adopted from DOE method and SNI 7656-2021 is adopted from ACI 211.1 methods, it is important to understand what is the relationship between concrete compressive strength with its tensile strength (splitting and flexural tensile strength) especially if there is an admixture applied in the concrete mixture. To study this relationship, specimens for each water cement ratio (0,35; 0,40; and 0,45) and super plasticizer dosage (0; 0,4 liter/100 kg PC; and 0,6 liter/100 kg PC) were prepared for compressive strength, splitting, and flexural tensile strength tests at 28 days. The main factor that affected concrete strength both for ACI 211.1 or DOE concrete mix design method is the aggregate composition. The results showed that the splitting tensile strength and the flexural tensile strength of concrete in this research is 4%-15% and 6%-21% of compressive strength, respectively. The decreasing trend of concrete compressive strength as the increasing of the water cement ration complied the general rule. While the increasing of super plasticizer dosage shows inclination trend of the compressive strength. However, the splitting and failure tensile strength shows different trend for interaction of concrete mixed design with super plasticizer dosage or with water cement ratio. In addition, the compressive strength to splitting tensile strength or flexural strength relationship in this research shows the similar trend with the ACI 318 and CEB-FIP codes but the compressive strength is less compare to both codes.
KAJIAN PENYEBAB DAN DAMPAK COST OVERRUN PADA PROYEK JALAN DAN JEMBATAN DI PROVINSI ACEH Mubarak Mubarak; Muhammad Isya; Pinta Sari
JURNAL TEKNIK SIPIL Vol 2, No 2 (2013): Volume 2, Nomor 2, januari 2013
Publisher : Jurusan Teknik Sipil, Fakultas Teknik, Universitas Syiah Kuala

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Abstract:Implementation of a construction project faced on many constraints, either within measurement of planning or without measurement of planning.  The constraints have caused holding off for construction project. One of major implication is additional cost needed to complete the project (cost overrun). Based on the problem, the research is aimed to identify the factor that could cause cost overrun, include its implication on highway and bridge construction project in Province of Aceh. The research uses a set of quetionnaire that range non-small qualification of 35 general contractors and 35 consultants. Analysis is accompanied by using some statistic tools; consist of frequency analysis, Relative Important Index (RII) Analyses and Spearman Rank Correlation Analysis. Based on analyses, the research found that the main cause factor of cost overrun are lack of financial controlling, change of design, shortage of material, and change of  material price. lack of  cost  planning and monitoring, lack of equipment, unclear specification, weather condition, insufficient price estimation and high wage labor. Furthermore, the main implication correlated to cost overrun in general are  additional cost , following by contract addendum , and delay to some construction activities.Keywords : cost overrun, project,highway and brideAbstrak: Pelaksanaan pekerjaan proyek konstruksi banyak menemui kendala, baik kendala yang sudah diperhitungkan, maupun yang di luar perhitungan perencana. Kendala itu menjadi penyebab terhambatnya pekerjaan proyek. Salah satu dampak yang timbul adalah tambahan biayapekerjaan proyek (cost overrun).Untuk melihat lebih jauh permasalahan tersebut, penelitian ini ditujukan untuk mengidentifikasi faktor-faktor apa saja yang menjadi penyebab utama dari cost overrunbeserta dampak yang sering ditimbulkannya. Objek konstruksi yang menjadi perhatian adalah proyek konstruksi jalan dan jembatan di Provinsi Aceh. Penelitian ini menggunakan data primer  yang diperoleh dengan cara menyebarkan kuesioner kepada 35 kontraktor dan 35 konsultan berkualifikasi non kecil yang pernah mengalami permasalahan cost overrun dan time overrun untuk jenis pekerjaan yang ditinjau.  Kajian dilakukan menggunakan pendekatan statistik seperti analisis frekuensi, analisis Relative Importance Index (RII) dan analisis korelasi Spearman Rank.Hasil analisis menunjukkan bahwa penyebab utama cost overrundidominasi oleh faktor tidak adanya kontrol keuangan, perubahan desain, kekurangan bahan, dan kenaikan harga material. Lebih jauh, hasil kajian mengidentifikasi sejumlah dampak umum terjadi dalam bentuk bertambahnya biaya pelaksanaan, diikuti dengan addendum kontrak dan penundaan sejumlah pekerjaan (delay).Kata kunci : cost overrun, proyek, jalan dan jembatan
DISTRIBUSI GESER DALAM PADA BALOK BETON BERTULANG MUTU TINGGI DENGAN PENAMBAHAN SERAT KAWAT BENDRAT Fitri, Yarmiza Anggriyani; Aulia, Teuku Budi; Saidi, Taufiq
JURNAL TEKNIK SIPIL Vol 1, No 4 (2018): Volume 1 Special Issue, Nomor 4, Februari 2018
Publisher : Jurusan Teknik Sipil, Fakultas Teknik, Universitas Syiah Kuala

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24815/jts.v1i4.10047

Abstract

Abstract: The development and progress of the world quite rapidly accrue followed by a large number of the population led to an increase in the outstanding in the use of concrete. Concrete is widely used in the construction of the building works and means of transportation such as bridges, highways and other worksBasically the concrete has a high compressive strength, but had the ability to wiht stand the tensile and shear forcew low. This can be fixed by added a fibber on mortar concrete. The addition of fiber for decreasing the brittle and improving the survival of crack early (first crack) is a concrete it can be reached by adding polypropylene fiber, bendrat wire fiber and rubber tiress fiber. The purpose of this research is to observe the shear behavior of reinforced concrete beam with fiber is polypropylene fiber (PP), bendrat wire fiber and used rubber tiress. In this study 4 beams tested with measuring 15 x 30 x 220 cm each fiber type has a beam specimen and a beam specimen without the addition of fiber. Specimens designed for shear failure. The result showed all the beams are having shear failure as planned. Cement water factor (FAS) 0.25, bendrat wire fiber with a percentage of 2% of the volume of the concrete. The results showed a beam experiencing failed to slide as planned. The test results showed a beam BMT with the addition of fiber has a maximum load 26.03 tonnes, the first cracks occur on the load 5.10 tons. Beam with wire bendrat maximum load wire BMT 27.41 T, the first cracks occur on the load 5.90 T. For the magnitude of the shear style capacity contributed by shear reinforcement constann for all beams this is 1.653 T, while for a capacity of sliding style concrete donated by each to BMT fiber without adding Vc = 4.52 T and fiber wire bendrat BMT value of Vc = 4.55 T.Abstrak: Perkembangan dan kemajuan dunia yang cukup pesat diikuti dengan bertambah banyaknya jumlah penduduk mengakibatkan terjadinya peningkatan yang menonjol dalam penggunaan beton. Beton digunakan secara luas pada pekerjaan-pekerjaan pembangunan gedung dan sarana-sarana transportasi misalnya jembatan, jalan raya serta pekerjaan-pekerjaan lainnya. Pada dasarnya beton memiliki kuat tekan yang tinggi, tetapi memiliki kemampuan menahan gaya tarik dan gaya geser yang rendah. Hal ini dapat diperbaiki dengan menambahkan serat pada adukan beton. Penambahan serat untuk mengurangi sifat getas dan meningkatkan ketahanan retak awal (first crack) beton yang dapat ditempuh salah satunya dengan menambahkan seratkawatbendrat, dan serat karet ban bekas dalam campuran beton. Tujuan dari penelitian ini adalah untuk mengamati perilaku geser balok beton bertulang mutu tinggi (BMT) menggunakan serat kawat bendrat. Pada pengujian ini diuji dua balok berukuran 15 x 30 x 220 cm, dengan satu balok tanpa penambahan serat dan satu balok jenis serat sebanyak satu benda uji didesain mengalami gagal geser. Faktor air semen (FAS) 0,25 serat kawat bendrat dengan persentase 2% dari volume beton. Hasil penelitian menunjukkan balok mengalami gagal geser sesuai yang direncanakan. Hasil pengujian menunjukkan balok BMT dengan penambahan serat memliki beban maksimum 26,03 ton, retak pertama terjadi pada beban 5,10 ton. Balok BMT kawat bendrat beban maksimumnya 27,41 ton, retak pertama terjadi pada beban 5,90 ton. Untuk besarnya kapasitas gaya geser yang disumbangkan oleh tulangan geser konstann untuk semua balok yaitu 1,653 ton, sedangkan untuk kapasitas gaya geser yang disumbangkan oleh beton masing- masing untuk BMT tanpa penambahan serat Vc = 4,52 ton dan beton BMT serat kawat bendrat nilai Vc = 4,55 ton.
PENGARUH KUALITAS PELAYANAN TERHADAP KEPUASAN PELANGGAN PADA PERUSAHAAN DAERAH AIR MINUM (PDAM) TIRTA MON PASE KABUPATEN ACEH UTARA Herri Affandi; Muhammad Zaki; Azmeri Azmeri
JURNAL TEKNIK SIPIL Vol 6, No 3 (2017): Volume 6, Nomor 3, Mei 2017
Publisher : Jurusan Teknik Sipil, Fakultas Teknik, Universitas Syiah Kuala

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Abstract: This study aims to analyze service quality factors that most influence on customer satisfaction, analyzing the impact of service quality on customer satisfaction partially and simultaneously, and to analyze the relationship between service quality to customer satisfaction at PDAM Tirta Mon Pase partially. This research was conducted by a questionnaire survey on customers active and non-active from the taps located on the IPA Geudong, WTP Deep Well, WTP Cot Girek, WTP Ocean, WTP Krueng Pase, WTP Glee Trade, WTP Lhoksukon 1, WTP Lhoksukon 2, and WTP Sawang 2. The results showed that service quality factors that most influence on customer satisfaction PDAM Tirta Mon Pase is showing seriousness, with a regression coefficient of 0.154. Factors partially quality of service that has an influence on customer satisfaction PDAM Tirta Mon Pase is a factor trustworthy, responsive factors, and factors indicate the seriousness with tcount ttable and sig. 0.05. Service quality factors simultaneously all have an influence on customer satisfaction PDAM Tirta Mon Pase with a value of Fcount Ftable and sig. 0.05 is 166.677 2.26 and 0.000 0.05. The relationship between service quality to customer satisfaction PDAM Tirta Mon Pase for service factors are real, trustworthy factors, and factors may ensure having high relationship partially with Pearson correlation coefficient values between 0.600 to 0.799, while the factor responsive and demonstrates its seriousness factor has very high correlation partially with Pearson correlation coefficient values between 0.800 to 1.000. Abstrak: Penelitian ini bertujuan untuk menganalisis faktor kualitas pelayanan yang paling berpengaruh terhadap kepuasan pelanggan, menganalisis pengaruh kualitas pelayanan terhadap kepuasan pelanggan secara parsial dan secara simultan, serta menganalisis hubungan antara kualitas pelayanan terhadap kepuasan pelanggan pada PDAM Tirta Mon Pase secara parsial. Penelitian ini dilakukan dengan survei kuesioner pada pelanggan aktif dan non aktif dari PDAM yang bertempat pada IPA Geudong, IPA Sumur Dalam, IPA Cot Girek, IPA Samudera, IPA Krueng Pase, IPA Glee Dagang, IPA Lhoksukon 1, IPA Lhoksukon 2, dan IPA Sawang 2. Hasil penelitian menunjukkan bahwa faktor kualitas pelayanan yang paling berpengaruh terhadap kepuasan pelanggan PDAM Tirta Mon Pase adalah menunjukkan kesungguhan, dengan nilai koefisien regresi sebesar 0,154. Faktor-faktor kualitas pelayanan secara parsial yang mempunyai pengaruh terhadap kepuasan pelanggan PDAM Tirta Mon Pase adalah faktor dapat dipercaya, faktor bersikap tanggap, dan faktor menunjukkan kesungguhan dengan nilai thitung ttabel dan sig. 0,05. Faktor-faktor kualitas pelayanan secara simultan semuanya mempunyai pengaruh terhadap kepuasan pelanggan PDAM Tirta Mon Pase dengan nilai Fhitung Ftabel dan sig. 0,05 yaitu 166,677 2,26 dan 0,000 0,05. Hubungan antara kualitas pelayanan terhadap kepuasan pelanggan PDAM Tirta Mon Pase untuk faktor pelayanan bersifat nyata, faktor dapat dipercaya, dan faktor dapat menjamin mempunyai hubungan yang tinggi secara parsial dengan nilai koefisien korelasi Pearson antara 0,600-0,799, sementara faktor bersikap tanggap dan faktor menunjukkan kesungguhan mempunyai hubungan yang sangat tinggi secara parsial dengan nilai koefisien korelasi Pearson antara 0,800-1,000.
DESAIN PERKUATAN STRUKTUR BANGUNAN GEDUNG AKIBAT PERUBAHAN FUNGSI DAN UMUR BANGUNAN MENGGUNAKAN CFRP SHEET Hasan, Muttaqin; Mahlil, Mahlil; Mubarak, Azzaki
JURNAL TEKNIK SIPIL Vol 9, No 1 (2020): Volume 9 Nomor 1 Mei 2020
Publisher : Jurusan Teknik Sipil, Fakultas Teknik, Universitas Syiah Kuala

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24815/jts.v9i1.15945

Abstract

: Gedung Kantor Ikatan Guru Aceh pada Kantor Badan Kepegawaian Aceh ingin dirubah fungsinya menjadi Ge-dung Arsip, sehingga beban hidup yang akan bekerja menjadi lebih besar dari beban hidup desain. Disamping itu, gedung tersebut telah berumur 30 tahun, sehingga sudah terjadi degradasi kekuatan sebagian material pemben-tuk strukturnya. Berubahnya standar perencanaan struktur bangunan tahan gempa dari SNI 03-1726-1989 (standar pada saat desain) menjadi SNI 1726:2012 menyebabkan beban gempa yang bekerja pada struktur bangunan tersebut menjadi lebih besar. Oleh karena itu, struktur gedung tersebut perlu diperkuat sehingga mam-pu melayani beban yang bekerja pada saat ini. Untuk maksud ini, maka telah dilakukan pengukuran dimensi ele-men struktur dan pengujian kuat tekan beton pada elemen struktur kolom lantai satu, kolom lantai dua, balok lan-tai, pelat lantai dan ring balok menggunakan hammer test. Jumlah tulangan, arrangement tulangan serta diameter tulangan pada elemen struktur tersebut diukur menggunakan alat profometer. Berdasarkan hasil pengukuran dan pengujian tersebut dilakukan analisis untuk mendapatkan kekuatan tersedia dari balok lantai, pelat lantai, ring balok dan kolom. Berdasarkan beban yang bekerja pada saat ini, juga dilakukan analisis struktur untuk mendapatkan kekuatan perlu dari elemen struktur tersebut. Hasil analisis menunjukkan bahwa struktur bangunan tersebut tidak mampu melayani beban yang bekerja saat ini, sehingga dilakukan perkuatan struktur. Perkuatan struktur didesain dengan cara menggunakan externally wrapping system menggunakan material Carbon Fiber Reinforced Polymer (CFRP) sheet setebal 1,2 mm sebanyak satu lapis. Setelah dilakukan perkuatan struktur, ele-men struktur tersebut sudah cukup kuat melayani beban yang bekerja.
MODELING SAFETY PERFORMANCE FUNCTION (SPFs) USING POISON-GENERALIZED LINEAR MODEL Sugiarto Sugiarto
JURNAL TEKNIK SIPIL Vol 1, No 2 (2012): Volume 1, Nomor 2, Januari 2012
Publisher : Jurusan Teknik Sipil, Fakultas Teknik, Universitas Syiah Kuala

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Abstract: The generalized linear model-poison distribution was employed incorporating available geometric data, exposure, etc. The explanotary variables used were average annual daily traffic (AADT), length of segment, heavy vehicle percentage, median, availability of shoulder, number of acces, number of intersection, number of curve per km, and amount of rain fall in a year in two Major National Highways in Thailand. Maximum Likelihood Method (MLM) was used for determining of estimation parameters by using Statistical Package for the Social Sciences (SPSS) version 16. Poison regression models were selected for the model SPFs of the accident, fatality and injury with the total explained variation (RD2) on average 0.44%, 0.25%, and 0.36% respectively. The final of developed models can be used for identifying and analyzing of hazardous locations, prioritizing an effective maintenance strategy tool with the identified hazardous locations along the road section.Keywords: Generalized Linear Models (GLM), Safety Performance Function (SPFs), Maximum Likelihood Model (MLM), Poisson Regresion, Total Explained Variation, SPSS, Hazardous Locations.Abstrak: Distribusi Poison yang digeneralkan sebagai model linier digunakan dalam penelitian ini dengan mengakomodir data geometrik, parameter traffic (exposure), dan lainya. Parameter penjelas (explanotary) diambil di dua Jalan Raya (highway) utama di Thailand termasuk data didalamnya average annual daily traffic (AADT), panjang segmen yang ditinjau, persen kendarangan berat, jenis dan keberadaan median, jenis dan keberadaan bahu jalan, jumlah bukaan akses, jumlah persimpangan, jumlah kurva per km, dan nilai curah hujan per tahun. Metode Maximum Likelihood Model (MLM) digunakan untuk mendeterminasi parameter estimasi model dengan bantuan perangkat lunak SPSS (Statistical Package for the Social Sciences) versi 16. Hasil regresi menggunakan distribusi poison digunakan sebagai model keselamatan untuk model jumlah kecelakaan, kematian, dan luka-luka. Katagori pemilihan model terbaik berdasarkan nilai total explained variation (RD2) yang berturut-turut dengan nilai rata-rata 0.44%, 0.25%, and 0.36% utuk model jumlah kecelakaan, kematian, dan luka-luka. Hasil final model dapat digunakan untuk identifikasi dan analisis segment rawan kecelakan, dan juga dapat digunakan untuk menganalisis prioritas penanganan daerah rawan kecelakaan yang telah teridentifikasi.Kata Kunci: Generalized Linear Models (GLM), Model Keselamatan Lalulintas, Maximum Likelihood Model (MLM), Poisson Regresion, Total Explained Variation, SPSS, Rawan kecelakaan.
TINJAUAN NILAI WAKTU PERJALANAN dan manfaat JALAN ALTERNATIF SIMPANG WER LAH – SIMPANG LANCANG DIBANDINGKAN DENGAN JALAN EKSISTING SIMPANG WER LAH – TAJUK ENANG-ENANG KAB. BENER MERIAH Mudji Burrahman; Sofyan M. Saleh; Muhammad Isya
JURNAL TEKNIK SIPIL Vol 1, No 2 (2017): Volume 1 Special Issue, Nomor 2, Desember 2017
Publisher : Jurusan Teknik Sipil, Fakultas Teknik, Universitas Syiah Kuala

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Abstract: The increasing of the community needs to land transport, can increase the amount of traffic volume, traffic congestion, and compounded by the growing of traffic accidents in particular on roads Tajuk Enang-Enang-Simpang Lancang Bener Meriah Regency with a length of 9.1 km. Traffic accidents caused by small minimum bend radius so large centrifugal force, the distance of a short, and a maximum flatness. To minimise these problems, it is necessary a new alternative way specified. The alternative way Sp. Wer Lah – Sp. Lancang in length 8.3 km and was built by the BRR in 2008 with a length of 5 km, while the rest was still roughness pavement. This research for the evaluation of the benefits and car time value (consumer surplus) feasibility are reviewed based on the Net Present Value (NPV), Benefit Cost Ratio (BCR) and Economic Internal Rate Return (EIRR) with a discount rate of 10%, 12% and 15%. It is assumed the transition of traffic from existing roads to the alternative 40%. The results showed there is a difference between the value of car time value from both the road at IDR 687/km for passenger cars, IDR 2,428/km for buses, and trucks amounting to IDR 1,962/km. passenger car time value difference of IDR 8.256/hours, Bus IDR 54.359/hours, trucks amounted to IDR 5.805/hours. Based on the economic evaluation of road construction in year 14 or 22 year (2030) since the road opened already meet the standards of economic feasibility with the discount rate 10% obtained the value of BCR 2.02, NPV IDR 52.391.076.702. At a discount rate of 12% obtained the value of BCR 1.55, NPV IDR 27.557.016.970. and at a discount rate of 15% obtained the value of BCR 1.05, NPV IDR 2.569.578.248. EIRR obtained at discount rate 15.41% (NPV = 0).Abstrak: Meningkatnya kebutuhan masyarakat akan sarana transportasi darat, dapat meningkatkan volume lalu lintas, kemacetan, serta diperparah dengan meningkatnya angka kecelakaan lalu lintas. Hal ini terjadi bukan hanya pada ruas-ruas  jalan di perkotaan saja, tetapi juga pada jalan luar kota yang berada diperbukitan atau dipergununggan, salah satunya ruas jalan tersebut adalah Tajuk Enang-Enang - Simpang Lancang Kabupaten Bener Meriah dengan panjang 9,1 km. Jalan  Tajuk Enang-Enang – Simpang Lancang membutuhkan waktu tempuh yang lebih lama, karena pada ruas ini didominasi oleh tanjakan, tikungan dan turunan, sehingga dapat membutuhkan waktu yang lama ketika melintasi ruas jalan ini. Untuk meminimalisir permasalahan tersebut, maka perlu ditentukan jalan alternatif yang baru. Jalan alternatif tersebut diawali dari Simpang Wer Lah – Simpang Lancang yang memiliki panjang 8,3 km dan telah dibangun oleh Badan Rehabilitasi dan Rekonstruksi (BRR) tahun 2008 dengan panjang jalan 5 km, sedangkan sisanya masih perkerasan berbutir. Penelitian ini untuk evaluasi nilai waktu dan manfaat berdasarkan consumer surplus berdasarkan Net Present Value (NPV), Benefit Cost Ratio (BCR) dan Economic Internal Rate Return (EIRR) dengan discount rate 10%, 12% dan 15%. Diasumsikan peralihan lalu lintas dari jalan eksisting ke jalan alternatif sebesar 40% pada tahun pertama jalan dibuka. Hasil penelitian menunjukkan bahwa terdapat selisih nilai waktu mobil penumpang sebesar Rp. 8.256/jam, Bus sebesar Rp. 54.359/jam, truk sebesar Rp. 5.805/jam. Berdasarkan evaluasi ekonomi pembangunan jalan pada tahun ke 14 atau tahun 22 (2030) sejak jalan dibuka sudah memenuhi standar kelayakan ekonomi dengan discount rate 10% diperoleh nilai BCR 2,02, NPV Rp. 52.391.076.702,-. Pada discount rate 12% diperoleh nilai BCR 1,55, NPV Rp. 27.557.016.970,- dan pada discount rate 15% diperoleh nilai BCR 1,05, NPV Rp. 2.569.578.248,-. EIRR diperoleh pada discount rate 15,41% (NPV = 0).
PENGARUH QUALITY MANAGEMENT TERHADAP DAYA SAING KONTRAKTOR PADA PROYEK KONSTRUKSI GEDUNG DI KOTA BANDA ACEH Nya' Munanta; Muttaqin Hasan; Hafnidar A. Rani
JURNAL TEKNIK SIPIL Vol 6, No 1 (2016): Volume 6, Nomor 1, September 2016
Publisher : Jurusan Teknik Sipil, Fakultas Teknik, Universitas Syiah Kuala

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Abstract: This study aims to identify the dominant factors to implement quality management, and analyze the relationship and influence between the factors of the application of quality management for the competitiveness of the building contractors on construction projects in the city of Banda Aceh. The project is observed that the building construction project has been completed in the city of Banda Aceh from 2005-2015. Based on data from Construction Services Development Board (LPJK) 2016 Aceh province, the population number obtained by 102 contractors. Through equation Slovin the study sample was obtained by 51 contractors. The dominant factor in the application of quality management kosntruksi building project in the city of Banda Aceh is a factor of decision making and problem solving, with a mean value of 4.355. The relationship between the factors to implement quality management for the competitiveness contractor on the project of construction of buildings in Banda Aceh is training factors, factors focus on the customer, factors benchmarking, factor of continuous improvement, and the factor of participation and empowerment of employees have a relationship that is very high partially with Pearson correlation coefficient values 0,900. Influence factors of quality management for the competitiveness of the building contractors on construction projects in the city of Banda Aceh, the most influential factor is the participation and empowerment of employees, with a regression coefficient of 1.170. This suggests that if an enhanced employee engagement and empowerment, while the other factors constant, the competitiveness of the building contractor on construction projects in the city of Banda Aceh will increase. Abstrak: Penelitian ini bertujuan untuk mengidentifikasi faktor dominan penerapan quality management, dan menganalisis hubungan serta pengaruh antara faktor-faktor penerapan quality management terhadap daya saing kontraktor pada proyek konstruksi gedung di Kota Banda Aceh. Proyek yang diamati adalah proyek konstruksi gedung yang telah selesai dilaksanakan di Kota Banda Aceh mulai dari tahun 2005-2015. Berdasarkan data dari Lembaga Pengembangan Jasa Konstruksi (LPJK) Provinsi Aceh Tahun 2016, jumlah populasi diperoleh sebanyak 102 kontraktor. Melalui persamaan Slovin maka sampel penelitian diperoleh sebanyak 51 kontraktor. Faktor dominan penerapan quality management pada proyek konstruksi gedung di Kota Banda Aceh adalah faktor pengambilan keputusan dan pemecahan masalah, dengan nilai mean sebesar 4,355. Hubungan antara faktor-faktor penerapan quality management terhadap daya saing kontraktor pada proyek konstruksi gedung di Kota Banda Aceh adalah faktor pelatihan, faktor fokus pada pelanggan, faktor benchmarking, faktor perbaikan berkesinambungan, dan faktor pelibatan dan pemberdayaan karyawan mempunyai hubungan yang sangat tinggi secara parsial dengan nilai koefisien korelasi Pearson 0,900. Pengaruh faktor-faktor quality management terhadap daya saing kontraktor pada proyek konstruksi gedung di Kota Banda Aceh, yang paling berpengaruh adalah faktor pelibatan dan pemberdayaan karyawan, dengan nilai koefisien regresi sebesar 1,170. Hal ini menunjukkan bahwa apabila faktor pelibatan dan pemberdayaan karyawan ditingkatkan, sedangkan faktor-faktor lainnya tetap, maka daya saing kontraktor pada proyek konstruksi gedung di Kota Banda Aceh akan semakin meningkat.

Page 8 of 36 | Total Record : 355


Filter by Year

2011 2025


Filter By Issues
All Issue Vol 14, No 2 (2025): Volume 14 Nomor 2 November 2025 Vol 14, No 1 (2025): Volume 14 Nomor 1 Mei 2025 Vol 13, No 2 (2024): Volume 13 Nomor 2 November 2024 Vol 13, No 1 (2024): Volume 13 Nomor 1 Mei 2024 Vol 12, No 2 (2023): Volume 12 Nomor 2 November 2023 Vol 12, No 1 (2023): Volume 12 Nomor 1 Mei 2023 Vol 11, No 2 (2022): Volume 11 Nomor 2 November 2022 Vol 11, No 1 (2022): Volume 11 Nomor 1 Mei 2022 Vol 10, No 2 (2021): Volume 10 Nomor 2 November 2021 Vol 10, No 1 (2021): Volume 10 Nomor 1 Mei 2021 Vol 9, No 2 (2020): Volume 9, Nomor 2, November 2020 Vol 9, No 1 (2020): Volume 9 Nomor 1 Mei 2020 Vol 8, No 2 (2019): Volume 8, Nomor 2, November 2019 Vol 8, No 1 (2019): Volume 8, Nomor 1, Mei 2019 Vol 7, No 2 (2018): Volume 7, Nomor 2, November 2018 Vol 7, No 1 (2018): Volume 7, Nomor 1, Mei 2018 Vol 1, No 4 (2018): Volume 1 Special Issue, Nomor 4, Februari 2018 Vol 1, No 3 (2018): Volume 1 Special Issue, Nomor 3, Januari 2018 Vol 6, No 3 (2017): Volume 6, Nomor 3, Mei 2017 Vol 6, No 2 (2017): Volume 6, Nomor 2, Januari 2017 Vol 1, No 2 (2017): Volume 1 Special Issue, Nomor 2, Desember 2017 Vol 1, No 1 (2017): Volume 1 Special Issue, Nomor 1, September 2017 Vol 6, No 1 (2016): Volume 6, Nomor 1, September 2016 Vol 5, No 3 (2016): Volume 5, Nomor 3, Mei 2016 Vol 5, No 2 (2016): Volume 5, Nomor 2, Januari 2016 Vol 4, No 3 (2015): Volume 4, Nomor 3, Mei 2015 Vol 3, No 2 (2014): Volume 3, Nomor 2, Januari 2014 Vol 3, No 1 (2013): Jurnal Teknik Sipil Volume 3, Nomor 1, September 2013 Vol 2, No 2 (2013): Volume 2, Nomor 2, januari 2013 Vol 2, No 3 (2013) Vol 2, No 1 (2012): Volume 2, Nomor 1, September 2012 Vol 1, No 3 (2012): Volume 1, Nomor 2, Mei 2012 Vol 1, No 2 (2012): Volume 1, Nomor 2, Januari 2012 Vol 1, No 1 (2011): Volume 1, Nomor 1, September 2011 More Issue