cover
Contact Name
Yulizar Widiatama
Contact Email
yulizar.w@upnvj.ac.id
Phone
+6281218362823
Journal Mail Official
joseon@upnvj.ac.id
Editorial Address
Fakultas Teknik UPN Veteran Jakarta Gedung Fakultas Teknik Kampus Limo Jl. Raya Limo Kecamatan Limo, Kota Depok Jawa Barat 16515 Indonesia
Location
Kota depok,
Jawa barat
INDONESIA
Journal of Optimization System and Ergonomy Implementation
ISSN : -     EISSN : 30467934     DOI : https://doi.org/10.54378/joseon.v1i1
Journal of Optimization System and Ergonomy Implementation (JOSEON) merupakan publikasi ilmiah berkala yang diperuntukkan bagi peneliti yang hendak mempublikasikan hasil penelitiannya dalam bentuk studi literatur, penelitian, dan pengembangan teknologi sebagai bentuk penerapan metode, algoritma, maupun kerangka kerja. Jurnal ini pertama kali terbit pada Oktober 2023, dimana setiap JOSEON saat ini sedang menguruskan ISSN dan e-ISSN Bagi para pengarang atau author dari luar UPN Veteran Jakarta, silahkan untuk melakukan registrasi pada OJS ini JOSEON menyambut hangat para peneliti, dosen, lembaga penelitian, pemerintah lembaga, atau industri untuk berkolaborasi dalam rangka menghasilkan makalah penelitian, ulasan artikel atau kasus studi mengenai Fokus dan Ruang Lingkup sebagai berikut: Sistem Produksi Sistem kerja dan Ergonomi Pengembangan Produk Manajemen Logistik dan Rantai Pasok Pengendalian Kualitas Manajemen Rekayasa dan Optimalisasi Industri Seluruh artikel yang masuk akan dilakukan proses Blind Review, dan akan dilakukan oleh dua mitra bestari kami sesuai dengan kompetensinya. JOSEON Dipublikasikan secara berkala sebanyak 2 Terbitan setahun. Manuskrip dapat disiapkan dalam bahasa Indonesia maupun Inggris. Makalah yang disubmit harus memiliki paling sedikit 6 halaman hingga paling banyak 8 halaman
Articles 37 Documents
Optimalisasi Biaya Persediaan Bahan Baku Ijuk Dengan Pendekatan Metode Economic Order Quantity di UMKM Rinjanni Ciamis andriani; Tri Ngudi Wiyatno
Journal of Optimization System and Ergonomy Implementation Vol 3 No 02 (2025): Journal of Optimization System and Ergonomy Implementation
Publisher : Program Studi Teknik Industri S-1, Fakultas Teknik UPN Veteran Jakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Material inventory plays an important role in supply chain management because it affects the continuity of the production process and the quality of the products produced. The main problem faced by UMKM Rinjanni Ciamis is the high cost of inventory due to excessive ordering frequency. In addition, this UMKM has not implemented reorder points or safety stock as part of inventory control. One method that can be used to reduce total inventory costs is Economic Order Quantity (EOQ). The EOQ method is a mathematical approach that aims to determine the optimal order quantity so that total inventory costs, both ordering and storage costs, can be minimized. Based on the calculations, the total inventory costs of this UMKM using the conventional method were Rp 4.422.000, while the application of the EOQ method reduced the costs to Rp 278.795, resulting in savings of 94% or Rp 4.143.205. In addition, the EOQ method was also able to determine a safety stock of 258 kg and a reorder point of 790 kg, whereas in the previous conventional method, these two parameters had not been applied. Thus, the application of EOQ can improve inventory control efficiency and reduce operational costs at UMKM Rinjanni Ciamis.
Perancangan Model Bisnis Usaha Washer Car Wash Tebet Berbasis Product-Service System (PSS) Khansa Zhafira Fitri; Nanang Alamsyah; Mohammad Rachman Waluyo; Wendy Febrianty Mardhiyah
Journal of Optimization System and Ergonomy Implementation Vol 3 No 02 (2025): Journal of Optimization System and Ergonomy Implementation
Publisher : Program Studi Teknik Industri S-1, Fakultas Teknik UPN Veteran Jakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

This study aims to design a business model for Washer Car Wash in Tebet using the Product-Service System (PSS) approach as a strategy to enhance competitiveness in the vehicle wash service industry. A descriptive qualitative method was employed through observations, questionnaires, and interviews with the business representative. The PSS analysis was conducted to identify the current business model (existing), desired development (desire), and the most feasible recommendation (eligible). The findings indicate that the current model operates as a pure service business, with development potential toward product related service and pay per service unit. Based on the quadrant analysis, product pooling emerges as the most feasible development, implemented through the concept of a “One Stop Care Hub” that integrates multiple automotive services within a single location. This recommendation is expected to enhance customer value, operational efficiency, and the competitive positioning of Washer Car Wash.
Analisis Kuantitatif Kepuasan Kerja Karyawan: Studi Kasus di PT. XYZ Aulia Syakilla Luhulima; Hafiza Aprilia; Wendy Febrianty Mardhiyah; Nanang Alamsyah
Journal of Optimization System and Ergonomy Implementation Vol 4 No 01 (2026): Journal of Optimization System and Ergonomy Implementation
Publisher : Program Studi Teknik Industri S-1, Fakultas Teknik UPN Veteran Jakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.54378/joseon.v4i01.13754

Abstract

Employee job satisfaction is an important factor in supporting employee performance and organizational effectiveness. This study quantitatively analyzes employee job satisfaction in a case study of PT. XYZ using ten indicators: Quality of Work, Knowledge of Job, Productivity, Adaptability, Dependability, Judgment, Initiative and Resourcefulness, Leadership Qualities, Interpersonal Relations, and Performance. Eight respondents rated each indicator on a five-point scale, giving 80 ratings. The analysis comprised descriptive statistics, classification into five satisfaction categories, a satisfaction index, item validity (corrected item-total correlation), reliability (Cronbach's alpha), a one-sample test against the neutral midpoint, and a Friedman test across indicators. The overall mean score was 3,80 (SD = 0,93; satisfaction index 76,0%), which falls in the high category, and 70,0% of the ratings were 4 or 5. Knowledge of Job had the highest mean (4,25) and Interpersonal Relations the lowest (3,50). Respondent means ranged from 2,10 to 4,70, so satisfaction was not uniform. All ten indicators met the item-total criterion (r = 0,849-0,966 > 0,707) and the instrument was highly consistent (alpha = 0,978). Respondent scores exceeded the neutral midpoint (t(7) = 2,58, p = 0,037; Wilcoxon p = 0,047), although a sign-flip permutation test on the mean gave p = 0,063, so this evidence is borderline. The indicators differed significantly (Friedman chi-square(9) = 21,18, p = 0,012; Kendall's W = 0,29). Because the sample is very small and the sampling procedure is not documented, the findings are a descriptive baseline and should not be generalized.
Perencanaan Strategis untuk Peningkatan Kualitas di Sekolah Menengah Atas Negeri: Pendekatan Matriks SWOT, IFE–EFE–IE di SMAN 2 Tambun Selatan Fakhruddin Ilyasa; Hilmana Radhia Putera; Harditriyono Putra; Nanang Alamsyah
Journal of Optimization System and Ergonomy Implementation Vol 4 No 01 (2026): Journal of Optimization System and Ergonomy Implementation
Publisher : Program Studi Teknik Industri S-1, Fakultas Teknik UPN Veteran Jakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.54378/joseon.v4i01.15340

Abstract

This study aims to formulate a strategic plan for quality improvement at SMAN 2 Tambun Selatan. A qualitative descriptive method with a case study approach was applied; primary data were collected through interviews, observation, and documentation, while secondary data came from school reports and relevant literature, with validity maintained through source triangulation. Data were analyzed using the IFE, EFE, and IE Matrices and SWOT analysis, with factor weights and ratings based on informant judgment. The IFE score of 2,65 indicates a moderately strong internal condition, while the EFE score of 3,50 indicates a high capacity to respond to external factors, although the opportunity (1,75) and threat (1,74) scores are nearly balanced. The IE Matrix places the school in Cell II (growth and build), and the SWOT analysis positions it in Quadrant I (S–W = 0,93; O–T = 0,01), an aggressive, growth-oriented position. Accordingly, the SO (Strength–Opportunity) strategy is prioritized, leveraging teacher quality and learning facilities to capture opportunities through digital-based learning, supported by WO, ST, and WT strategies. This study contributes an application of the integrated IFE–EFE–IE–SWOT framework to a public high school as an evidence-based reference for sustainable school quality improvement. 
Analisis Prioritas Peningkatan Kepuasan Kerja Menggunakan Importance–Performance Analysis (IPA) Ali Hidayahtullah; Amenda Septiala Tarigan; Nanang Alamsyah; Tyas Eka Kurnia
Journal of Optimization System and Ergonomy Implementation Vol 4 No 01 (2026): Journal of Optimization System and Ergonomy Implementation
Publisher : Program Studi Teknik Industri S-1, Fakultas Teknik UPN Veteran Jakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.54378/joseon.v4i01.15378

Abstract

In the highly competitive landscape of the industrial sector, maintaining high levels of job satisfaction is widely recognized as a fundamental driver for sustaining organizational performance and ensuring long-term employee retention. Consequently, this study empirically evaluates the current state of employee job satisfaction at PT XYZ. By employing the Importance-Performance Analysis (IPA) framework as a diagnostic tool, the research aims to scientifically identify and determine priority areas for strategic upgrades. Primary data were rigorously collected through structured questionnaires distributed to 12 employees, who were carefully selected using a purposive sampling technique to ensure relevance. Statistical validation was conducted, where validity and reliability tests confirmed the research instrument’s high internal consistency, yielding a coefficient greater than 0.90. The subsequent gap analysis highlights significant unmet expectations, specifically revealing positive gaps in attributes such as Dependability and Leadership Qualities, even though overall performance exceeded expectations in other domains. Crucially, the IPA Cartesian mapping locates the Dependability attribute within Quadrant I ("Concentrate Here") as the primary priority for improvement due to its high importance but lower satisfaction level. Meanwhile, Quality of Work and Productivity are located within Quadrant IV ("Possible Overkill"), indicating excess performance on attributes of comparatively lower importance. Although this research is constrained by its single-case scope and the absence of observational triangulation, it successfully contributes a practical, resource-efficient strategic roadmap. This framework assists management in optimizing human capital development by strictly focusing on critical deficits amidst limited organizational resources.
PENINGKATAN KINERJA SDM BERBASIS ANALISIS KEPUASAN KERJA MENGGUNAKAN IMPORTANCE PERFORMANCE ANALYSIS DI PT. XYZ Muhammad Abel; Amenda Septiala Tarigan; Nanang Alamsyah; Tyas Eka Kurnia
Journal of Optimization System and Ergonomy Implementation Vol 4 No 01 (2026): Journal of Optimization System and Ergonomy Implementation
Publisher : Program Studi Teknik Industri S-1, Fakultas Teknik UPN Veteran Jakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.54378/joseon.v4i01.15385

Abstract

The creative industry in Indonesia faces high turnover and burnout, particularly among Generation Z workers. This study analyzes job satisfaction at PT. XYZ, a creative agency in Jakarta, using Importance-Performance Analysis (IPA). Five creative-division employees who met predefined purposive-sampling criteria rated fourteen attributes, including workload, compensation, company policy, and supervisor support, on a 5-point Likert scale; demographics, standard deviations, and instrument validity and reliability are reported. Mean Importance (Y = 4.46) exceeded mean Performance (X = 3.99), and all fourteen attributes showed negative gaps (−0.20 to −1.20). With grand-mean cutoffs, Workload and Compensation fell into Quadrant I (Concentrate Here) with the largest gaps (−1.20 and −1.00); Quality of Work, Knowledge of Job, Interpersonal Relations, Performance, and Supervisor fell into Quadrant II; six attributes fell into Quadrant III and Judgement into Quadrant IV. A sensitivity analysis confirmed Workload and Compensation as Quadrant I under a median cutoff, while the placement of the other attributes depended on the cutoff. Management should prioritize workload and compensation, then formalize SOPs to address Dependability and Initiative and Resourcefulness. Findings are exploratory given the five respondents.
Evaluasi Kelayakan Finansial dan Perancangan Strategi Operasional pada Usaha Wisata Rongsok Depok Marieke Zenianti; Alina Cynthia Dewi; Intan Novita Dewi
Journal of Optimization System and Ergonomy Implementation Vol 4 No 01 (2026): Journal of Optimization System and Ergonomy Implementation
Publisher : Program Studi Teknik Industri S-1, Fakultas Teknik UPN Veteran Jakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.54378/joseon.v4i01.15580

Abstract

Wisata Rongsok Depok is a multi-category retail business dealing in used and refurbished goods that faces challenges such as fluctuations in monthly sales, high overhead costs, and a relatively high break-even point relative to revenue. This study aims to evaluate the business’s financial viability, identify factors affecting cash flow, and formulate business development strategies using the SWOT-AHP method. The research methods include cash flow analysis, calculations of Net Present Value (NPV), Payback Period (PP), Break-Even Point (BEP), and Minimum Attractive Rate of Return (MARR), sensitivity analysis of overhead cost increases of 5%, 10%, and 15%, as well as a prioritized SWOT analysis using the Analytic Hierarchy Process (AHP). The results indicate that the business is viable, with an NPV of Rp1.047.054.181 and a Payback Period of 6,71 months. All scenarios involving increases in overhead costs still yield a positive NPV and a relatively short Payback Period, although in the 15% scenario, the NPV drops to Rp870.566.157 and the Payback Period extends to 7,92 months. The SWOT-AHP analysis places the business in Quadrant I of the Grand Strategy Matrix, making the Strengths-Opportunities strategy the top priority to support sustainable business growth.

Page 4 of 4 | Total Record : 37