cover
Contact Name
Ardi Mardiana
Contact Email
aim@unma.ac.id
Phone
+6281212777182
Journal Mail Official
stima@unma.ac.id
Editorial Address
Jl. KH. Abdul Halim No. 103 Majalengka, Jawa Barat, Indonesia 45418
Location
Kab. majalengka,
Jawa barat
INDONESIA
SEMINAR TEKNOLOGI MAJALENGKA (STIMA)
Published by Universitas Majalengka
ISSN : 25283820     EISSN : 30260833     DOI : https://doi.org/10.31949/stima
Prosiding SEMINAR TEKNOLOGI MAJALENGKA (STIMA) adalah publikasi ilmiah yang memuat hasil-hasil penelitian orisinal dan terkini dari para akademisi, peneliti, dan praktisi di berbagai bidang teknik dan manajemen. Prosiding ini memiliki sifat multidisiplin, berfokus pada integrasi ilmu pengetahuan dari empat cabang utama: Teknik Industri, Teknik Sipil, Teknik Mesin, dan Informatika.
Articles 465 Documents
METODE PELAKSANAAN PEMASANGAN PCI GIRDER PADA JEMBATAN COLLECTOR ROW-15 KOTA BARU PARAHYANGAN Manu Imarwan; Yayat Hendrayana
SEMINAR TEKNOLOGI MAJALENGKA (STIMA) Vol 10 (2026)
Publisher : Universitas Majalengka

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

This paper discusses the implementation of Prestressed Concrete I-Girder (PCI Girder) installation on the Collector ROW-15 Bridge project in Kota Baru Parahyangan, West Bandung Regency. The bridge was developed to support connectivity within the growing residential area, with PCI Girder selected as the superstructure due to its high strength, consistent precast quality, and efficient installation process. This study aims to describe the installation stages, identify technical and non-technical factors influencing the work, and evaluate the effectiveness of the applied method in terms of quality, time, and safety. The research employed a field study combined with a literature review through direct observation, documentation, and interviews with the site engineer and contractor personnel. The installation process included truss launcher assembly, girder lifting using a mobile crane, manual launching across the truss launcher, and final placement on the bearing pad at the abutment. The findings indicate that the PCI Girder was installed according to the planned alignment and elevation without significant deviation. The main challenges consisted of adverse weather conditions and vegetation around the construction site, both of which were successfully managed without affecting the project schedule. Overall, the applied installation method proved effective in ensuring construction quality, schedule performance, and work safety, making it suitable for bridge projects with similar characteristics
ANALISIS PRODUKTIVITAS DIESEL HAMMER 1,8 TON MODIFIKASI EXCAVATOR SEBAGAI CARRIER PADA PEKERJAAN PEMANCANGAN DI PROYEK UMROH PARK KERTAJATI MAJALENGKA Yusan Nurul Septiyani; Arief Rijaluddin
SEMINAR TEKNOLOGI MAJALENGKA (STIMA) Vol 10 (2026)
Publisher : Universitas Majalengka

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Pekerjaan pemancangan merupakan salah satu tahapan penting dalam konstruksi yang berfungsi meneruskan beban struktur menuju lapisan tanah yang memiliki daya dukung memadai. Produktivitas alat pemancang menjadi salah satu indikator keberhasilan pelaksanaan proyek karena berpengaruh terhadap efisiensi waktu, biaya, dan mutu pekerjaan. Penelitian ini bertujuan menganalisis produktivitas alat diesel hammer 1,8 ton yang dimodifikasi menggunakan excavator sebagai carrier pada pekerjaan pemancangan tiang pancang di Proyek Umroh Park Kertajati, Kabupaten Majalengka. Penelitian menggunakan metode deskriptif kuantitatif dengan memanfaatkan data sekunder berupa daily report, piling record, dokumen teknis proyek, serta koefisien Analisa Harga Satuan Pekerjaan (AHSP). Kapasitas produksi dihitung berdasarkan koefisien AHSP kemudian dikalikan dengan faktor efisiensi kerja untuk memperoleh kapasitas efektif alat. Hasil analisis menunjukkan bahwa koefisien alat sebesar 0,0584 jam/m menghasilkan kapasitas teoritis sebesar 18 m/jam. Dengan faktor efisiensi kerja sebesar 0,83 diperoleh kapasitas efektif sebesar 14,94 m/jam. Berdasarkan waktu kerja efektif delapan jam per hari dan panjang segmen tiang 6 m, produktivitas alat mencapai sekitar 20 tiang per hari. Produktivitas aktual di lapangan dipengaruhi oleh kondisi alat, cuaca, karakteristik tanah, kemampuan operator, serta waktu yang dibutuhkan dalam proses penyambungan tiang pancang. Hasil penelitian menunjukkan bahwa penggunaan diesel hammer 1,8 ton yang dimodifikasi dengan excavator sebagai carrier merupakan alternatif yang efektif dalam mendukung pekerjaan pemancangan pada proyek dengan kebutuhan mobilisasi alat yang tinggi.
SISTEM INFORMASI PENDAFTARAN MANDIRI PELAKU EKONOMI KREATIF DENGAN AUTENTIKASI ONE-TIME PASSWORD (OTP) DI KABUPATEN MAJALENGKA Andhyka Rahmatullah; Ii Sopiandi
SEMINAR TEKNOLOGI MAJALENGKA (STIMA) Vol 10 (2026)
Publisher : Universitas Majalengka

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Majalengka Creative Center (MCC) is a crucial hub for creative economy actors. Currently, the registration and data management processes at MCC are still conducted manually, causing inefficiencies, data redundancy, and slow reporting. This study aims to design and implement a web-based Independent Registration Information System for Creative Economy Actors in Majalengka Regency. The primary novelty of this research is the integration of an email-based One-Time Password (OTP) authentication algorithm to ensure data integrity and prevent fictitious registrations. The system development methodology uses the SDLC Waterfall model, encompassing requirement analysis, system design, implementation, and testing. It was built using PHP, MySQL, HTML, CSS, and JavaScript, with UML for system modeling. The outcome is a functional web-based registration system enabling creative economy actors to register independently online, strongly secured by OTP verification. Furthermore, it provides an admin dashboard for MCC staff to efficiently verify data, manage users, and generate PDF reports. Blackbox testing results confirm that all functional requirements are successfully met. Ultimately, this system optimizes MCC's operational workflows, ensuring secure and accurate data management.
PERANCANGAN MARKETPLACE TERPADU BERBASIS WEBSITE DAN PEMETAAN PREFERENSI KONSUMEN DI MAJALENGKA CREATIVE CENTER Hendrawan Rukiyat; Ii Sopiandi
SEMINAR TEKNOLOGI MAJALENGKA (STIMA) Vol 10 (2026)
Publisher : Universitas Majalengka

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

The acceleration of the digital economy has made online visibility decisive for creative economy actors. At the Concept Store of Majalengka Creative Center (MCC), superior local products are still marketed offline or only partially through each actor's personal social media, so visitors cannot browse a complete catalogue of the seventeen creative subsectors and the management holds no structured record of consumer behaviour. Strategic decisions on products and promotion therefore rely on intuition rather than evidence. This research aims to design and build an integrated web-based marketplace that also functions as a business intelligence instrument through consumer preference mapping. The system was developed with the Waterfall model, covering requirement analysis, design using the Unified Modeling Language (Use Case, Activity, Sequence, and Class Diagrams), implementation, and testing. It was built with PHP, the Laravel framework, Livewire, Tailwind CSS, and a MySQL database. The result is a multi-tenant marketplace with three access levels: Admin, Creative Economy Actor, and Visitor, equipped with guest checkout, product moderation, and an analytics dashboard that records the most frequently viewed products and the most popular search keywords in real time. White Box testing using the Basis Path technique on ten core features shows that all thirty-three independent paths executed validly; the checkout feature produced a Cyclomatic Complexity of five. Black Box testing confirmed that the interface and validation of every feature behaved as specified. In conclusion, the system improves the visibility of local creative products and enables MCC management to map consumer preferences from data
PENGEMBANGAN SISTEM INFORMASI MONITORING PRODUKSI BUKU BERBASIS WEB UNTUK OPTIMALISASI PROSES PERCETAKAN Ria Fitriani; Suhendri
SEMINAR TEKNOLOGI MAJALENGKA (STIMA) Vol 10 (2026)
Publisher : Universitas Majalengka

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

The production monitoring process at PT. Meyard Cahaya Nusantara is still conducted semi-manually, resulting in delays in information delivery and difficulties in monitoring production progress. This study aims to develop a web-based production monitoring information system to optimize the book printing process. The system was developed using the Rapid Application Development (RAD) method through the Requirements Planning, User Design, Construction, and Cutover phases. Data were collected through observation, interviews, and literature study. The system was implemented using the Next.js framework and Firebase for authentication and real-time data management. System quality was evaluated using White Box Testing and Black Box Testing. White Box Testing produced a Cyclomatic Complexity value of 3 with three independent execution paths, all of which were successfully executed. Black Box Testing on 12 main system functions showed that all functional requirements operated successfully without functional errors. These results indicate that the proposed system is functionally feasible to support production monitoring, improve information accessibility, and facilitate coordination in the book printing process.
METODE PELAKSANAAN PEKERJAAN STRESSING DAN GROUTING TENDON BALANCE CANTILEVER PROYEK LRT JAKARTA Febri Kusbianto Pamungkas; Abdul Kholiq
SEMINAR TEKNOLOGI MAJALENGKA (STIMA) Vol 10 (2026)
Publisher : Universitas Majalengka

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

This study aims to describe the implementation method of stressing and grouting works on balance cantilever tendons, identify the factors affecting the success of the works, and evaluate the obstacles encountered together with the solutions applied at the LRT Jakarta Phase 1B Velodrome–Manggarai project, on piers P46B–P50B. The post-tensioning system strengthens segmental box girders built with the Balance Cantilever Method using a form traveler. Data were collected through field observation, interviews, and documentation during practical work, then analyzed descriptively. Results show that stressing is only performed after concrete reaches the required compressive strength of 28 MPa (0.8 f’c), using a calibrated hydraulic jack, with actual elongation compared to theoretical values within a ±7% tolerance. Lift-off tests confirmed that the remaining prestressing force was within the required range. Grouting was carried out with the bottom-up method after strand cutting and anchor patching, producing void-free ducts as verified by flow-cone testing. Identified success factors include concrete readiness, tendon and equipment quality, proper calibration, correct stressing sequence, and strict quality control. Concrete cracking after curing was the main obstacle encountered, requiring schedule adjustment and repair before stressing could proceed. Overall, the stressing and grouting works were executed safely and in accordance with the design specifications, supporting the structural integrity and long-term service life of the LRT Jakarta box girder.
RANCANG BANGUN SISTEM INFORMASI MONITORING DAN EVALUASI PROGRAM DESA BERBASIS WEBSITE DI KECAMATAN DAWUAN Ai Nurlaeli Maulatul Azizah
SEMINAR TEKNOLOGI MAJALENGKA (STIMA) Vol 10 (2026)
Publisher : Universitas Majalengka

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

The monitoring and evaluation process of village development programs in Dawuan District is still conducted manually using physical documents and separate spreadsheets. This condition results in inefficient report management, limited monitoring, and delays in validation. The main novelty and contribution of this study lie in integrating the two-actor monitoring workflow (village operators and district administrators) with automated monthly performance recapitulation and structured evaluation notes into a single web-based platform. The system was developed using the System Development Life Cycle (SDLC) Waterfall model with PHP, HTML, CSS, JavaScript, and MySQL on XAMPP. System evaluation was carried out using Black Box Testing and System Usability Scale (SUS). The Black Box testing yielded a 100% functional success rate, while the SUS test achieved an average score of 81.5, categorized as "Acceptable" with a grade B (Excellent). Consequently, the system effectively accelerates report management and supports Smart Village governance
PENGEMBANGAN SISTEM INFORMASI MANAJEMEN PRODUKSI KONVEKSI BERBASIS WEB MENGGUNAKAN FRAMEWORK LARAVEL UNTUK MENDUKUNG EFISIENSI OPERASIONAL Sandi Pirdaus; Tri Ferga pra
SEMINAR TEKNOLOGI MAJALENGKA (STIMA) Vol 10 (2026)
Publisher : Universitas Majalengka

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

The rapid advancement of information technology has encouraged business sectors, including the garment industry, to adopt web-based information systems to improve operational efficiency. This study aims to develop a web-based production management information system for TS Clothing Market using the Laravel framework. The system was developed using the Rapid Application Development (RAD) method, which consists of requirement planning, User Design, Construction, and Cutover stages. Data collection was conducted through observation, interviews, and literature studies. The developed system integrates production Order Management, employee payroll, production locker management, sales monitoring, and user management into a single web application. System testing was carried out using White Box Testing, Black Box Testing, and validation testing to evaluate functional correctness and software quality. The testing results indicate that all system functions operate according to the specified requirements and support more effective production management. The implementation of the system contributes to improving operational efficiency by accelerating data processing, reducing manual recording, and facilitating production monitoring in real time.
ANALISA MANAJEMEN PENGAWASAN DAN PENGENDALIAN PEKERJAAN STRUKTUR BAWAH PADA PROYEK PEMBANGUNAN KERTAJATI UMROH PARK Adhitya Akta Permana; Arief Rijaluddin
SEMINAR TEKNOLOGI MAJALENGKA (STIMA) Vol 10 (2026)
Publisher : Universitas Majalengka

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Construction supervision and control are essential to ensuring project quality and schedule performance. This study aims to analyze the implementation of supervision and quality control in the substructure works of the Kios Bazar Building at the Kertajati Umroh Park Project and evaluate schedule performance using Earned Value Analysis (EVA). A mixed-methods approach was employed through field observations, project documentation, interviews, and analysis based on SNI 2847:2019, project specifications, and shop drawings. Schedule performance was assessed using Planned Value (PV), Earned Value (EV), Schedule Variance (SV), and Schedule Performance Index (SPI). The results indicate several supervision gaps, including the absence of a Supervision Consultant, Site Engineer, Quality Control (QC) personnel, and Safety Officer. Quality control deficiencies included the absence of slump tests, trial mixes, and a Bar Bending Schedule (BBS), reinforcement bars stored directly on the ground, and potential cold joints due to three-day site-mixed concrete casting. EVA analysis showed the lowest SPI value of 0.53 in Week 24, mainly caused by manual excavation, delayed labor mobilization, and late reinforcement delivery. Project acceleration increased the SPI to 1.00 in Week 33, indicating completion according to the final project schedule.
PENGEMBANGAN SISTEM PENDAFTARAN ONLINE TERINTEGRASI NOMOR ANTREAN DIGITAL DI DISDUKCAPIL MAJALENGKA Shalsabila Dwi Aprilia; Harun Sujadi
SEMINAR TEKNOLOGI MAJALENGKA (STIMA) Vol 10 (2026)
Publisher : Universitas Majalengka

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

The registration and queue management process at the Department of Population and Civil Registration (Disdukcapil) of Majalengka Regency is still conducted conventionally, resulting in long waiting times and inefficient public services. This study aims to develop an online registration system integrated with a digital queue number to improve the efficiency of population administration services. The system was developed using the Waterfall software development model through the stages of requirements analysis, system design, implementation, testing, and maintenance. Data were collected through observation, interviews, and literature study. System evaluation was conducted using White Box Testing and Black Box Testing, showing that all functional features operated according to the specified requirements. The developed system enables online service registration, automatic digital queue generation, real-time queue monitoring, and integrated service management for administrators. The implementation of the system improves service efficiency, reduces queue congestion, increases transparency, and supports the implementation of e-government in population administration services at Disdukcapil Kabupaten Majalengka.