Claim Missing Document
Check
Articles

Found 20 Documents
Search

Analisis Indeks Risiko Genangan Air di Kecamatan Tarakan Barat Kota Tarakan Rahmat Faizal; Zikri Alstony
Borneo Engineering : Jurnal Teknik Sipil Volume 6 Nomor 1 Tahun 2022
Publisher : Jurusan Teknik Sipil, Fakultas Teknik, Universitas Borneo Tarakan

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.35334/be.v1i1.2486

Abstract

Almost every year the city of Tarakan experiences problems regarding standing water during the rainy season, especially in the West Tarakan sub-district which is the center of Tarakan City. This puddle not only submerged settlements and offices but also shops and road access which caused considerable economic losses. This can be overcome by analyzing the risk of waterlogging where each area has a different level of vulnerability. The purpose of this study is to determine high, medium, and low risk areas for standing water in the Drainage Area of West Tarakan District, Tarakan City. The research implementation method includes data collection (institutional and field surveys), analyzing the index of vulnerability, vulnerability and capacity and analyzing the flood risk map. The index analysis is carried out through simulated parameter score analysis. Based on the results of the analysis of the research data, it can be concluded that the water inundation risk index in the West Tarakan District is as follows, the sub-districts that are on the highest risk index are Karang Anyar sub-district, then Karang Rejo village, kelurahan Karang balik and Kelurahan Karang Newar Pantai Nerda is at index 2 or is at a moderate risk index, then the kelurahan that has the lowest risk index is Hope Reef with a risk index of 1
Analisis Kapasitas Drainase Perumahanan Pesona Citra Cemerlang 2 Kota Tarakan Menggunakan EPA SWMM 5.1 Rahmat Faizal
Borneo Engineering : Jurnal Teknik Sipil Volume 5 Nomor 2 Tahun 2021
Publisher : Jurusan Teknik Sipil, Fakultas Teknik, Universitas Borneo Tarakan

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.35334/be.v5i2.3580

Abstract

SWMM is a rain-runoff simulation model that is used to simulate the quantity and quality of runoff from urban areas. Based on the evaluation using SWMM software at Pesona Citra Cemerlang 2 Housing, it was found that the drainage system in the long sections JU29-O5, JU4-O8, and JU5-O8 could not accommodate rainwater runoff. This is influenced by the dimensions of the drainage channel which cannot accommodate the existing water runoff and thick sediment deposits that cover the drainage channel so that the capacity is reduced, consequently if it rains it will cause puddles of water at several points in Tarakan City. So to overcome the puddle, it is necessary to change the dimensions of the channel and routinely dredge the sediment deposits that cover the drainage channel
Angkutan Sedimen Total Saluran Pembawa Embung Rawasari menggunakan Metode Empiris dan Software HEC-RAS 6.0 Aswar Amiruddin; Refina Fatriza; Rahmat Faizal
Borneo Engineering : Jurnal Teknik Sipil Volume 7 Nomor 3 Tahun 2023
Publisher : Jurusan Teknik Sipil, Fakultas Teknik, Universitas Borneo Tarakan

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.35334/be.v7i3.4787

Abstract

The need for water will continue to increase, while the availability of water is limited; therefore, the provision of water must be pursued both by the government and independently. Rawasari Reservoir is one of the reservoirs in Tarakan City with a relatively stable volume and an effective storage capacity of 112,982 m3. The water source of Rawasari Reservoir comes from a channel that is a tributary experiencing sedimentation due to the sedimentation process. Based on this, the research team was interested in calculating sediment transport in the conveyance channel of Rawasari Reservoir using both empirical methods and the HEC-RAS 6.0 software. The methods used in this research are empirical using the Engelund Hansen and Laursen equations, as well as the use of HEC-RAS 6.0 software. Based on the analysis results, the sediment transport rate in the conveyance channel of Rawasari Reservoir calculated using the empirical method at STA 0+025 is 1,6427 x 10-9 ton/s for the Engelund Hansen method and 2,9898 x 10-9 ton/s for the Laursen method. The simulation of sediment transport in the bed of the conveyance channel of Rawasari Reservoir using the HEC-RAS 6.0 sediment transport model at STA 0+025 is 4,61x10-5 ton/s with the Engelund Hansen sediment transport function and 0,000306 ton/s using the Laursen sediment transport function.
ANALISIS KETERSEDIAAN DAN KEBUTUHAN AIR BAKU PADA EMBUNG SUNGAI BILAL KABUPATEN NUNUKAN MENGGUNAKAN METODE F.J. MOCK Nurdiansyah, Nurdiansyah; Faizal, Rahmat; Amiruddin, Aswar
Civil Engineering Scientific Journal Vol 2, No 2 (2023): Civil Engineering Scientific Journal
Publisher : Jurusan Teknik Sipil, Fakultas Teknik, Universitas Borneo Tarakan

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.35334/cesj.v2i2.4169

Abstract

ABSTRACT : Due to population growth and the region's fast development, domestic and non- domestic water consumption has grown in Nunukan Regency. To meet the clean water demand, the government has built the Bilal River Reservoir, which initiated a study of the Bilal River Reservoir to be carried out to determine the reservoir's reliability in meeting the demand for clean water in line with population growth. This study analyzed water availability and the demand for raw water in the Bilal River Reservoir. In the analysis of water availability, the Modified Penman approach is used to analyze evapotranspiration, while the F.J. Mock method was used to study effective debit. From the analysis of raw water availability using the F.J. Mock with 90% reliability, The biggest Q90 was in January at 119 liters/sec, and the smallest was in December at 15 liters/sec. As well as the results of the largest water demand analysis in 2031 in the West Nunukan Village zone of 19,947 liters/sec and the smallest in 2022 in the Central Nunukan Village zone of 6,249 l/s.Keywords: Bilal River Reservoir, Water Availability, Water Demand, F.J. Method Mock ABSTRAK: Meningkatnya aktivitas penduduk ditambah dengan berkembangnya pembangunan yang semakin pesat menyebabkan kebutuhan air untuk domestik maupun non domestik yang meningkat di Kabuapten Nunukan. Dalam rangka upaya pemenuhan kebutuhan air bersih, pemerintah Kabupaten Nunukan membangun Embung Sungai Bilal. Kajian terhadap Embung Sungai Bilal perlu dilakukan untuk mengetahui keandalan embung dalam memenuhi kebutuhan air bersih sejalan dengan pertumbuhan penduduk. Penelitian ini bertujuan untuk menganalisis ketersediaan air dan kebutuhan air baku pada Embung Sungai Bilal. Pada analisis ketersediaan air perhitungan Evapotranspirasi menggunakan metode Penman Modifikasi dan Debit Efektif menggunakan metode F.J. Mock. Dari hasil analisis ketersediaan air baku dengan menggunakan metode F.J. Mock dengan keandalan 90%. Q90 terbesar pada bulan Januari sebesar 119 ltr/dtk terkecil pada bulan Desember sebesar 15 ltr/dtk. Serta hasil analisis kebutuhan air terbesar pada tahun 2031 zona Kelurahan Nunukan Barat sebesar 19,947 lt/dtk, terkecil pada tahun 2022 zona Kelurahan Nunukan Tengah sebesar 6,249 lt/dtk.Kata kunci: Embung Sungai Bilal, Ketersediaan Air, Kebutuhan Air, Metode F.J. Mock
ANALISIS DEBIT BANJIR DRAINASE JALAN PATTIMURA KOTA TARAKAN DAN PENGARUHNYA TERHADAP KAPASITAS SALURAN Ruslan, Ruslan; Amiruddin, Aswar; Faizal, Rahmat
Civil Engineering Scientific Journal Vol 3, No 1 (2024): Civil Engineering Scientific Journal
Publisher : Jurusan Teknik Sipil, Fakultas Teknik, Universitas Borneo Tarakan

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.35334/cesj.v3i1.5041

Abstract

ABSTRACT: Tarakan City has a large problem of land conversion which results in a decrease in the infiltration area. Jalan Pattimura, Pamusian Kelurahan is one of the points in Central Tarakan District that has the potential for flooding due to high rainfall intensity. The purpose of this study is to calculate the flood discharge Q25, Q50 and Q100 and to evaluate the channel capacity against the flood discharge. The method used to calculate the discharge is the modified rational method. The design flood discharge with a return period of 25, 50 and 100 years in the catchment area of drainage channel 1 is calculated using the modified rational method is 0,112 m3/sec for Q25, 0,115 m3/sec for Q50 and 0,117 m3/sec for Q100. Furthermore, the design flood discharge in the catchment area of drainage channel 2 is calculated using the modified rational method is 0,111 m3/sec for Q25, 0,113 m3/sec for Q50 and 0,115 m3/sec for Q100. Based on the evaluation of the existing channel conditions of Jalan Pattimura, Pamusian Kelurahan, Tarakan City, it was obtained that the existing channel capacity with the existing channel height is able to pass a discharge of 0,366 m3/sec for Drainage Channel 1 and 0,312 m3/sec for Drainage Channel 2 so it can be concluded that the current channel is still able to pass the discharge Q25, Q50 and Q100 years. Keywords: Drainage, flood discharge, channel capacity ABSTRAK: Kota Tarakan memiliki masalah alih fungsi lahan yang besar yang berakibat pada berkurangnya daerah resapan. Jalan Pattimura, Kelurahan Pamusian merupakan salah titik di Kecamatan Tarakan Tengah yang memiliki potensi banjir akibat intensitas hujan yang tinggi. Tujuan penelitian ini untuk menghitung debit banjir Q25, Q50 dan Q100 dan melakukan evaluasi kapasitas saluran terhadap debit banjir. Metode yang digunakan untuk menghitung debit adalah rasional modifikasi. Debit banjir rencana periode ulang 25, 50 dan 100 tahun pada daerah tangkapan saluran drainase 1 dihitung menggunakan metode rasional modifikasi adalah 0,112  m3/dtk untuk Q25, 0,115 m3/dtk untuk Q50 dan 0,117 m3/dtk untuk Q100. Selanjutnya, debit banjir rencana pada daerah tangkapan saluran drainase 2 dihitung menggunakan metode rasional modifikasi rasional adalah 0,111  m3/dtk untuk Q25, 0,113 m3/dtk untuk Q50 dan 0,115 m3/dtk untuk Q100. Berdasarkan evaluasi terhadap kondisi saluran eksisting Jalan Pattimura, Kelurahan Pamusian, Kota Tarakan diperoleh kapasitas saluran eksisting dengan tinggi saluran yang ada saat mampu melewatkan debit 0,366 m3/dtk untuk Saluran Drainase 1 dan 0,312 m3/dtk untuk Saluran Drainase 2 sehingga dapat disimpulkan saluran yang saat ini masih mampu melewatkan debit Q25, Q50 dan Q100 tahun.Kata kunci: Drainase, debit banjir, kapasitas saluran
ANALISIS KEBUTUHAN DAN KETERSEDIAAN AIR BAKU EMBUNG BOLONG KABUPATEN NUNUKAN MENGGUNAKAN METODE NRECA Faizal, Rahmat; Firdaus, Wildan; Amiruddin, Aswar
Civil Engineering Scientific Journal Vol 2, No 1 (2023): Civil Engineering Scientific Journal
Publisher : Jurusan Teknik Sipil, Fakultas Teknik, Universitas Borneo Tarakan

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.35334/cesj.v2i1.4146

Abstract

ABSTRACT: Raw water in Embung Bolong, Nunukan Regency, is currently experiencing a decline or depreciation due to low rainfall in Nunukan Regency, so it is necessary to conduct research on the availability of raw water, including the use of environmental conditions in Embung Bolong. Calculation of evapotranspiration using the Penman Modification and Effective Discharge method using the NRECA method includes data from related agencies in the form of rainfall data, air humidity, air temperature, wind speed, and length of sunlight. Based on the results of the analysis, the total water requirement for 2031 is 4.229 lt/s for the West Nunukan Village zone, 22.633 lt/s for the Central Nunukan Urban Village zone, 20.228 lt/s for the East Nunukan Urban Village zone, 6.475 lt/s for the South Nunukan Urban Village zone , 6,304 lt/s for the Selisun Village zone and the mainstay discharge Q90 reviewed from the last 10 years from 2012 to 2021, the largest water availability occurs in June, which is 50,645 lt/s and the smallest water availability occurs in April, namely of 0.224 l/sec.Keywords: Embung Bolong, Nursery IPA, Water Demand, Water Availability, NRECA MethodABSTRAK: Air baku di Embung Bolong Kabupaten Nunukan kini mengalami penurunan atau penyusutan yang disebabkan rendahnya curah hujan di Kabupaten Nunukan sehingga perlu dilakukan penelitian mengenai ketersediaan air baku termasuk pemanfaatan kondisi lingkungan di Embung Bolong. Perhitungan evapotranspirasi menggunakan metode Penman Modifikasi dan Debit Efektif dengan menggunakan metode NRECA meliputi data dari instansi terkait berupa data curah hujan, kelembaban udara, suhu udara kecepatan angin, dan lama penyinaran matahari. Berdasarkan hasil analisis, diperoleh jumlah kebutuhan ait tahun 2031 sebesar 4,229 lt/dtk untuk zona Kelurahan Nunukan Barat, 22,633 lt/dtk untuk zona Kelurahan Nunukan Tengah, 20,228 lt/dtk untuk zona Kelurahan Nunukan Timur, 6,475 lt/dtk untuk zona Kelurahan Nunukan Selatan, 6,304 lt/dtk untuk zona Kelurahan Selisun serta debit andalan Q90 yang ditinjau dari 10 tahun terakhir terhitung dari tahun 2012 sampai dengan tahun 2021 diperoleh ketersediaan air terbesar terjadi pada bulan Juni yaitu sebesar 50,645 lt/dtk dan ketersediaan air terkecil terjadi pada bulan April yaitu sebesar 0,224 lt/dtk.Kata kunci: Embung Bolong, IPA Persemaian, Kebutuhan Air, Ketersediaan Air, Metode NRECA
Perancangan Antarmuka Pengguna dan Pengalaman Pengguna (UI/UX) Aplikasi WOkuy Faizal, Rahmat; Ady Saputro, Indrawan
Prosiding Seminar Nasional Teknologi Informasi dan Bisnis Prosiding Seminar Nasional Teknologi Informasi dan Bisnis (SENATIB) 2025
Publisher : Fakultas Ilmu Komputer Universitas Duta Bangsa Surakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.47701/vs5wse86

Abstract

Penelitian ini bertujuan merancang antarmuka pengguna (UI) dan pengalaman pengguna (UX) untuk sebuah aplikasi latihan berbasis mobile dengan metode Design Thinking (Empathize, Define, Ideate, Prototype, Test). Melalui pengumpulan data dari calon pengguna usia 18–35 tahun, diketahui bahwa sebagian besar membutuhkan panduan latihan yang dapat disesuaikan dan antarmuka yang mudah digunakan. Hasil pengujian awal menunjukkan bahwa 80% peserta menganggap fitur penjadwalan dan personalisasi bermanfaat, sedangkan 90% menilai antarmuka mudah dipahami. Kesimpulan dari penelitian ini ialah penerapan metode Design Thinking dapat menghasilkan rancangan yang sesuai kebutuhan dan dapat memotivasi pengguna untuk berlatih lebih konsisten.a
Pelatihan Penyusunan Penelitian Tindakan Bimbingan dan Konseling (PTBK) Bagi Guru BK Di Kalimantan Utara Suriata, Suriata; Avianty, Putri; Rahmi, Siti; Ariantini, Nisa; Faizal, Rahmat
Jurnal Pengabdian Masyarakat Progresif Humanis Brainstorming Vol 8, No 3 (2025): Jurnal Abdimas PHB : Jurnal Pengabdian Masyarakat Progresif Humanis Brainstormin
Publisher : Politeknik Harapan Bersama

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30591/japhb.v8i3.4940

Abstract

Permasalahan yang dialami guru-guru Bimbingan Konseling di Kalimantan Utara adalah kurangnya keterampilan dalam menyusun Penelitian Tindakan Bimbingan dan Konseling (PTBK), sehingga perlu dilakukan pelatihan penyusunan penelitian tindakan Bimbingan dan Konseling agar dapat meningkatkan kualitas pelayanan kepada siswa dan juga untuk menambah wawasan dan keterampilan tentang ilmu Bimbingan dan Konseling. Pelatihan PTBK bagi Guru-guru Bimbingan dan Konseling yang ada di Kalimantan Utara dilaksanakan oleh Program Studi Bimbingan dan Konseling Universitas Borneo Tarakan bekerjasama dengan Asosiasi Bimbingan Konseling Indonesia (ABKIN) Kalimantan Utara yang dilaksanakan pada tanggal 18 sampai dengan tanggal 21 November 2021. Tahapan Pelaksanaan pelatihan penyusunan proposal Penelitian Tindakan Bimbingan dan Konseling (PTBK) terbagi menjadi  2 tahap kegiatan. Tahap pertama berupa pendalaman konsep penelitian Tindakan bimbingan dan konseling, dan Tahap kedua berupa praktik penyusunan proposal PTBK. Kemampuan peserta setelah pelatihan dilihat dari penguasaan materi dan dalam kegiatan praktek berupa penyusunan proposal Penelitian Tindakan Bimbingan dan Konseling (PTBK) dinilai baik dengan skors post test sebesar 81%. Antusiasme peserta dalam mengikuti pelatihan juga tinggi dilihat dengan banyaknya  pertanyaan dan umpan balik selama sesi diskusi.
Analisis Tinggi Muka Air Kanal Bandara Kota Tarakan Akibat Pengaruh Pasang Surut Menggunakan HEC-RAS 6.0 Amiruddin, Aswar; Roem, Muhamad; Faizal, Rahmat
Teras Jurnal : Jurnal Teknik Sipil Vol. 13 No. 2 (2023): Volume 13 Nomor 2, September 2023
Publisher : UNIVERSITAS MALIKUSSALEH

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.29103/tj.v13i2.868

Abstract

Abstrak Banjir akibat air pasang atau banjir rob merupakan salah satu bencana yang sering terjadi di wilayah pesisir yang menggenangi bagian daratan di wilayah pesisir yang memiliki ketinggian (elevasi) lebih rendah dari muka air laut pasang tinggi. Kejadian banjir akibat pasang ini sudah memasuki area pemukiman penduduk di beberapa titik lokasi di Tarakan termasuk di sekitar kanal bandara Kota Tarakan. Berdasarkan pengamatan lapangan terdapat pemukiman warga di sisi kiri aliran kanal bandara Kota Tarakan, sehingga genangan mengganggu aktivitas warga. Berdasarkan permasalahan tersebut penelitian ini bertujuan untuk mengetahui tinggi muka air pada penampang kanal bandara Kota Tarakan akibat pasang surut dan banjir rancangan periode ulang 5 dan 10 tahunan. Metode yang digunakan untuk menganalisis tinggi muka air kanal bandara Kota Tarakan yakni menggunakan software HEC-RAS. Berdasarkan hasil analisis tinggi muka air menggunakan HEC-RAS diperoleh tinggi muka air penampang kanal bandara Kota Tarakan akibat banjir 5 tahunan dan 10 tahunan yang terjadi bersamaan dengan pasang tertinggi (HHWL) diperoleh tinggi muka air pada penampang sta 0+100 - 1+000 sebesar 3,8 m dan penampang 1+100 - 1+500 sebesar 3,81 m. Dari hasil penelitian ini maka disarankan pemerintah membangun pengendalian banjir dengan membuat tanggul dengan elevasi +4,5 m dari datum muka air terendah (LLWL). Kata kunci: Banjir rancangan, HEC-RAS, pasang surut, tinggi muka air,  Abstract Floods caused by high tides or tidal floods are one of the disasters that often occur in coastal areas that inundate the mainland areas in coastal areas that have lower elevations than the high tide sea level. The occurrence of tidal floods has entered residential areas at several locations in Tarakan, including around the Tarakan City airport canal. Based on field observations, there are residential areas on the left side of the Tarakan City airport canal, so the inundation disturbs the activities of the residents. Based on this problem, this study aims to determine the water level in the section of the Tarakan City airport canal due to tidal floods and floods with a 5-year and 10-year return period. The method used to analyze the water level of the Tarakan City airport canal is by using the HEC-RAS software. Based on the analysis results of the water level using HEC-RAS, the water level in the Tarakan City airport canal section due to a 5-year and 10-year flood that occurs simultaneously with the highest tide (HHWL) was obtained the water level at the sta 0+100 - 1+000 section is 3,8 m and the section of 1+100 - 1+500 is 3,81 m. From the results of this study, it is recommended that the government build flood control by constructing embankments with an elevation of +4,5 m from the lowest water level datum (LLWL). Keywords: Flood design, HEC-RAS, tides, water level,
Analisis Stabilitas Lereng Menggunakan Matras dan Cerucuk Bambu pada Projek X Musyaffa Esa Cahya; Intan Juliana; Yelvi Yelvi; Putera Agung Maha Agung; Aldo Wirastana Adinegara; Sony Pramusandi; Muhammad Fathur Rouf Hasan; Rahmat Faizal
Borneo Engineering: Jurnal Teknik Sipil Vol. 9 No. 3 (2025): Volume 9 Nomor 3 Tahun 2025
Publisher : Jurusan Teknik Sipil, Fakultas Teknik, Universitas Borneo Tarakan

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.35334/be.v9i3.336

Abstract

The construction of PT. X' depot in Langsa City, Aceh, is located on soft clay soil that requires slope stability analysis for the embankment. This research aims to analyze slope stability using bamboo mattresses and piles as reinforcement to improve the safety factor. The analysis was conducted using manual calculations (Bishop method) and GeoStudio software (also using the Bishop method), under both static conditions and seismic influence (pseudostatic approach with a horizontal seismic coefficient (kh) = 0.18). The manual calculation results showed that the unreinforced slope had a safety factor (SF) of 1.1428 < 1.25 (unstable), which decreased to 0.6711 < 1.1 (unstable) under seismic load. Meanwhile, the GeoStudio software analysis indicated that the unreinforced slope had an SF of 1.256 > 1.25 (stable) but dropped to 0.903 < 1.1 (unstable) under seismic load. The use of 1–4 layers of bamboo piles and matting increased the SF to 1.318–1.35 without seismic influence. Under seismic conditions, the SF of the slope reinforced with 1–4 layers of bamboo piles and matting improved to 0.931–0.97. However, the slope was still considered critical during an earthquake (SF < 1.1).