Identifikasi dan Mitigasi Risiko pada Proyek Konstruksi Menggunakan Metode House of Risk: Studi Kasus Irawan, Heri Tri; Pamungkas, Iing; Hasnita, Hasnita; Fauza, Teuku Soleh
Jurnal Optimalisasi Vol 10, No 1 (2024): April
Publisher : Universitas Teuku Umar

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.35308/jopt.v10i01.9302

Abstract

PT. Rigis Beukarya Property is a developer and contractor for housing projects in the West Aceh region. Housing projects that are implemented often experience obstacles in the construction of the project, such as over budget from the predetermined RAB, repeated repairs, materials that are ordered late, and exposure to bad weather which results in large losses due to these obstacles. The aim of this research is to identify risks in the Grand Keutapang housing development process, and mitigate the dominant risks in the Grand Keutapang housing development process. The House of risk (HOR) method is used to solve this problem by identifying risk events, risk agents and also designing risk agent mitigation strategies based on Aggregate Risk Potential (ARP) values. The results obtained from the house of risk stage 1 risk mapping show that there are 5 dominant risk agents that will be taken into consideration in developing mitigation actions, namely: A-14 (Lack of coordination between parties involved) with an ARP value of 3,384, A-1 (Incompetent/careful workforce) with an ARP value of 1,800, A-12 (Fluctuating company financial cash flow) with an ARP value of 826 , A-15 (Lack of supervision in the field) with an ARP value of 777, and A-8 (Increase in material prices) with an ARP value of 696. From the results of the house of risk phase 2 risk mapping, 5 risk mitigation action plans were obtained, including: PA-1 (Creating a monitoring and sanctions system) with an ETDk value of 5,961, PA-2 (Creating a standard diary (buhas)) with an ETDk value of 3,331, PA-3 (Creating a complete checklist) with an ETDk value of 6,236, PA - 4 (Making adaptive cost estimates) with an ETDk value of 4,270, and PA-5 (Improving the effectiveness of communication with all parties) with an ETDk value of 8.427.
Identifikasi Penyebab Kerusakan Mesin Pompa pada Sistem Distribusi Air PDAM Menggunakan FMEA dan LTA Irawan, Heri Tri; Pamungkas, Iing; Akmal, Abdiel Khaleil; Pandria, T.M. Azis; Sofiyanurriyanti, Sofiyanurriyanti; Hasnita, Hasnita; Azhar, Azhar
Jurnal Optimalisasi Vol 10, No 2 (2024): Oktober
Publisher : Universitas Teuku Umar

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.35308/jopt.v10i2.10449

Abstract

The existence of a Regional Drinking Water Company (PDAM) is very important in maintaining the continuity of the clean water treatment process running smoothly and well. Maintenance of clean water distribution machines and equipment is a matter that requires attention because damage to one of the machines or equipment can cause a cessation of processing activities which results in losses for companies and services. Damage to the water distribution machine in PDAM Tirta Mountala is unavoidable and this happens frequently. This happens because the damage is not properly identified, either in preventive maintenance or in anticipating appropriate action. The purpose of this study is to identify the cause of the damage and propose maintenance actions on the clean water distribution pump machine in PDAM Tirta Montala Aceh Besar. The failure mode and effect analysis (FMEA) and logic tree analysis (LTA) approaches are used to anticipate this. FMEA is an approach used to identify and analyze potential failures and their consequences. Meanwhile, LTA aims to prioritize each damage mode and carry out reviews and functions, malfunctions so that the damage mode status is not the same. There are eighteen water distribution pump components with the highest damage frequency. Based on the results of the FMEA, five components with the highest RPN or the highest risk were obtained, namely the vane, stuffing box, bearing bracket support, shaft and bearing components. The five components were then analyzed through LTA and maintenance tasks with several proposed actions including repair, component replacement, welding, thermography, and re-measurement with a vibration meter.
Prospek Ekonomi Peremajaan Perkebunan Kelapa Sawit Rakyat: Analisis Kelayakan di Tingkat Petani, Kabupaten Nagan Raya Irawan, Heri Tri; Arga, Dwi Prasiska Lena; Hasnita, Hasnita; Pandria, T.M. Azis; Ulhaq, Riza; Pamungkas, Iing; Hadi, Khairul; Saputra, Arie; Muzakir, Muzakir
Jurnal Optimalisasi Vol 11, No 1 (2025): April
Publisher : Universitas Teuku Umar

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.35308/jopt.v11i1.11777

Abstract

This research aims to analyze the financial feasibility and sensitivity of investment in the rejuvenation of smallholder oil palm plantations in Lungmane Village, Kuala Pesisir Subdistrict, Nagan Raya Regency, Aceh Province, amidst the problem of declining Fresh Fruit Bunch (FFB) productivity due to aging trees. The research method used is quantitative analysis with investment criteria of Net Present Value (NPV), Internal Rate of Return (IRR), Net Benefit-Cost Ratio (Net B/C), and Payback Period (PP), as well as sensitivity analysis to changes in FFB prices. The results of the analysis show that the rejuvenation project for smallholder oil palm plantations in Lungmane Village is financially feasible based on positive NPV, IRR, Net B/C, and Payback Period indicators. However, the sensitivity analysis reveals that the project's feasibility is highly influenced by fluctuations in FFB prices, where a price decrease of up to 70% can render the project unfeasible. This study concludes that although the rejuvenation of smallholder oil palm plantations in Lungmane Village has good financial prospects, farmers need to be aware of the risk of declining FFB prices.