Claim Missing Document
Check
Articles

Found 20 Documents
Search

SIMULASI PEMODELAN PELUANG KEBANGKRUTAN (RUIN PROBABILITY) PERUSAHAAN ASURANSI DENGAN ANALISIS PENDAPATAN PREMI DAN BEBAN KLAIM Erizal; Septiadi, Mutia Rachmawati
Premium Insurance Business Journal Vol. 8 No. 1 (2021): PREMIUM INSURANCE BUSINESS JOURNAL
Publisher : Pusat Penelitian dan Pengabdian Kepada Masyarakat Sekolah Tinggi Manajemen Asuransi Trisakti

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (671.124 KB)

Abstract

Ruin probability an insurance companies is defined as condition where the ttotal claim expense that has to be paid is greater than the premium income plus the company’s initial capital. The insurance company has the funds to pay claims that derived from accumulated initial reserve and income of insurance from premiums that has payed. If the company’s funds at time t is smaller than 0 then the insurance company will going bankruptcy. Therefor will be analyzed the premium income that must obtained and the value of claim expense that must be certified by the insurance companies. If the premium income that must obtained is greater, so the funds of insurance company will greater too at the time-t to cover the next claim expense. Ruin probability in the insurance company can be predicted from the simulation of ruin probability model with claim expense frequency which happened at the same time between 0 and t is assumed distribution poisson and claim expense size is distribution exponential. This model could be used by insurance company to take decision when determaining premium whether surplus or ruin.
Penerapan Buidling Information Modeling (BIM) 5D pada Proyek Gedung Simpang Temu Dukuh Atas, Jakarta Pusat Sabil, Dairan; Erizal
Jurnal Teknik Sipil dan Lingkungan Vol. 8 No. 2: Agustus 2023
Publisher : Departemen Teknik Sipil dan Lingkungan, IPB University and The Institut of ENgineering Indonesia (PII), Bogor

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.29244/jsil.8.02.95-104

Abstract

Building Information Modeling (BIM) merupakan sistem yang dapat menangani masalah aplikasi konvensional bidang konstruksi. Tujuan penelitian ini adalah untuk melakukan pemodelan BIM hingga 5D menggunakan software Tekla Structres pada proyek Gedung Simpang Temu Dukuh Atas, Jakarta Pusat, serta melakukan analisis kinerja waktu konstruksi, membandingkan volume pekerjaan hasil perhitungan BIM dengan volume pekerjaan perhitungan BQ. Pemodelan 3D dilakukan sesuai dengan shop drawing. Pemodelan 4D dilakukan sesuai master schedule untuk melakukan visualisasi penjadwalan gedung. Pemodelan 5D dilakukan dengan report hasil volume perhitungan BIM dan dibandingkan dengan perhitungan berdasarkan dokumen BQ. Dalam pelaksanaan pembangunan proyek, terjadi keterlambatan proyek dengan keterlambatan paling besar pada bulan April 2022 dengan nilai keterlambatan sebesar -5,24%. Keterlambatan terjadi karena faktor cuaca dan dilakukan adendum dengan menambah tenaga kerja untuk mempercepat pekerjaan proyek. Perhitungan BIM didapatkan lebih kecil dibandingkan dengan perhitungan BQ dengan jumlah perbedaan volume beton sebesar 20,85% lebih kecil dan berat tulangan besi sebesar 26,32% lebih kecil dibanding BQ.
Analisis Kekuatan Struktur Pada Bangunan 8 Lantai Berdasarkan Respon Spektrum SNI 03-1726-2019 Menggunakan SAP2000 Hukama, Raihan Daffa; Erizal
Jurnal Teknik Sipil dan Lingkungan Vol. 8 No. 3: Desember 2023
Publisher : Departemen Teknik Sipil dan Lingkungan, IPB University and The Institut of ENgineering Indonesia (PII), Bogor

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.29244/jsil.8.03.127-136

Abstract

Suatu struktur bangunan gedung terdiri atas beberapa elemen struktur penyusunnya seperti kolom, balok, pelat lantai, shearwall, pondasi, dan rangka atap. Indonesia merupakan daerah rawan terhadap gempa karena dilalui oleh jalur pertemuan 3 lempeng tektonik. Provinsi Jawa Barat mengalami sebanyak 141 gempa bumi pada bulan Januari 2023 menurut Badan Metereologi, Klimatologi, dan Geofisika (BMKG). Kabupaten Bogor mengalami gempa bumi sebanyak 16 kali dalam rentang tahun 2012-2022. Upaya mitigasi kegagalan struktur di Indonesia akibat gempa sangat perlu dilakukan untuk mengetahui kondisi kinerja struktur bangunan tersebut terhadap gempa. Tujuan penelitian ini adalah untuk melakukan pemodelan menggunakan software SAP2000 serta menganalisis kekuatan struktur pada bangunan 8 lantai terhadap gempa dengan mengacu pada SNI 1726-2019 tentang tata cara perencanaan ketahanan gempa untuk struktur bangunan gedung dan non gedung. Penelitian dilakukan dengan menggunakan tiga skenario dengan metode respon spektrum. Pengujian kuat tekan beton digunakan menggunakan hammer test. Penyesuaian as built drawing perlu dilakukan karena terdapat perbedaan antara gambar rencana dengan kondisi existing. Pada hasil identifikasi kegagalan struktur Gedung X terdapat kegagalan pada saat beban gempa diinputkan. Terdapat 2 frames yang mengalami overstress pada skenario tiga. Berdasarkan hasil analisis simpangan antar lantai dan efek P-Δ, Gedung X dinilai aman karena nilai yang didapat tidak melebihi simpangan izin dan batas stabilitas struktur. Rekomendasi ini bertujuan untuk perencanaan pembangunan berikutnya. Rekomendasi struktur berupa penambahan dimensi kolom menjadi 500 mm 500 mm, serta pembesaran diameter tulangan menjadi 32 mm.
Pengujian 3 Tipe Blade Turbin Angin Poros Horizotal Dengan Sudut Kemiringan 12° dan Kecepatan Angin 3 Sampai 5 m/s Menggunakan NACA 6408 Muhammad Halil; Erizal; Lelawati
Jurnal Redoks Vol. 9 No. 2 (2024): REDOKS JULI - DESEMBER
Publisher : Universitass PGRI Palembang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31851/redoks.v9i2.15445

Abstract

Energi terbarukan merupakan energi yang akhir-akhir ini banyak digunakan untuk menggantikan energi yang berasal dari fosil, selain energi terbarukan bersifat tidak terbatas dan dapat diperbaharui lagi, hal ini menjadi salah satu keunggulan dari energi terbarukan. Sumber energi terbarukan dapat berasal dari sinar matahari, aliran sungai dan angin. Diantara beberapa pilihan tersebut, Indonesia memiliki potensi angin yang bagus. Indonesia memiliki potensi angin yang bagus. Dimana perbedaan tekanan udara akan menghasilkan hembusan angin sehingga dapat dibuat alat rekayasa angin untuk memanfaatkannya seperti kincir angin. Kincir angin dapat mengubah angin menjadi energi listrik dengan prinsip angin akan menggerakan sudu-sudu kincir angin yang terhubung dengan poros generator tersebut dihasilkanlah energi listrik dari putaran kincir.angin. oleh sebab itu angin dapat untuk mennggerakan turbin angin. Pengujian di lakukan pada turbin angin poros horizontal dengan menggunakan 3 tipe blade Naca 6408 Taper, Inverse Taper, dan Taperlees diameter turbin 1000 mm, kemiringan turbin α= 12o pengujian dilakukan dengan kecepatan aliran angin 3 sampai 5 m/dt. Dari hasil pengujian di dapat Koefisien Daya dan Koefisen Torsi kecepatan angin 3,3 m/dt tertinggi pada tipe blade inverse taper nilai CTmax = 0,177, Koefisen Daya CPmax = 0,285.
Trust, Information Quality, and Reputation: Determinants of Tourist Interest in Lake Toba, Indonesia Erizal; Widodo, Slamet
Sinergi International Journal of Economics Vol. 1 No. 3 (2023): November 2023
Publisher : Yayasan Sinergi Kawula Muda

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.61194/economics.v1i3.210

Abstract

Lake Toba has attracted the attention of both local and international tourists. In efforts to enhance tourists' interest in visiting Lake Toba, it is crucial to understand the factors influencing tourists' decisions. This research analyzes the influence of trust, information quality, and reputation on tourists' interest in visiting Lake Toba. Using quantitative methods and Partial Least Squares (PLS) techniques, data were collected from 200 tourists visiting in June 2024. The results indicate that all three variables significantly and positively impact tourists' interest. Trust enhances tourists' confidence in a positive experience, information quality aids decision-making, and a good reputation serves as an indicator of destination quality and safety. Research recommendations include exploring other influencing factors and conducting similar studies in different destinations.
Environmental Impact of Limestone Mining Using A Life Cycle Assessment Method Murodif, Atfal; Fauzi, Anas Miftah; Erizal; Karlinasari, Lina
Jurnal Pengelolaan Sumberdaya Alam dan Lingkungan (Journal of Natural Resources and Environmental Management) Vol 15 No 1 (2025): Jurnal Pengelolaan Sumberdaya Alam dan Lingkungan (JPSL)
Publisher : Pusat Penelitian Lingkungan Hidup, IPB (PPLH-IPB) dan Program Studi Pengelolaan Sumberdaya Alam dan Lingkungan, IPB (PS. PSL, SPs. IPB)

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.29244/jpsl.15.1.122

Abstract

The extraction of limestone for cement production can adversely affect the environment. An inquiry is underway to examine the environmental ramifications of limestone mining to formulate strategies to mitigate these effects. This study aims to assess the ecological impact indicators of the limestone mining process by utilizing the LCA method based on CML-IAbaseline data from the openLCA software. The results indicate that crushing is a significant area of focus, contributing the most extensive value. The ratio of Ammonium Nitrate to diesel oil in adherence to guidelines is 94.5 to 5.5%. Particular emphasis is placed on assessing raw materials, especially during the loading and hauling stages. In conclusion, the research findings reveal environmental impact indicators with standardized values, such as Abiotic Depletion, Abiotic Depletion of Fossil Fuels, Acidification, Eutrophication of Freshwater Aquatic Ecotoxicity, Global Warming 100a, Human Toxicity, Marine Aquatic Ecotoxicity, Ozone Layer Depletion, Photochemical Oxidation, and Terrestrial Ecotoxicity.
Analisis Proses Penempatan Risiko ke Perusahaan Asuransi dan Proses Fasilitasi Penyelesaian Klaim Asuransi Car oleh PT. Fred Marius Sabini Insurance Broker Nurrahim, Eka Julianti; Lie, Antonius Anton; Erizal
Ilmu Ekonomi Manajemen dan Akuntansi Vol. 5 No. 2 (2024): Jurnal Ilmu Ekonomi Manajemen dan Akuntansi
Publisher : Universitas Mohammad Husni Thamrin

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.37012/ileka.v5i2.2390

Abstract

Kementerian Pekerjaan Umum dan Perumahan Rakyat (PUPR) menetapkan lima prioritas utama dalam program kerja tahun anggaran 2023 untuk mempercepat pembangunan infrastruktur dan pemulihan ekonomi pasca pandemi COVID-19. Prioritas ini meliputi kontrak multi-tahun, pembayaran hutang, rehabilitasi dan rekonstruksi bencana, pembayaran eskalasi, dan program padat karya. Presiden Joko Widodo menargetkan penyelesaian program pembangunan seperti Program Prioritas Nasional pada tahun 2024. PT. Fred Marius Sabini Insurance Broker merupakan salah satu perusahaan pialang asuransi di Indonesia. Pialang asuransi memiliki peran utama yaitu menempatkan risiko dari tertanggung ke perusahaan asuransi dan memfasilitasi penyelesaian klaimnya. Penelitian ini menganalisis proses penempatan risiko asuransi Contractors All Risk (CAR) ke perusahaan asuransi oleh PT. Fred Marius Sabini Insurance Broker, memahami proses fasilitasi penyelesaian klaim, serta mengidentifikasi kendala yang dihadapi dalam proses tersebut.Penelitian ini bertujuan untuk mengetahui bagaimana proses penempatan risiko ke perusahaan asuransi dan proses fasilitasi penyelesaian klaim asuransi CAR oleh PT. Fred Marius Sabini Insurance Broker. Penelitian ini menggunakan metode kualitatif deskriptif. Data yang digunakan adalah data primer dan data sekunder. Teknik pengumpulan data yang digunakan yaitu teknik wawancara dan observasi. Kesimpulan yang dapat ditarik dari penelitian ini adalah proses penempatan risiko asuransi ke perusahaan asuransi dan proses fasilitasi penyelesaian klaim dilakukan sesuai dengan Standard Operating Procedure (SOP) yang ada. Dengan beberapa kendala yang ada, PT. Fred Marius Sabini Insurance Broker dapat mengatasi kendala tersebut dengan baik.
Analisis Penyelesaian Klaim Asuransi Kredit Secara Ex-Gratia pada Perusahaan Asuransi Kredit Daerah Oktaviani, Rara; Erizal; Awaloedin, Mulawarman
Ilmu Ekonomi Manajemen dan Akuntansi Vol. 5 No. 2 (2024): Jurnal Ilmu Ekonomi Manajemen dan Akuntansi
Publisher : Universitas Mohammad Husni Thamrin

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.37012/ileka.v5i2.2391

Abstract

Asuransi adalah perjanjian antara perusahaan asuransi dan pemegang polis, di mana pemegang polis membayar premi sebagai imbalan atas jaminan perlindungan finansial jika terjadi risiko yang dijamin dalam polis. Lembaga asuransi didirikan dengan tujuan menerima risiko yang ditransfer oleh pihak lain yang menjalin kesepakatan dengannya. Dalam industri asuransi kredit, peran penting dimainkan dalam mendukung kelancaran aktivitas bisnis dan perdagangan dengan melindungi risiko gagal bayar kredit. Namun, tingginya jumlah tertanggung dan kompleksitas perjanjian polis seringkali menimbulkan perselisihan antara perusahaan asuransi dan pemegang polis. Salah satu bentuk penyelesaian klaim yang sering digunakan adalah klaim ex-gratia, di mana perusahaan asuransi memberikan kompensasi di luar ketentuan formal dalam polis sebagai upaya menjaga hubungan baik dengan pemegang polis.Penelitian ini mengidentifikasi implementasi dan penerapan strategi ex-gratia oleh perusahaan asuransi, peran manajemen risiko untuk mengurangi risiko finansial terkait pembayaran ex-gratia, serta faktor-faktor yang memengaruhi keputusan perusahaan dalam memberikan pembayaran ex-gratia pada kasus klaim kredit. Metode penelitian yang digunakan adalah analisis deskriptif dengan studi kasus pada perusahaan asuransi kredit daerah. Data dikumpulkan melalui wawancara dengan lima informan kunci dan analisis dokumen pembayaran ex-gratia dari 2017-2023. Hasil penelitian menunjukkan bahwa strategi ex-gratia digunakan sebagai kompensasi yang tidak tercantum dalam polis, dengan mempertimbangkan dampak jangka panjang pada reputasi perusahaan. Manajemen risiko penting dalam mengelola risiko hukum terkait pembayaran ex-gratia. Faktor internal seperti rasio klaim, kebijakan perusahaan dan kewenangan direksi, serta faktor eksternal seperti hubungan bisnis dan reputasi perusahaan.
Perbandingan Algoritma Naive Bayes Classifier dengan K-Nearest Neighbor (K-NN) Pada Ulasan Aplikasi Youtube Di PlayStore Azmi Ulwan Dasuki; Erizal
Prosiding Seminar Nasional Teknoka Vol 9 (2024): Proceeding of TEKNOKA National Seminar - 9
Publisher : Fakultas Teknik, Universitas Muhammadiyah Prof. Dr. Hamka, Jakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.22236/teknoka.v9i1.17835

Abstract

Youtube is an application that is still widely used today where Youtube users can watch and post various types of videos ranging from entertainment, news, and insights for free. With the large number of Youtube application users, more and more people are giving comments ranging from positive to negative comments on the Youtube application on the Google Play Store. The purpose of this study is to analyze the sentiment of Youtube application users based on reviews on the Google Play Store. This study went through the stages of data extraction, data labeling, text preprocessing, and also the classification of the Naive Bayes Classifier and K-NN algorithms. After going through the Naive Bayes Classifier and K-NN classification stages, namely the K-NN algorithm produced 81,26% with a precision value of 83,29% and a recall value of 96,29% while the Naive Bayes Classifier algorithm only produced an accuracy value of 78,24%, precision of 82,83% and recall of 92,43%. This means that from the results of the sentiment analysis, the K-NN algorithm is superior to the Naive Bayes Classifier algorithm and public opinion towards the YouTube application is more negative than positive.
Analisis Kinerja Waktu dan Penerapan Building Information Modeling pada Proyek Pembangunan Jasmine Park Apartment Bogor: Time Schedule Analysis and Building Information Modeling Application on Jasmine Park Apartment Bogor Ulil Albab, Ahmad; Erizal
Jurnal Teknik Sipil dan Lingkungan Vol. 6 No. 1: April 2021
Publisher : Departemen Teknik Sipil dan Lingkungan IPB

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.29244/jsil.6.1.11-22

Abstract

Increasing of certainly development requires jobs with high productivity, effectiveness and efficiency. The application of BIM up to four-dimensional modeling (4D) using Tekla Structure software is a solution because it can analyze time performance, determine the causative factors in the event of delays and actions to overcome them. 3D modeling included modeling of foundations, columns, beams, slabs, stairs, and roofs. 4D modeling is conducted by adding work schedule to the 3D modeling that had been made. Time performance analysis was performed using the S-curve method for all buildings in Tower Green Jasmine Park Apartment Bogor construction project. Time performance analysis using the S curve found that this project experienced delays with the highest negative deviation value happened in June 2020 by -13.67%. The main delays in the project occured in procurement of MEP logistics and weather conditions. Work acceleration is carried out by increasing working hours and increasing the number of workers.