Claim Missing Document
Check
Articles

Found 24 Documents
Search
Journal : Computer

ANALISIS BAHAYA PADA AKTIVITAS PEKERJA KETINGGIAN PEMASANGAN KABEL INTERNET FIBER TO THE HOME Dermawan, Dedy; Sumantika, Arsyad
Computer Science and Industrial Engineering Vol 9 No 1 (2023): Comasie
Publisher : LPPM Universitas Putera Batam

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33884/comasiejournal.v9i1.7463

Abstract

Fiber to the Home (FTTH) is becoming more and more popular since it can offer a dependable and quick internet connection. Because they are frequently at a height, the field technician's cabling process calls for both physical and mental fortitude. In this study, the JSA approach was used to identify workplace hazards and suggest preventative strategies to reduce the risk of accidents and other negative work-related outcomes. There are 24 sources of danger listed at a very high level, making the first level of risk very high. Activities that cause hazards must be suspended until the risks may be reduced, according to the AS/NZS 4360:2004 standard semi-quantitative risk assessment guide. Priority 1 is the second degree of risk. Priority level 1 sources of danger include 10 different sources. Controlling it as quickly as feasible is the step that needs to be taken. There are four sources of risk that are categorized as considerable, the third risk level. The necessary course of action is to demand technical advancements. The third priority is the fourth danger level. At priority level 3, there are three sources of risk indicated. The actions that need to be conducted need to be closely watched and supervised. There are 11 sources of risk that are included in the fifth level of risk, which is tolerable.
ANALISIS PENGENDALIAN KUALITAS PRODUK TAHU DI PABRIK TAHU PAK SUSILO Panjaitan, Melva C; Sumantika, Arsyad
Computer Science and Industrial Engineering Vol 9 No 1 (2023): Comasie
Publisher : LPPM Universitas Putera Batam

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33884/comasiejournal.v9i1.7515

Abstract

Tofu factories are small and seldom have sewage treatment facilities because constructing and operating sewage treatment facilities is very expensive. A factory engaged in food production, especially tofu production. The problem at Pak Susilo's tofu factory, employees lack discipline in carrying out each production process and the semi-manual tofu-making process. As a result, the company does not have a standard or SOP (Standard Operating Procedure) in its production process, pays little attention to quality control in each of its production activities, and allows minor problems such as color damage and cutting errors. increased, Analysis using the SQC 7 Method Tool, A. with observations for 20 full days at Pak Susilo's tofu factory and consistent daily defect rates such as defects in texture damage, dirt, color damage, and incorrect reduction of texture damage by 12164 pcs or by 42 .0%, in the second place there is dirt, namely 9382 pcs or 32.4%, in the third order is color damage, which is 4471 pcs or 15.4% and the smallest damage is one of the cuts, which is 2973 or 10.3% .
PERANCANGAN TATA LETAK RAK PENYIMPANAN BAHAN BAKU DI WAREHOUSE PT. BBA Sitohang, Berry Ramlan; Sumantika, Arsyad
Computer Science and Industrial Engineering Vol 9 No 2 (2023): Comasie
Publisher : LPPM Universitas Putera Batam

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33884/comasiejournal.v9i2.7592

Abstract

Penelitian ini bertujuan agar dapat memberikan usulan perbaikan tata letak rak penyimpanan bahan baku pada warehouse PT BBA, sehingga dapat memangkas jarak perpindahan bahan baku dengan jarak yang lebih efektif dan efesien. Dengan mengoptimalkan perpindahan pada rancangan layout alternatif yang lebih pendek. Pada penelitian ini digunakan metode Activity Relationship Chart, dan aplikasi BLOCPLAN. Dari hasil penelitian yang dilakukan layout awal warehouse PT BBA tidak optimal oleh karena itu maka perlu dilakukan perbaikan perencanaan tata letak rak penyimpanan bahan baku dengan jarak yang lebih pendek dari segi penempatan bahan baku berdasarkan tingkat kebutuhan pada produksi. Hasil yang diperoleh dari analisis layout usulan dengan metode Activity Relationship Chart dan BLOCPLAN dapat lebih pendek dari layout sebelumnya dengan mempertimbangkan derajat kedekatan antar fasilitas. Perbandingan jarak awal 91,4m2 dan layout alternatif 78,77m2 maka didapatkan efisiensi layout alternatif 12,63m2 dan efisiensi sebesar 13,81%.
ANALISIS KESEHATAN DAN KESELAMATAN KERJA PADA KARYAWAN PROSES DEBURING DI PT YEAKIN PLASTIC INDUSTRY Fitri, Retika Thanesa; Sumantika, Arsyad
Computer Science and Industrial Engineering Vol 9 No 3 (2023): Comasie
Publisher : LPPM Universitas Putera Batam

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33884/comasiejournal.v9i3.7698

Abstract

In this process, employees who carry out deburing activities have various risks of work accidents and hazards that can be detrimental to employees and the company. Like a hand squeezed by a machine, the residual dust that is generated can cause coughing and shortness of breath. In January 2022 there was a work accident that caused an employee's hand to be injured because it was pinched by a machine in the injection molding department. The purpose of this study is to prevent work accidents and implement OHS with the aim of improving the performance of employees, especially in the deburing work process. The method used is Hazard Identification Risk Assessment and Determining Control (HIRADC). The results of the study were that there were no more types of hazardous activities or situations with extreme and high levels of risk, activities or hazardous situations with moderate risk levels became 42 risks (70%), activities or hazardous situations with low levels of risk became 5 risks (8.33%).
PENENTUAN UPAH INSENTIF MONTIR BENGKEL CAT BERDASARKAN OUTPUT STANDAR PRODUKSI Christman, Christman; Sumantika, Arsyad
Computer Science and Industrial Engineering Vol 9 No 4 (2023): Comasie
Publisher : LPPM Universitas Putera Batam

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33884/comasiejournal.v9i4.7711

Abstract

As a gesture of appreciation for successful accomplishments or performance, incentives might take the shape of higher pay, bonuses, prizes, or other rewards. Giving incentives is mostly done to boost the receivers' productivity, motivation, and performance. The Gantt Task and Bonus System method requires the workshop to spend Rp. 5,320,000 and Rp. 5,590,000 in the third and fourth weeks of May, respectively. The method used in this study is production standard output, which results in the calculation of each method being that the workshop needs to spend these amounts. The workshop must pay Rp. 4,864,000 and Rp. 5,044,500 for the Taylor Piece Wage method in the third and fourth weeks of May, respectively. The workplace only pays minimum wage to those who fall short of the goal they were assigned, and those who meet or surpass the goal are awarded an incentive worth 20% of their regular pay
ANALISIS PENGENDALIAN KUALITAS PRODUK PLASTIK DI PT. YEAKIN PLASTIC INDUSTRY Ardianto, Septian Faris; Sumantika, Arsyad
Computer Science and Industrial Engineering Vol 9 No 8 (2023): Comasie
Publisher : LPPM Universitas Putera Batam

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33884/comasiejournal.v9i8.7964

Abstract

In an increasingly advanced age, All kinds of work and ways change very quickly every year. oth in the field of service and manufacturing. Pt yeakin plastic industry has 3 lines one of which is plastic production, in the manufacture of its own plastic products, pt yeakin plasticindustry batam only production material that has become plastic roll into plastic polybag based on the results of observational research in the field, in finding problems in the quality of the product and in finding various defects in the product that cause the quality of plastic to be decreased and not in accordance with the standard. Procedures based on standards set by the company, the company sets its own target of a maximum of 5% of total production in the production process.the purpose of this study is to identify the level of variation in defects in the plastic production process, triggering the types of defects that occur in plastic during the cutting process at PT Yeakin Plastic Industry Batam
ANALISIS PENILAIAN KINERJA SUPPLIER PADA PT IDCSS Riyan, Ian; Sumantika, Arsyad
Computer Science and Industrial Engineering Vol 9 No 8 (2023): Comasie
Publisher : LPPM Universitas Putera Batam

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33884/comasiejournal.v9i8.7974

Abstract

The best performance assessment of suppliers in the company is an effort to improve the quality of service and provide the best products to customers. The effort aims to keep the company competitive by minimizing discrepancies in the supply chain flow. Research was conducted on PT IDCSS to find the best performing suppliers in meeting the needs of artificial ornamental plant products, to minimize problems arising from the supply of inappropriate products. The method used in this research is the VPI frame worked Analytical Hierarchy Process (AHP) method with the main criteria of Quality, Cost, Delivery, Flexibility and Response which are divided into 17 sub-criteria. The results showed that the highest weights were the delivery criteria (0.389), cost (0.294), quality (0.157), response (0.108) and flexibility (0.052). The assessment results on supplier performance supplier MIS (0.260), YOH (0.256), FYG (0.244), CIL (0.129) and supplier SAM (0.112). This shows that supplier MIS has the best performance as a supplier of artificial ornamental plant products for PT IDCSS.
ANALISIS PENGENDALIAN KUALITAS PRODUK KEBAYA DI UKM MARSADA SONGKET KEBAYA DAN TAILOR Giro, Monica; Sumantika, Arsyad
Computer Science and Industrial Engineering Vol 11 No 2 (2024): Comasie Vol 11 No 2
Publisher : LPPM Universitas Putera Batam

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33884/comasiejournal.v11i2.9024

Abstract

Marsada Songket Kebaya and Tailor is a business engaged in convection in the form of services that are still classified as micro that produce products in the form of kebaya and songket. The purpose of this study is to identify the factors that cause defective products in the production process, find out the types of defects that occur and make recommendations for improvement. The methods used are Define, Measure, Analyze, Improve, Control (DMAIC) and Failure Mode and Effect Analysis (FMEA). Based on the results of the study, the defects that occurred in Marsada Songket kebaya and Tailor were sewing defects, accessories defects and fabric defects. The recommendation for improvement is to set SOPs in accordance with work standards so that they can be carried out more efficiently and effectively.
PENGEMBANGAN PRODUK TEMPE DI UKM "TEMPE TITIK 2" Solikhi, Mohammad Whildhan; Sumantika, Arsyad
Computer Science and Industrial Engineering Vol 11 No 1 (2024): Comasie
Publisher : LPPM Universitas Putera Batam

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33884/comasiejournal.v11i1.9026

Abstract

Tempe is one of the original Indonesia folk foods that is starting to become popular in the world. The tempe processing industry is classified as a micro, small and medium industry. In the face of increasingly tight business competition, companies are required to continue to develop in order to be able to face existing competition. SMEs in Batam City, precisely in Kav Sei Lekop Kec. Sagulung, a business operating in the food processing industry, uses soybeans as raw materials which are processed into tempeh. The aim of this research is to analyze the development of tempeh products using the QFD (Quality Function Deployment) method. The subjects of this research are the parties involved in Tempe Titik 2 UKM and their consumers. Determination of sample size using the Slovin formula. Based on the results of the data and analysis, it is known that there are 8 attributes that consumers want, while the HOQ (House of Quality) results on the customer needs indicator obtained the largest value, namely the value of tempeh availability. product, while the functional indicator that obtains the greatest value is the form value. and the size of the tempeh product is as expected and UKM "Tempe Point 2" must add or change the shape and size of the tempe product, in order to be able to compete in the market and meet consumer demand.
ANALISIS PERBAIKAN VARIABILITAS KUALITAS PRODUK DONAT PADA UKM DONAT RAFAEL Tarihoran, Maya; Sumantika, Arsyad
Computer Science and Industrial Engineering Vol 11 No 2 (2024): Comasie Vol 11 No 2
Publisher : LPPM Universitas Putera Batam

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33884/comasiejournal.v11i2.9060

Abstract

Rafael Donut UKM is one of the small businesses that produce donuts with various kinds of toppings, along with the business of donut products experiencing problems, namely the high variability rate, so it is necessary to conduct research to reduce the product variability rate. The methods used to analyze variability, namely with Six Sigma and Taguchi Method to design quality improvements, are carried out by making Taguchi experiment designs as the right and optimal parameters. The parameter design used in this study is an orthogonal array matrix 16 with four level designs and five influencing factors. The results of the study show that these five factors can affect the variability number and design proposals generated from the Taguchi experiment based on the SNR of the effects, namely A4, B4, C4, D4 and E4. Based on research, it shows that product quality variability requires quality parameters to be designed to maintain the expected product quality