Claim Missing Document
Check
Articles

Found 13 Documents
Search

Pelatihan Pembuatan Bahan Ajar Berbasis Powtoon dalam Meningkatkan Kompetensi Guru SMKN 2 Batam Gladies Imanda Utami Rangkuty; Stivani Ayuning Suwarlan; Ade Jaya Saputra
Madani: Jurnal Pengabdian Masyarakat dan Kewirausahaan Vol 1 No 1 (2022): Oktober 2022
Publisher : LPPM Universitas Internasional Batam

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.37253/madani.v1i1.7219

Abstract

Kesiapan Pendidikan Indonesia dalam dampak yang di akibatkan oleh Penyebaran Covid-19 mengharuskan dunia pendidikan mengatur strategi dalam mencapai pembelajaran yang efektif secara daring. Dalam proses pembelajaran merupakan hal yang sangat penting dalam memahami setiap materi sehingga diperlukan penerapan dalam meningkatkan sarana pembelajaran untuk proses pembelajaran yang interaktif secara daring. Oleh sebab itu kegiatan pengabdian kepada masyarakat ini dilakukan dengan tujuan untuk memberikan pelatihan dan pendampingan dalam penerapan media presentasi powtoon kepada guru SMKN 2 Batam yang diharapkan dapat mendukung dan meningkatkan proses pembelajaran dalam menghadapi kelas online. Metode kegiatan pengabdian dilaksanakan dalam bentuk pelatihan dan pengenalan terhadap penerapan powtoon untuk pembuatan bahan ajar yang infografis dan efektif dilakukan dengann gocus group discussion, pelatihan, serta pendampingan. Hasil dari pengabdian masyarakat ini adalah dapat meningkatkan kompetensi guru SMKN2 dalam menyajikan bahan ajar yang lebih infografis dan efektif.
Musholla Building Planning Assistance at SMA Negeri 26 Batam Ade Jaya Saputra; Bennedict Christopher Huang; Rafi Samudra Indrawan; Kurnia Gilang Ramadhani; Rizska Dwi Kartika; Malvin Iuryanto
ConCEPt - Conference on Community Engagement Project Vol. 4 No. 1 (2024): Conference on Community Engagement Project
Publisher : Universitas Internasional Batam

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

A building is an infrastructure with several structural and architectural components erected to help all human activities. Mosques and mushollas are buildings that become unique places of worship for Muslims. The existence of Musholla has grown as a necessity for many infrastructures, including factories, offices, and schools or madrasas. Public facilities such as mosques and mushollas require calculations in terms of sound design because of the broad land. An expert with experience making building designs is needed to get the design as expected. This is the main requirement of what is expected by SMAN 26 Batam. The school plans to build a mosque or musholla because it does not have a place yet to worship and do other religious activities for the Muslim community inside the school. The purpose of this community service is to assist in the planning process of the musholla construction, where the project is expected to benefit the school community later. The output of this activity is the submission of 2D and 3D designs and drawings, calculation of a Budget Estimate Plan (BEP), and construction implementation project schedule (Banana Curve).
A Bridge Planning Simulation with Building Information Model: Steel Frame Structure Siti Tasyah Dea Fitri Pratama; Andri Irfan Rifai; Ade Jaya Saputra; Joewono Prasetijo
Journal Research of Social Science, Economics, and Management Vol. 4 No. 2 (2024): Journal Research of Social Science, Economics, and Management
Publisher : Publikasi Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.59141/jrssem.v4i2.714

Abstract

This paper presents a detailed approach to bridge planning and modeling using Building Information Modeling (BIM), focusing on steel frame structures. The implementation of Autodesk Revit Version 2024.1 significantly enhances the precision and efficiency of the planning and modeling process. The methodology involves gathering detailed data references, creating 2D drawings, and developing a comprehensive 3D model for structural analysis and construction design. In the bridge modeling phase, the trusses are constructed using advanced BIM tools, ensuring the structural elements are aligned accurately with the reference framework. This approach facilitates better stakeholder collaboration, improved communication, and more effective resource management. Using BIM technologies and precise data representation in the simulation contributes to better design outcomes, higher accuracy, and improved safety and compliance verification in bridge construction projects. The results demonstrate that integrating BIM in steel frame bridge planning leads to enhanced project efficiency, reduced construction errors, and optimized material use, ultimately supporting long-term sustainability in infrastructure development.