PENGARUH PENERAPAN WORK FROM HOME (WFH) DAN STUDY FROM HOME (SFH) TERHADAP AKTIVITAS BELAJAR MENGAJAR MATA KULIAH TEORI Purba, Jhon Hericson; Andayani, Nur Rahmah
JOURNAL OF DIGITAL EDUCATION, COMMUNICATION, AND ARTS (DECA) Vol 4 No 01 (2021): Journal of Digital Education, Communication, and Arts (DECA)-March 2021
Publisher : Pusat Penelitian dan Pengabdian Masyarakat, Politeknik Negeri Batam

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30871/deca.v4i01.2868

Abstract

The purpose of this study is to determine the implementation and measure the level of teaching and learning activities during the implementation of WFH and SFH. The case studied is theory courses at Politeknik Negeri Batam. The implementation of work from home (WFH) and study from home (SFH) is a learning method that is carried out when there is an urgent situation, namely the outbreak of Covid-19 virus in the world. The research was conducted using a descriptive analysis method with a percentage. The data were collected using observation sheets, questionnaires, and analyzed using a Likert scale. The results of the observations stated from 15 lecturers shows that 99.77% of lecturers carried out indirect online learning and 0.333% of them carried out direct online learning. The sample of this study is 120 students who were taken randomly from all of Politeknik Negeri Batam students taking general education as the population. The results of the hypothesis testing using SPSS stated that there is a positive effect of the implementation of WFH and SFH on teaching and learning activities by 43.9% and the t test results in a significant value of 0.00 <0.05 from the real level. The results of the tcount (9,610) > t table (1.986) so it can be concluded that H0 is rejected and Ha is accepted, that there is a positive effect of the application of WFH and SFH on teaching and learning activities with the indicators of teaching and learning activities for the WFH and SFH method being Achievement, Critical thinking, Communication Interaction, Teaching Role, and Evaluation system.
Rancang Bangun Aplikasi Sistem Informasi Organisasi Mahasiswa (SIOMAH) Swono Sibagariang; Afdhol Dzikri; Dodi Prima Resda; Jhon Hericson Purba
JURNAL MAHAJANA INFORMASI Vol 6 No 2 (2021): JURNAL MAHAJANA INFORMASI
Publisher : Universitas Sari Mutiara Indonesia Medan

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.51544/jurnal mi.v6i2.2446

Abstract

Organisasi Mahasiswa merupakan wadah dan sarana untuk menyalurkan kreatifitas dan potensi di bidang penalaran dan keilmuan, minat dan bakat, upaya perbaikan kesejahteraan mahasiswa, dan pengabdian pada masyarakat. Keaktifan mahasiswa dalam berorganisasi mempunyai manfaat untuk memperluas jaringan, melatih jiwa kepemimpinan (leadership), melatih mental berbicara di depan publik (public speaking), mudah memecahkan masalah (problem solving) dan juga meningkatkan wawasan dan pengetahuan Mahasiswa. Politeknik Negeri Batam merupakan salah satu perguruan tinggi vokasi di Kepulauan Riau yang cukup aktif dalam kegiatan organisasi mahasiswa namun sampai saat ini, dalam menjalankan proses administrasi masing-masing ormawa masih menggunakan cetakan kertas dan dikelompokkan menjadi arsip dokumen, sehingga membutuhkan waktu yang banyak dan rentan kehilangan dokumen. Oleh karena itu, dibutuhkan sistem informasi yang dapat membantu kendala tersebut. Pada penelitian ini akan dibangun sistem informasi organisasi mahasiswa (SIOMAH) berbasis website yang dapat mempermudah mahasiswa, organisasi mahasiswa, pembina dan bagian kemahasiswaan untuk mengetahui kegiatan kemahasiswaan dan juga memudahkan dalam proses administrasi organisasi mahasiswa. Metode pengembangan menggunakan waterfall, bahasa pemrogaraman menggunakan PHP dan MySQL sebagai basis data. Hasil dari penelitian ini adalah sebuah website yang dapat digunakan sebagai transaksi dan informasi data administrasi organisasi mahasiswa.
Analisis Efisiensi Gas Turbine Unit 2 Sebelum dan Sesudah Overhaul di PLTGU Tanjung Uncang Purba, Jhon Hericson; Yuwana, Farraz Akbar
Jurnal Teknologi dan Riset Terapan (JATRA) Vol. 6 No. 1 (2024): Jurnal Teknologi dan Riset Terapan (JATRA) - June 2024
Publisher : Politeknik Negeri Batam

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30871/jatra.v6i1.7033

Abstract

An overhaul was conducted for maintenance on Gas Turbine unit 2, type SGT 800 at PLTGU Tanjung Uncang, with the purpose of preventive maintenance. The operating hours of the gas turbine exceeded the maintenance schedule, reaching around 36,000 working hours, whereas maintenance should have occurred between 20,000 to 30,000 working hours. The discrepancy between the actual working hours and the standard maintenance schedule for the gas turbine was due to the Tanjung Uncang power plant operating on a base load system, requiring the turbine to run continuously for 24 hours. This study aims to analyze the thermal efficiency, heat rate, and specific fuel consumption before and after the overhaul. The method used in this study is the thermodynamic analysis calculation of the Brayton cycle. By performing thermodynamic analysis to determine the gas turbine's efficiency and calculating specific fuel consumption, heat rate, and thermal efficiency under load, the comparison of the gas turbine's efficiency values can be determined. The thermal efficiency after the overhaul increased by 5.17%. The heat rate after the overhaul decreased by 1867.806 kJ/kWh. The specific fuel consumption after the overhaul decreased by 0.037 kg/kWh. The overhaul impacted the maximum load that could be produced by gas turbine unit 2. Before the overhaul, the maximum load was 36 MW. After the overhaul, the maximum load increased to 45 MW. This increase in load is influenced by temperature, fuel flow rate, and pressure.
Pengembangan Motion graphic HSE Induction Sebagai Media Informasi untuk Pengunjung PT. SWS Batam Indonesia Suandi, Fadli; Dinata, Annisa Hafira; Purba, Jhon Hericson; Rumodhon, Berliansyah
Jurnal Pustaka Data (Pusat Akses Kajian Database, Analisa Teknologi, dan Arsitektur Komputer) Vol 5 No 1 (2025): Jurnal Pustaka Data (Pusat Akses Kajian Database, Analisa Teknologi, dan Arsitekt
Publisher : Pustaka Galeri Mandiri

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.55382/jurnalpustakadata.v5i1.981

Abstract

Penjelasan materi safety pada setiap kunjungan menjadi hal yang wajib dan sangat penting, HSE (Health Safety Environment) merupakan salah satu langkah awal tentang pengenalan perusahaan sebagai tanggung jawab atas keselamatan dan kesehatan seluruh pegawai dan juga visitor maupun pegawai baru. Berdasarkan data kunjungan pada tahun 2021 hingga tahun 2022, terdapat 24 hingga 50 orang jumlah visitor dalam waktu satu hari yang datang ke PT. Sumitomo Wiring Systems Batam Indonesia. Berdasarkan data tersebut membuat penyampaian HSE Induction harus dilakukan terus menerus. Permasalahan dalam penyampaian informasi tentang HSE Induction yang belum memaksimalkan media yang menarik, interaktif dan media pembelajaran aplikatif dalam penyampaian HSE Induction. Solusi dari masalah ini dapat diselesaikan dengan menggunakan media audio visual seperti motion graphic dengan menggunakan pengembangan produk multimedia Villamil-Molina dan juga analisis produk menggunakan metode EPIC Model. Hasil dari penelitian ini adalah video motion graphic HSE Induction, dan analisis menggunakan EPIC Model mendapatkan nilai 4,38 masuk pada kategori “Sangat Setuju” hal ini menunjukan HSE Induction sangat efektif sebagai media informasi untuk menyampaikan HSE Induction oleh perusahaan.
Analisis High Vibration Demin Make Up Pump di PLTGU Tanjung Uncang Purba, Jhon Hericson; Rocky Rahmad Saputra
Journal of Applied Electrical Engineering Vol. 9 No. 1 (2025): JAEE, June 2025
Publisher : Politeknik Negeri Batam

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30871/jaee.v9i1.9428

Abstract

Masalah yang terjadi di PLTGU Tanjung Uncang adalah terjadi indikasi vibrasi tinggi di Demin Make Up Pump B sehingga dilakukan penelitian yang berfokus pada analisis penyebab vibrasi yang terjadi dan solusi untuk menanganinya. Metode penelitian yang digunakan adalah pengambilan data dilapangan dan analisis vibrasi menggunakan analisis fishbone dengan data acuan berdasarkan ISO 2372. Dari hasil pengukuran yang telah dilakukan ditemukan nilai vibrasi tinggi pada sisi Axial DE sebesar 5.5 mm/s dan Axial NDE sebesar 4.8 mm/s. Penyebab nilai vibrasi menjadi tinggi yaitu misalignment dan kerusakan rubber coupling. Setelah perbaikan selesai dilakukan pengukuran ulang ditemukan nilai vibrasi tertinggi hanya pada sisi Horizontal DE 1.4 mm/s dan di sisi Radial NDE 1.4 mm/s.  Hal itu mengindikasikan bahwa Demin Make Pump dalam kondisi yang baik dan siap untuk di operasikan kembali.