Claim Missing Document
Check
Articles

ANALISIS EKONOMI RANCANGAN PLTS UNTUK KAWASAN WARISAN BUDAYA DUNIA JATILUWIH Sinaga, P. M.; Ariastina, W. G.; Sukerayasa, I W.; Giriantari, I. A. D.; Setiawan, I N.; Satya Kumara, I N.
Jurnal SPEKTRUM Vol 10 No 4 (2023): Jurnal SPEKTRUM
Publisher : Program Studi Teknik Elektro UNUD

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24843/SPEKTRUM.2023.v10.i04.p24

Abstract

Bali is a province in Indonesia that is progressive in utilizing renewable energy, by making a policy to create Bali Clean Energy, which aims to develop renewable energy including solar energy. Even though several Solar Power Plant developments have been carried out in Bali, it still needs to be accelerated in its application to achieve the set targets. In this study, the Jatiluwih Heritage Area was chosen as the location for designing a Rooftop solar power plant. Jatiluwih is a Village that became a World Cultural Heritage designated by UNESCO in 2012. The methods used in this research are interviews, literature studies, and scientific studies based on related journals. This study uses two scenarios, namely the load usage scenario and the roof area scenario. There are 45 buildings that have tourism activities in the Jatiluwih DTW area, with a daily electricity requirement of 225.37 kWh/day. Based on the criteria for installing a Rooftop Solar Power Plant, there were five buildings that met the criteria, namely Dukuh Batur Villa, Teras Subak Homestay, Warung Dhea, Iga Lawar Restaurant, and Bhuana Agung Restaurant. Based on the investment feasibility study using the Net Present Value, Profitability Index, and Payback Period methods, it shows that the investment in designing a Rooftop Solar Power Plant with a scenario based on load requirements has 2 feasible buildings, namely the Iga Lawar Restaurant and Bhuana Agung Restaurant, and based on the roof area scenario it shows the design investment Solar Power Plant Jatiluwih World Cultural Heritage Area is not feasible to implement.
RANCANGAN PLTS ATAP DI GEDUNG RUMAH JABATAN GUBERNUR PROVINSI BALI Ayu Anggasari, Ni Luh; Dwi Giriantari, Ida Ayu; Sukerayasa, I Wayan
Jurnal SPEKTRUM Vol 10 No 4 (2023): Jurnal SPEKTRUM
Publisher : Program Studi Teknik Elektro UNUD

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24843/SPEKTRUM.2023.v10.i04.p15

Abstract

Indonesia aims to achieve a 23% utilization of new renewable energy (EBT) by 2025. This form of clean and sustainable energy derives from sources such as solar, water, mini/microhydro, geothermal, and bioenergy, all of which have minimal to no environmental impact. The Provincial Government of Bali has introduced a directive to promote the adoption of EBT. The choice of the Bali Provincial Governor's Office for this initiative stems from its significant electricity consumption and its potential to serve as a model for photovoltaic solar (PLTS) development in Bali.This study delves into the conceptualization of a PLTS system installed atop the Bali Provincial Governor's residence. The design process involves determining the appropriate quantity of solar panels for the roof, evaluating the potential electrical output of the PLTS, selecting the specific PLTS model and inverter for implementation. To aid in this endeavor, the Helioscope software is employed, aiding in the visualization of the PLTS layout and its potential energy generation.Four distinct scenarios were considered in this study: In Scenario 1, a configuration employing 114 solar modules with a total capacity of 63.7 kWp is proposed, utilizing a single inverter with a capacity of 66 kW. Scenario 2 adopts a setup with 64 solar modules, yielding 35.3 kWp in capacity, coupled with a single inverter boasting 36 kW capacity. Scenario 3 envisions the installation of 142 solar modules generating 78.1 kWp, harmonized with a lone 80 kW inverter. Lastly, Scenario 4 opts for 64 solar modules producing 35.3 kWp, each equipped with 22 microinverters with a capacity of 2000 Watt.
SIMULASI DAN ANALISIS DAMPAK PLTS DAN BESS TERHADAP DROP TEGANGAN PADA SISTEM KELISTRIKAN NUSA PENIDA Pranipata, IND; Kumara, INS; Sukerayasa, IW; Giriantari, IAD; Setiawan, IN; Ariastina, WG
Jurnal SPEKTRUM Vol 11 No 2 (2024): Jurnal SPEKTRUM
Publisher : Program Studi Teknik Elektro UNUD

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Nusa Penida, Nusa Ceningan, and Nusa Lembongan or known as Tiga Nusa are very famous tourist destinations in Bali Province. The growth of tourism in Tiga Nusa has resulted in demand for electrical energy increasing every year. In order to meet the electrical energy needs in Tiga Nusa, the PLN continues to strive to improve the quality of the Nusa Penida electricity system. One of PLN's efforts is to build a Solar Power Plant that is interconnected with BESS. This research aims to analyze the effect of Solar Power Plant and BESS on voltage drops in the Nusa Penida electricity system. This research was carried out by simulation using electricity system dynamic simulation software. The simulation will be carried out with 3 scenarios. The results of this research are that Solar Power Plant interconnected with BESS has a good influence on the Nusa Penida Electricity System, as evidenced by the simulation results for scenarios 2 and 3 which have better voltage drop values compared to scenario 1.
PERANCANGAN PLTMH SUNGAI YEH HA DI KARANGASEM DENGAN TURBIN CROSSFLOW Virgunia, D. A.; Sukerayasa, I W.; Ariastina, W. G.; Setiawan, I N.; Giriantari, I. A. D.; Satya Kumara, I N.
Jurnal SPEKTRUM Vol 11 No 1 (2024): Jurnal SPEKTRUM
Publisher : Program Studi Teknik Elektro UNUD

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24843/SPEKTRUM.2024.v11.i01.p29

Abstract

Yeh Ha River in Ababi Village, Karangasem Regency, Bali, is a river that originates from the Yeh Ha springs and is used as a bathing place. This river has the potential for a new renewable energy source that can be utilized for the Micro Hydro Power Plant (MHPP). Discharge measurements were carried out for a week on one of the Yeh Ha spring source channels during the dry season. The results showed an average discharge of 0.201 m3/s. The discharge data used is the minimum potential energy that can be absorbed. Based on the measured discharge data and the used head of 4.6 m, the Tanaka Suiryoku Turbine Selection Chart shows that the crossflow turbine meets the turbine selection criteria. The results of the analysis and calculations show that the available power at the turbine is 8 kW with an efficiency of 80%. A 3-phase synchronous generator with a permanent magnet rotor was selected based on a comparison of the types, specifications, and characteristics of the generator to match the turbine capacity. The output power generated by the generator is 6 kW with a rotational speed of 1500 rpm and a generator efficiency of 90%.
SIMULASI DAN ANALISIS DAMPAK PLTS DAN BESS TERHADAP KESTABILAN FREKUENSI SISTEM KELISTRIKAN NUSA PENIDA Harahap, RS; Kumara, INS; Sukerayasa, IW; Giriantari, IAD; Setiawan, IN; Ariastina, WG
Jurnal SPEKTRUM Vol 11 No 2 (2024): Jurnal SPEKTRUM
Publisher : Program Studi Teknik Elektro UNUD

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

The islands of Nusa Penida, Nusa Lembongan, and Nusa Ceningan are some of the famous tourist destinations in Bali. The growth of tourism in the area has increased the demand for electrical energy. PLN is committed to improving infrastructure by building a solar power plant and BESS in Nusa Penida. This research aims to analyze the impact of implementing PLTS and Battery Energy Storage Systems (BESS) on the frequency of the electricity system in Nusa Penida. This research uses a simulation with two scenarios in three different conditions. Scenario 1 is simulated by releasing the Cogindo generating unit from the Nusa Penida electricity system with three conditions, namely an electricity system without PLTS and BESS, an electricity system with PLTS, and an electricity system with PLTS and BESS. Scenario 2 is simulated by removing the Ceningan feeder from the Nusa Penida electricity system with the same three conditions. Simulations were carried out to determine the effect of PLTS and BESS on frequency changes. The simulation results show that frequency changes are still within the limits regulated by the Minister of Energy and Mineral Resources Regulation Number 20 of 2020.
ANALISIS AIR CONDITIONER PADA KOMPLEK PERUMAHAN DI KOTA DENPASAR Bhuana, I.G.A.T.; Kumara, I.N.S.; Giriantari, I.A.D.; Ariastina, W.G.; Setiawan, I.N.; Sukerayasa, I.W.
Jurnal SPEKTRUM Vol 11 No 2 (2024): Jurnal SPEKTRUM
Publisher : Program Studi Teknik Elektro UNUD

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Green building retrofit is an approach that involves modifying or enhancing existing buildings to achieve higher standards of sustainability and energy efficiency. By conducting an energy audit first, it's possible to identify potential energy savings in the housing, as well as components that need to be upgraded to reach the desired level of sustainability. Retrofit solutions may include the use of implementation of efficient HVAC systems, energy-saving lighting, and better energy management. The aim of this research is to explore the potential improvements that can be applied through Green Building Retrofit with a focus on energy efficiency and sustainability in Jadi Pesona II Barat Housing, comparing the energy consumption conditions of houses before and after the energy audit, as well as calculating the payback period for occupants after the retrofit implementation. After the energy audit and Green Building Retrofit, daily energy usage in homes in Perumahan Jadi Pesona II Barat decreased from 47.45 kWh per day to 36.91 kWh per day. This indicates a reduction of 10.54 kWh per day or approximately 22.22% from the previous conditions, and the payback period analysis results show that almost all air conditioners show values in line with the project investment feasibility parameter, which is below 4.2 years.
POTENSI PRODUKSI PLTS ATAP GEDUNG RUSUNAWA UNIVERSITAS UDAYANA Partogi Manalu, Eli Musa Reja; Ariastina, Wayan Gede; Dwi Giriantari, Ida Ayu; Setiawan, I Nyoman; Sukerayasa, I Wayan; Satya Kumara, I Nyoman
Jurnal SPEKTRUM Vol 10 No 4 (2023): Jurnal SPEKTRUM
Publisher : Program Studi Teknik Elektro UNUD

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24843/SPEKTRUM.2023.v10.i04.p16

Abstract

The government will continue to increase the use of new and renewable energy as a solution to meet electricity needs, one of which is the use of rooftop solar power plants. In this research, the location that will be planned to install rooftop PV solar system is the Udayana University Rusunawa Building. The produced energy will be able to meet the electrical energy need and as well as supporting the government programs in the utilization of new and renewable energy. The capacity of the rooftop PV solar system to be installed is determined based on the load profile of the Udayana University Rusunawa Building. Three different scenarios namely 20 kW, 15 kW and 10 kW PV solar systems have been simulated using a PV solar simulator. Results of the simulation scenarios then are compared to look at the differences among the produced energy.
PERANCANGAN PEMBANGKIT LISTRIK TENAGA SURYA (PLTS) PADA ATAP GEDUNG WISTI SABHA BANDAR UDARA INTERNASIONAL I GUSTI NGURAH RAI Purna Suartawan, Gede; Dwi Giriantari, I. A.; Sukerayasa, I Wayan; Ariastina, Wayan Gede; Setiawan, I Nyoman; Satya Kumara, I Nyoman
Jurnal SPEKTRUM Vol 11 No 1 (2024): Jurnal SPEKTRUM
Publisher : Program Studi Teknik Elektro UNUD

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24843/SPEKTRUM.2024.v11.i01.p21

Abstract

The installed PLTS capacity in Bali is currently still 3.44% of the target given by the General National Energy Plan (RUEN) of 108 MWp in 2025. The island of Bali has limited land availability so rooftop PLTS is a solution. The design of the rooftop PLTS was carried out on the roof of the Wisti Sabha Building at I Gusti Ngurah Rai International Airport. The research uses PVSyst simulation software while the investment feasibility method uses the Benefit-Cost Ratio (BCR), Net Present Value and discounted payback period (DPP) methods. Based on the simulation results, the rooftop PLTS capacity is 56.6 kWp with energy production of 98,009 kWh/year. The B-CR value obtained is 2.23, the net present value is IDR 707,436,838.55 and the DPP is 7 years, with a rooftop solar system life of 25 years.
OPTIMALISASI LOKASI PEMBANGKIT TERDISTRIBUSI ENERGI TERBARUKAN DENGAN METODE ALIRAN DAYA Sugirianta, IBK; Giriantari, IAD; Ariastina, WG; Swamardika, IB. Alit
Transmisi: Jurnal Ilmiah Teknik Elektro Vol 26, No 4 Oktober (2024): TRANSMISI: Jurnal Ilmiah Teknik Elektro
Publisher : Departemen Teknik Elektro, Universitas Diponegoro

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.14710/transmisi.26.4.192-198

Abstract

Energi surya fotovoltaik (Solar PV) merupakan salah satu solusi energi terbarukan yang ramah lingkungan dan memiliki potensi signifikan untuk dikembangkan sebagai bagian dari integrasi sistem pembangkit terdistribusi (Distributed Generation/DG). DG memainkan peran penting dalam meningkatkan efisiensi sistem tenaga listrik, terutama dalam mengurangi rugi-rugi daya listrik serta meningkatkan kestabilan tegangan jaringan. Penempatan DG yang optimal diharapkan dapat mengurangi rugi-rugi daya dan memperbaiki kestabilan tegangan. Penelitian ini bertujuan untuk meminimalkan rugi-rugi daya total serta meningkatkan kestabilan tegangan menggunakan metode analisis aliran daya yang diimplementasikan melalui perangkat lunak Digsilent. Simulasi aliran beban dilakukan pada sistem distribusi standar 14 bus dengan memasang Solar PV sebagai DG pada setiap bus guna menentukan lokasi penempatan DG yang optimal. Validasi hasil dilakukan dengan membandingkan performa jaringan sebelum dan sesudah penempatan Solar PV sebagai DG. Hasil penelitian menunjukkan bahwa penempatan DG yang optimal dapat mengurangi rugi-rugi daya hingga mencapai indeks sebesar 0,752.
Tinjauan Literatur: Deteksi Anomali Berbasis Analisis Waktu pada CAN Bus Kendaraan Listrik Setiawan, Putu Ayu Citra; Giriantari, Ida Ayu Dwi; ER, Ngurah Indra
ELECTRON Jurnal Ilmiah Teknik Elektro Vol 6 No 1: Jurnal Electron, Mei 2025
Publisher : Jurusan Teknik Elektro Fakultas Teknik Universitas Bangka Belitung

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33019/electron.v6i1.282

Abstract

The development of modern automotive technology emphasizes the importance of vehicle connectivity and autonomy, with the aim of enhancing safety and comfort. Due to its role in managing critical vehicle functions and its vulnerability to security threats, the automotive industry has developed two primary approaches to address CAN Bus security. Therefore, the automotive industry has developed two main approaches to address this security issue. First, passive defense through security protocols that include encryption, authentication, and message verification, and second, anomaly detection using advanced technologies. Several anomaly detection methods have been introduced, including K-Means clustering, Support Vector Machines, and Deep Learning, each offering advantages in detecting specific attack patterns. However, one increasingly popular approach is time analysis, which leverages message inter-arrival patterns and clock skew on the CAN Bus to identify suspicious behavior and detect anomalies in real-time. Although this method has shown effectiveness in detecting various types of attacks, the main challenge lies in its ability to identify highly concealed attacks that may not be visible to traditional methods. This research provides an understanding of various anomaly detection approaches on electric vehicle CAN Bus networks, with a primary focus on time analysis. By reviewing several approaches, this study offers valuable insights into improving the security of electric vehicles and the overall smart transportation ecosystem. The results show that time-based analysis methods can detect various types of attacks, such as spoofing, replay attacks, and denial-of-service, with high efficiency.
Co-Authors Abinanda , IKPT Aditya Perdana Putra Purnomo Agus Ryzky Martha, Gede Agus Selamet Duniaji Ananta Mahanata, I Gusti Putu Ariastina, WG Awgustus Patandean Ayu Anggasari, Ni Luh Bagas Maruli Pangaribuan Baskara Formasakti Bhuana, I.G.A.T. C. G. Indra Partha Caesar, B Cecep Yudhie Rachmat D. A. S. Santiari Derren, M. Dewa Made Wiharta Dewa Nyoman Tri Budiantara Dewa Putu Ari Laksana Diva Aristia, Gusti Bagus Duman Care Khrisne Gallant Pradika Gede Agus Ryzky Martha H. Kristiawan Harahap, RS I G.N.A.B Rama Wahyu Dewangga I Gde Antha Kasmawan I Gde Ari Biantara I Gede Agus Januar Ariawan I Gede Civavisna Brahma I GN Dion Adiputra I Gusti Made Ngurah Desnanjaya I Gusti Ngurah Adhy Pradhana I Gusti Ngurah Winanda Wijaksana I Gusti Putu Mastawan Eka Putra I K. S. T. Lilayoga I Kadek Adi Darmadi I Kadek Adi Febriana Putra I Kadek Juniarta I ketut Gede Darma Putra I Ketut Jati I Ketut Wiryajati I Komang Ogik Parmana Putra I Komang Widi Astawa I Made Aditya Nugraha I Made Agus Sastradiangga I Made Anom Sutrisna Wijaya I Made Dwi Ardiada I Made Sankhya Pranata Adiguna I MADE SUDARMA I Made Wahyu Darmahesta I N Satya Kumara I N. A. P. Putra I N. S. Kumara I N. Setiawan I Nengah Widiana I NS Kumara I Nyoman Budiastra I Nyoman Cita Artawa I Nyoman Setiawan I Nyoman Setiawan I NYOMAN WIJAYA I Putu Adi Pradnyana Wibawa I Putu Andithya Chrisna Budi I Putu Arsikaputra I Putu Eka April Yanto I Putu Putrayana Wardana I W A WINARTA I Wayan Ambarayana I Wayan Arta Wijaya I Wayan Raka Ardana I Wayan Sukerayasa I Wayan Sukerayasa I Wayan Supartha I. K. G. D. Putra I. N. S. Kumara I. P. Krisna Darma Putra I. W. Sukerayasa, I. W. I.G.A.B. Adiputra I.G.A.D. Sasmita I.N.S. Kumara I.N.S. Kumara, I.N.S. I.W. Sukerayasa, I.W. I.W.G.A Anggara Ida Bagus A. Swamardika Ida Bagus Ketut Sugirianta IGA Andita Putra IGA Sri Melati Intan Aprilia Medina Intan Aprilia Medina Junivan Junivan Kadek Agus Nata Riadnyana Kadek Dwi Damarian Kavlin Rafhel Panjaitan Kenny Angel Manik komang jaryanta aryamantara Kumara, I N. S. Kumara, I. N. S. Laili Asdiyan Salsabila Ayu Leba, G. I. M. Lie Jasa Linawati Linawati Linawati Linawati Luh Ria Atmarani M Sudarma M. Sudarma M.R. Wicaksana M.T. S.T. I Wayan Sutaya . Made Aryawan Made Sudarma Made Sudarma Made Sumantera mahadi putra Marcelinus Anggiat Situmorang Margareta Yuniari Michael Candra Santoso N. A. Kartono N. M. G. A. Krisnayani N. W. Sindi Nadhif Dewayana, Zevardy Natapathy, Ranga Bayu NEVIATY PUTRI ZAMANI Ngakan Satria Utama Ngurah Indra ER Ni Made Neli Lestari Ni Made Wartini Norberto Soares Oya Iman Sanjaya P. M. Prihatini P.A. Sujana Partogi Manalu, Eli Musa Reja Poppy Diana Sari Pranipata, IND Purna Suartawan, Gede Putu Manik Prihatini Richard Antony Suatan Risky Aswi R, Risky Rukmi Sari Hartati Santiari, D. A. S. Setiawan, I N. Setiawan, I.N. Setiawan, IN Setiawan, Putu Ayu Citra Simon Junior Sinaga, P. M. Sugirianta, Ida Bagus Ketut Sukerayasa, IW Suriana, I Wayan Swamardika, IB. Alit Tjok Gede Indra Partha Virgunia, D. A. W. G Ariastina W.G. Ariastina Wahyudi Ernest Putra Wayan Gede Ariastina Wayan Gede Ariastina Widiandika Putra, I Wayan Dicky Widianto, I. G. A. Wira Dharma, Gede Agus Wulandari, NKN Yohanes Made Arie Prawira Yudha Anggara Putra Yusuf Firmansyah, Ahmad