Analisis Keandalan Sistem Proteksi Kebakaran Pada Gedung Integrated Laboratory, Universitas Riau Ghina Mardhatillah; Iriana, Rian Trikomara; Djuniati, Sri; Sandhyavitri, Ari
SAINSTEK Vol. 13 No. 1 (2025)
Publisher : Sekolah Tinggi Teknologi Pekanbaru

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.35583/js.v13i1.261

Abstract

Suatu Gedung harus dipertimbangkan keandalan sistem proteksi kebakaran sesuai dengan Peraturan Menteri Pekerjaan Umum Nomor 26 Tahun 2008. Gedung Integrated Laboratory (IL) Universitas Riau merupakan bangunan pendidikan dengan fasilitas penelitian yang lengkap yang bertujuan untuk tempat praktik sains dan penelitian tangkat tinggi. Oleh karna itu pentingnya menerapkan sistem proteksi kebakaran yang andal untuk melindungi penghuni dan peralatan sensitifnya. Penelitian ini bertujuan untuk menganalisis dan mengetahui tingkat keandalan Gedung Integrated Laboratory (IL), sehingga saat Gedung beroperasi tingkat resiko terjadinya kebakaran dapat diminimalisir. Penelitian ini menggunakan metode Checklist. Metode checklist dilakukan dengan cara membandingkan sistem yang terpasang pada Gedung Integrated Laboratory dengan ketentuan Peraturan Menteri Pekerjaan Umum Nomor 26 tahun 2008 dan Puslitbang Pemukiman Departemen Pekerjaan Umum (PD-T-11-2005-C). Hasil yang didapatkan dari metode checklist tersebut berupa nilai pembobotan dimana nilai yang diperoleh tersebut memiliki tingkatan masing-masing keandalan gedung. Tingkat keandalan Gedung memiliki rentang nilai yaitu jika ?60% maka dinyatakan kurang, jika >60% dan ?80% maka dinyatakan cukup, dan jika >80% hingga ?100% dinyatakan andal. Nilai keandalan Gedung Integrated Laboratory dengan metode Checklist didapatkan nilai yaitu kelengkapan tapak dengan 4 indikator sudah terpenuhi 100% dengan bobot yang didapat 25%, jalan lingkungan dengan 2 indikator sudah terpenuhi 100% dengan bobot yang didapat 22,4%, sistem proteksi pasif dengan 3 indikator sudah terpenuhi 90% dengan bobot yang didapat 23,50% dan sistem proteksi aktif dengan 10 indikator sudah terpenuhi 93,75% dengan bobot yang didapat 18,93%. Sehingga dari hasil keseluruhan bobot yang didapatkan sebesar 89,83% dan dari nilai tersebut sudah termasuk dalam rentang "Andal".
Analisis Biaya Dan Produktivitas Pemakaian Alat Berat Pada Kegiatan Pembangunan Jalan Akses Siak IV Pekanbaru Nugraha, Devid; Iriana, Rian Trikomara; Djuniati, Sri
Jurnal Online Mahasiswa (JOM) Bidang Teknik dan Sains Vol 5, No 1 (2018): Wisuda April Tahun 2018
Publisher : Jurnal Online Mahasiswa (JOM) Bidang Teknik dan Sains

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Road construction requires heavy equipment in its work, one of them is road layer. Heavy equipments which currently use is dump truck, excavator, motor greder, water tank truck, tandem roller and wheel loader. The number of heavy equipment to itemized work selected heap, Class B aggregate and A class aggregate are 1 unit excavator, 1 unit wheel loader, 15 unit dump trucks, 1 unit grader motor, 2 unit tandem rollers, 1 unit water tank, selected heap work which use the provisions of the owner is 9 days and the contractor 11 days, class B aggregate work using the provisions of the owner are 7 days and 9 days contractor, A class aggregate work using the provisions of the owner are 5 days and 7 days contractor. The differences in the cost of heavy equipment is Rp.121.650.532 or higher by using contractor's heavy equipment. To determine the heavy equipment with a more efficient cost with a saving percentage of 12.93% then, the contractor must meet the provisions made by the owner with the economical life tool, the condition of the machine and eligible labor.Keywords : Cost analysis, heavy equipment, productivity, road layer
Analisis Keandalan Sistem Proteksi Kebakaran Pada Bangunan Ayola First Point Hotel Pekanbaru Wulandari, Bheti; Trikomara, Rian
Jurnal Online Mahasiswa (JOM) Bidang Teknik dan Sains Vol 5, No 1 (2018): Wisuda April Tahun 2018
Publisher : Jurnal Online Mahasiswa (JOM) Bidang Teknik dan Sains

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

This study is intended to determine the value systems of fire and building safety reliability of Ayola First Point Building of Hotel Pekanbaru in case of fire. Questionnaire of this study was done twice. Analytical Hierarchy Process (AHP) was used for the first questionnaire in order to find out the weighting of fire variable which covers the completeness of its siting, rescuing utilities, passive protection system and active protection system. The second questionnaire used check-list method based on Minister Rules for General Work Number 26 Year 2008 in order to obtain the building’s reliability value in case of fire. The results for the said value for Ayola First Point of Hotel Pekanbaru using AHP and check-list method are, respectively, 91,93% and 91,45%. Therefore, it is concluded that the building’s safety system in case of fire is in “Good” condition.Keywords: Fire, Reliability, AHP
Analisis Faktor Dominan Penyebab Terjadinya Pembengkakan Biaya (Cost Overrun) Pada Proyek Konstruksi Gedung Pemerintah Di Kota Pekanbaru Saputra, Deri Afriza; Iriana, Rian Tri Komara; Sebayang, Mardani
Jurnal Online Mahasiswa (JOM) Bidang Teknik dan Sains Vol 5, No 1 (2018): Wisuda April Tahun 2018
Publisher : Jurnal Online Mahasiswa (JOM) Bidang Teknik dan Sains

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

The implementation of construction especially in Pekanbaru City, the cost factor is the first consideration because of the usually involves the amount of investment that is great for a assignor. Therefore, the cost of the project should manage by a good way that the possibility of swelling (cost overruns) can be minimized. The purpose of this research is to analyze the most dominant factors causing the swelling of costs (cost overrun) at the construction of government building projects in Pekanbaru City. The data collection was done by distributed questionnaires to small contractors in Pekanbaru area. The data collected were analyzed by using validity and reliability test, analysis factor, classical assumption test and multiple linear Regression This data processing by using computer program SPSS (Statistical Product and Service Solution) version 24. From the results of analysis obtained the most dominant factors causing the swelling of costs (cost overrun) in the government building construction project in Pekanbaru city consists of: part of planning and implementation that so many projects are handled simultaneously, the part of coordination of resources, that the shortage of labor. The portion control which is a way of payment that is not timely.Keywords: cost, cost overrun, dominant factor.
Studi Kelayakan Investasi Proyek Pembangunan Pembangkit Listrik Tenaga Uap PLTU Riau 2x110 MW Studi Kasus : Proyek PLTU Riau 2x110 MW Pekanbaru Febrian, Aris; Iriana, Rian Tri Komara; Malik, Alfian
Jurnal Online Mahasiswa (JOM) Bidang Teknik dan Sains Vol 5, No 1 (2018): Wisuda April Tahun 2018
Publisher : Jurnal Online Mahasiswa (JOM) Bidang Teknik dan Sains

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Project PLTU RIAU 2x110 MW is located in Tenayan Raya regency, Pekanbaru, Riau province. The project proposed to support energy demand especially for Riau Province in line to support a national program in order to increase national electricity ratio. This projectneeds high funding to construct therefore, it is necessary for the Government to study and analyze some aspects including financial. 30 % of the project funds came from PT PLN (Persero) equity equal to Rp995.646.470.749,47 while the other 70% which isRp2.323.175.098.415,43 came from loan. Feasibility analysis represents that Net Present Value (NPV) is Rp515.754.288.356,69, Benefit Cost Ratio is 1,05, Internal Rate of Return is12.62%, whereas Payback period is 16 years and 3 months, it represents that this project is feasible. The sensitivity analysis showed that the investment will be sensitive at 177,26%, thebenefit will be sensitive at 93%, the cost at 109% from the original value, and interest will be sensitive at 12,62%. As per deterministic sensitivity analyses from the several variables indicated that the highest to lowest influences in sequence is (1) tariff, (2) r class tariff, (3) operational and maintenance cost, (4) exchange rate, and as per the regression value also indicated that (1) tariff, (2) r class tariff, (3) operational and maintenance cost, (4) exchange rate, has the effect from the highest to lowest variable.Keywords: Finansial Analisys, Net Present Value, Benefit Cost Ratio, Internal Rate of Return, Payback period, Sentivity Analysis.
Evaluasi Risiko Konstruksi Pada Proyek Pembangunan Sadira Plaza Dan Tangram Hotel Pekanbaru Hutasoit, Ardi Wiranata; Malik, Alfian; Iriana, Rian Trikomara
Jurnal Online Mahasiswa (JOM) Bidang Teknik dan Sains Vol 5, No 1 (2018): Wisuda April Tahun 2018
Publisher : Jurnal Online Mahasiswa (JOM) Bidang Teknik dan Sains

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Risk is an uncertain condition or event. A risk has a cause and if the risk occurs, there will be consequences so that an identifiable system must be established to reduce it to a minimum to the acceptable limit. The focus of this research is the risk of the construction of Sadira Plaza and Tangram Hotel Pekanbaru. The purpose of the research is to know the risk variables that affect the project and the design formula of risk management strategy. The research step with the distribution of questionnaires consisting of 9 variables or 50 risk indicators compiled with the dichotomy scale to the employees involved in the project is PT. Waskita Karya (Persero) Tbk as the contractor and PT.Target Optimal System Solutions as Construction Management Consultant obtained a total of 29 respondents with a valid questionnaire. Then the results of the questionnaire processed by using Cochran Q-Test, obtained 6 variables or 17 indicators that cause project risk. Furthermore, to analyze the fish bone diagram used to see the process of project implementation activities so as to know the root cause of the risk and make the formulation of the risk of development project of Sadira Plaza and Tangram Hotel Pekanbaru.Keywords: Fishbone Diagram, Risk, Dichotomy Scale, Cochran Q-Test
Analisis Biaya Pemakaian Alat Berat Pada Proyek Rekontruksi Jalan Batas Kota Pariaman – Manggopoh Kabupaten Padang Pariaman Provinsi Sumatera Barat Syauki, Ilham Ahmad; Iriana, Rian Trikomara; Malik, Alfian
Jurnal Online Mahasiswa (JOM) Bidang Teknik dan Sains Vol 5, No 1 (2018): Wisuda April Tahun 2018
Publisher : Jurnal Online Mahasiswa (JOM) Bidang Teknik dan Sains

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

This research is aimed to analyze and identify the minimum cost of heavy equipment usage on the reconstruction Pariaman-Manggopoh border area Padang Pariaman Regency West Sumatera Province and to give the alternative manufacture and the effective enforcement method in the use of excavator. The calculation is analyzed using Bina Marga method. Based on the result, it is found that building the Aggregate Foundation Layer class A needs minimum cost Rp. 1.587.698.428,60 and building the Asphalt Pavement Layer needs minimum cost Rp. 4.954.643.081,75. The project enforcement can be done through several manufacture alternatives.Keywords : cost analysis, productivity, heavy equipment, and enforcement method
Pembuatan Peta Desa Aur Sati Kecamatan Tambang Kabupaten Kampar Provinsi Riau Adiman, Edi Yusuf; Siswanto, Siswanto; Kurniawandy, Alex; Sebayang, Mardani; Taufik, Hendra; Trikomara, Rian
Jompa Abdi: Jurnal Pengabdian Masyarakat Vol. 3 No. 2 (2024): Jompa Abdi: Jurnal Pengabdian Masyarakat
Publisher : Yayasan Jompa Research and Development

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.57218/jompaabdi.v3i2.1119

Abstract

Desa Aur Sati merupakan desa yang terletak di Kecamatan Tambang, Kabupaten Kampar, Provinsi Riau. Desa ini memiliki potensi yang besar karena di wilayahnya terdapat objek wisata Danau Bokuok. Permasalahannya desa ini belum memiliki peta desa, padahal peta desa merupakan salah satu unsur penting yang harus dimiliki oleh sebuah desa untuk perencanaan pembangunan desa. Tujuan dari kegiatan pengabdian kepada masyarakat ini adalah untuk melakukan pembuatan peta desa yang akurat, komplit dan reperesentatif yang memberikan gambaran secara menyeluruh dari desa. Tahapan yang digunakan dalam pembuatan peta desa ini meliputi survey pendahuluan, survey pelaksanaan, pengolahan data, verifikasi data, finalisasi peta desa, pencetakan peta desa dan penyerahan cetak peta desa. Kegiatan proses pembuatan peta desa ini berjalan dengan lancar dan mendapatkan antusias dari perangkat desa dan masyarakat desa. Hasil peta desa yang dibuat telah terselesaikan dengan baik dimana terdapat gambaran mengenai batas-batas desa, pembagian dusun, informasi jalan, danau, sungai dan bangunan-bangunan lainnya secara akurat dan relevan. Peta desa ini diharapkan dapat memberikan masyarakat Desa Desa Aur Sati Kecamatan Tambang, Kabupaten Kampar, Provinsi Riau kemudahan dalam menentukan prioritas pembangunan dan mempermudah dalam mendeteksi potensi yang ada di desa.
Analisis Penerepan Sistem Manajemen Keselamatan Konstruksi Pada Pekerjaan Gedung Kuliah Terpadu Universitas Riau Mudrika, Aflah Intishoor; Trikomara, Rian; Djuniati, Sri
SAINSTEK Vol. 11 No. 2 (2023)
Publisher : Sekolah Tinggi Teknologi Pekanbaru

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Universitas Riau merupakan salah satu universitas negeri yang berada di Kota Pekanbaru, untuk meningkatkan kualitas pendidikan agar dapat mengembangkan kualitas sumber daya manusia Univeristas Riau melakukan kerja sama dengan Asian Development Bank (ADB) untuk membangun sarana dan prasarana di Universitas Riau salah satu gedung yang dibangun merupakan gedung kuliah terpadu. Pekerjaan ini dilakukan di dalam kampus Universitas Riau, Kampus Bina Widya KM.12,5 Simpang Baru. Pekerjaan pembangunan gedung kuliah terpadu Universitas Riau mempekerjakan lebih dari 100 dan juga memakai alat berat pekerjaan ini berada di dalam lingkungan kampus dimana banyak civitas dan mahasiswa beraktivitas sehingga penting untuk menerapkan SMKK. Agar terwujudnya lingkungan kerja yang aman dan nyaman sehingga terwujudnya zero accident. Penelitian ini menggunakan metode analisis deskriptif kuantitatif. Metode wawancara dan survei lapangan yang dilakukan kepada health safety environment, didapatkan hasil audit SMKK memenuhi dengan Peraturan Menteri PUPR Nomor 10 Tahun 2021. Biaya penerapan SMKK yang didapatkan dari RKK sebesar Rp.804.293.892,002 atau 1,27 % dari total keseluruhan nilai proyek.