Claim Missing Document
Check
Articles

Natural Tourism Potential Assessment Model in Rembang Regency Rizaldi, Artamevia Salsabila; Soesanto, Rayinda Pramuditya; Rizana, Afrin Fauzya; Rumanti, Augustina Asih
Metris: Jurnal Sains dan Teknologi Vol. 23 No. 01 (2022): Juni
Publisher : Prodi Teknik Industri, Fakultas Teknik - Universitas Katolik Indonesia Atma Jaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.25170/metris.v23i01.3571

Abstract

This study identifies the criteria for developing natural tourism potential in Rembang Regency. There are problems, such as on the white sand beach of Wates. There are still attractions that have not been managed, namely the mangroves around the beach that have not been managed and around the tour. There are no lodgings such as hotels and guest houses for tourists, so for now, the distance to the beach can be accessed by vehicle because of quite a distance. To meet the requirements of tourist attraction, five criteria must be met based on the literature study: Attractions, Accommodations, Accessibility, Activities, and Amenities. After obtaining the criteria, a weighting will be carried out for each criterion based on 5A using the AHP approach. Based on the results obtained, it is known that the Accessibility criteria have the highest weight value, followed by the Amenity, Activities, Accommodation and Attractions criteria. Value modelling is carried out to calculate tourism feasibility according to standards.
Perancangan Alat Ukur Potensi Wisata Budaya Pada Kabupaten Rembang Menggunakan Metode SECI dan AHP Amelia, Mia; Septiningrum, Lutfia; Rumanti, Augustina Asih
Metris: Jurnal Sains dan Teknologi Vol. 23 No. 01 (2022): Juni
Publisher : Prodi Teknik Industri, Fakultas Teknik - Universitas Katolik Indonesia Atma Jaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.25170/metris.v23i01.3574

Abstract

Rembang Regency is not a tourist destination in districts or cities in Central Java because tourist visits to tourist objects in Rembang Regency are still relatively small when compared to other areas around Rembang Regency such as Demak Regency, Kudus Regency, and Semarang Regency. The potential for cultural tourism in Rembang Regency is still relatively small compared to natural and artificial tourism. So that the potential to be taken is the potential for cultural tourism. There are six components of tourism development as the basis for research: Attraction, Amenities, Ancillary Service, Activity, Accessibility, and Accommodation. There are additional tourism development components from interviews with the Culture and Tourism Office of Rembang Regency, namely Environment and Human Resources. So that it can be managed clearly and accurately measured and tourism potential can be said to be feasible, it must first design indicators so that tourism managers can find out what must be developed for cultural tourism potential, so that later it is expected to become a tourist destination that can help the economy in the Regency Rembang. This study uses the SECI method (Socialization, Externalization, Combination, and Internalization). After getting the indicator then, calculate the weight using AHP (Analytical Hierarchy Process)
Tourism Industry Supply Chain through Stakeholder Participants: Facing Environment Uncertainty of Post Pandemic Covid-19 Achmad, Fandi; Sriwana, Iphov Kumala; Prambudia, Yudha; Rumanti, Augustina Asih
Metris: Jurnal Sains dan Teknologi Vol. 24 No. 02 (2023): Desember
Publisher : Prodi Teknik Industri, Fakultas Teknik - Universitas Katolik Indonesia Atma Jaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.25170/metris.v24i02.3941

Abstract

The environmental uncertainty due to the COVID-19 pandemic poses severe challenges for all parts of the supply chain in the tourism industry. The focus of the Indonesian government is to improve the condition of the tourism industry, which has experienced a decline in the number of tourists due to the COVID-19 pandemic. A supply chain tourism industry framework was developed through the Support System Facilities (SSF) variable to map the actors in the tourism industry activities in an uncertain environment due to COVID-19. The method in this study uses a qualitative descriptive approach through in-depth interviews, direct observation, and literature study. The results of this study are the tourism industry supply chain conceptual framework which states that there are several stages in distributing services and support systems and facilities to tourists, namely through suppliers, tour operators, tour agencies, and tourists. This finding has practical implications for the government in making a policy strategy.
Perancangan Sistem Customer Relation Management untuk Mengelola Business Partner Pada Banyuwangi Festival IBNU ZULKARNAIN; Augustina Asih Rumanti
Metris: Jurnal Sains dan Teknologi Vol. 24 No. 02 (2023): Desember
Publisher : Prodi Teknik Industri, Fakultas Teknik - Universitas Katolik Indonesia Atma Jaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.25170/metris.v24i02.4516

Abstract

Banyuwangi Festival is an annual event that is a product of regional leading attractions. This event has attracted the attention of tourists from home and abroad, as well as made a significant contribution in improving the economic, tourism and human resources sectors in Banyuwangi. However, the management of Banyuwangi Festival has not used an effective integrated information system. The current ineffectiveness of business partner management is because the follow-up of cooperation is carried out manually at coordination meetings. The purpose of this study is to design an information system that can support effective business partner management, at the Banyuwangi Festival. Odoo's open-source ERP application is used to support the management of business partners on the CRM module. The design of the ERP concept using the Rapid Application Development (RAD) method aims to design system needs that can pay attention to user needs. The result of this study is the effectiveness of monitoring and controlling the progress of business partners for the preparation of the Banyuwangi Festival event which is integrated in the form of a dashboard.
Perancangan Sistem Erp Modul Point Of Sale Berbasis Odoo Pada Banyuwangi Festival Dengan Metode Rapid Application Development Afrananta, Geldisen; Asih Rumanti, Augustina; Ramadani, Luthfi
Metris: Jurnal Sains dan Teknologi Vol. 25 No. 01 (2024): Juni
Publisher : Prodi Teknik Industri, Fakultas Teknik - Universitas Katolik Indonesia Atma Jaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.25170/metris.v25i01.4651

Abstract

The sales report of SMEs at the Banyuwangi Festival is an indicator of the success of the festival. In the process of collecting the sales report, the Banyuwangi Tourism and Culture Office, as the current responsible party, still does it without an information system, making the management of the sales report of SMEs at the Banyuwangi Festival inefficient. Using the Rapid Application Diagram (RAD) method, the design of an ERP system in the form of a point of sale module based on the Odoo application at the Banyuwangi Tourism and Culture Office and the Banyuwangi Festival SMEs is carried out to obtain an efficient process of collecting the sales report of SMEs at the Banyuwangi Festival. The design using the RAD method is carried out to obtain results that are in line with user needs. The results of this research show that the designed ERP system can improve business process efficiency for institutions and efficient sales management for SMEs. The impact of this research is expected to improve data management accuracy, increase collaboration, and optimize sales of Banyuwangi Festival SME products.
Analysis of Innovation based on Technometric Model to Predict Technology Life Cycle in Indonesian SME Ganesha Putri, Debby Cintia; Handayani, Wahyu Sri; Sulistyawan, Vera N; Rumanti, Augustina Asih; Hadisurya, Vania
International Journal of Innovation in Enterprise System Vol. 1 No. 1 (2017): International Journal of Innovation in Enterprise System
Publisher : School of Industrial and System Engineering, Telkom University

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Forecasting technology is one way that can be used to predict product life cycle. Product life cycle is very important to know, especially by organizations, that are in small medium level, like SME. This research will be conducted in SME Surya Usaha Mandiri, Daerah Istimewa Yogyakarta.Forecasting product life cycle that has been done, will direct this research toward the stage of product development. Stages of development of the products are a necessary stage for an organization, especially in SME, to innovate the product. The purpose of this research is to propose the development of products, such as the stages of innovation that can be done in SME Surya Usaha Mandiri, forecasting conducted based on life cycle assessment of products and technology components using technometric model. The results of this research are proposed innovation based forecasting and product life cycle assessment in SME Surya Usaha Mandiri using technometric model. Keywords - product life cycle, innovation, technometric model, SME
Perancangan Konten E-Learning Untuk Mendukung Regenerasi Perajin Batik Lasem Di Kabupaten Rembang Faza, Hafiyyan; Rumanti, Augustina Asih; Septiningrum, Lutfia
eProceedings of Engineering Vol. 10 No. 2 (2023): April 2023
Publisher : eProceedings of Engineering

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Abstrak—Rembang merupakan tempat lahirnya batik lasem yang menjadi komoditas utama sejak awal abad ke-19. Berdasarkan data dari Badan Pusat Statistik, sektor industri mengalami penurunan dimana Sektor Industri yang menyerap tenaga kerja sebesar 12,07 persen pada Agustus 2019, turun menjadi 11,11 persen pada Agustus 2020.Tujuan penulisan ini adalah merancang konten e-learning guna mendukung regenerasi perajin batik Lasem di Kabupaten Rembang menggunakan Metode SECI dan ADDIE. Tahap pertama dari perancangan konten e-learning adalah analyze. Pada tahap ini dilakukan identifikasi proses pembautan Batik Lasem. Selanjutnya masuk ke tahapan design menggunakan Metode SECI. Metode tersebut bertujuan untuk mengkonveri knowledge dari perajin batik berupa proses pembuatan Batik Lasem. Knowledge tersebut nantinya akan dikonversi menjadi best practice dari tahapan pembuatan Batik Lasem yang akan digunakan sebagai course dari aplikasi e-learning yang dirancang. Selanjutnya masuk ke tahapan development, pada tahapan tersebut dilakukan perancangan aplikasi e-learning. Lalu dilanjut dengan tahap implementation, pada tahap ini dilakukan uji coba aplikasi e-learning. Lalu diakhiri dengan tahap evaluation. Pada tahap ini dilakukan evaluasi terhadap aplikasi yang sudah dirancang. Output Pada Tugas Akhir ini adalah best practice proses pembuatan batik lasem. Best practice tersebut dikemas dalam bentuk materi yang tersedia pada e-learning yang diharap dapat membantu kabupaten rembang dalam meregenerasi perajin Batik Lasem.Kata Kunci— E-Learning, SECI, ADDIE, regenerasi
Perancangan Perbaikan Sistem Existing Pada Aplikasi “Enjoy Rembang” Sebagai Media Promosi Pariwisata Kabupaten Rembang Dengan Metode Design Thinking Jaya, Mutiara Pramuti; Rumanti, Augustina Asih; Rizana, Afrin Fauzya
eProceedings of Engineering Vol. 10 No. 2 (2023): April 2023
Publisher : eProceedings of Engineering

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Abstrak— Aplikasi “Enjoy Rembang” merupakan aplikasi mobile yang berisi panduan untuk berwisata di Kabupaten Rembang. Berdasarkan data pengukuran kualitas aplikasi existing, yang didapatkan melalui proses wawancara dan kuesioner dengan model Webqual, narasumber dan responden menilai bahwa aplikasi existing belum memiliki ketepatan waktu dalam penyediaan informasi saat dibutuhkan oleh pengguna, kesesuaian fungsi dan kapabilitas dengan kebutuhan pengguna, tampilan yang menarik, kejelasan tata letak informasi pada layar, kemudahan untuk memperoleh informasi yang dibutuhkan oleh pengguna, pemberian informasi dengan tingkat detil yang lengkap, dan reputasi yang baik. Tugas akhir ini bertujuan untuk merancang perbaikan sistem existing pada aplikasi “Enjoy Rembang” untuk meningkatkan kualitasnya sebagai media promosi pariwisata Kabupaten Rembang dengan metode design thinking. Hasil perancangan dari tugas akhir ini yaitu berupa proses bisnis Standard Operating Procedure (SOP) untuk pemeliharaan sistem dan prototipe perbaikan aplikasi dengan menerapkan metode RESHOT. Hasil rancangan kemudian akan dievaluasi dengan wawancara evaluasi System Usability Scale (SUS). Manfaat hasil perancangan dari tugas akhir ini yaitu untuk meningkatkan UX dan user satisfaction aplikasi “Enjoy Rembang”. Hasil perancangan juga diharapkan dapat mengoptimalkan kinerja dari aplikasi tersebut agar dapat membantu percepatan promosi wisata di Kabupaten Rembang.Kata kunci— aplikasi, “enjoy rembang”, design thinking, perancangan perbaikan sistem, perancangan perbaikan aplikasi
Perancangan Sistem Informasi Produksi Pada Oshwin Washing Menggunakan Metode Waterfall Dan Seci Nirwana, Faturochman; Rumanti, Augustina Asih; Supratman, Nurdinintya Athari
eProceedings of Engineering Vol. 10 No. 2 (2023): April 2023
Publisher : eProceedings of Engineering

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Abstrak—Oshwin Washing merupakan perusahaan jasa yang bergerak di bidang washing pakaian, didirikan pada tahun 2005. Oshwin Washing melakukan pengelolaan pesanan dan kegiatan dokumentasi pesanan oleh karyawan administrasi dilakukan secara manual dengan mencatatkan pesanan pada buku catatan. Pemesanan washing beserta dengan spesifikasi jenis washing yang dikelola dicatatkan pada kartu produksi. Pada kartu produksi, informasi yang digunakan karyawan pada lantai produksi, berisikan data pemesanan dan jenis obat yang digunakan untuk proses washing, apabila penggunaan obat tidak sesuai menyebabkan data penggunaan obat dan stok obat yang tersedia tidak sama, menyebabkan Oshwin Washing harus memesan obat terlebih dahulu dan dapat menyebabkan keterlambatan produksi, perancangan sistem ini dilakukan menggunakan metode waterfall dan metode SECI, metode waterfall digunakan untuk pengembangan sistem informasi dengan model yang terdiri fase pengembangan, requirement analysis, perancangan, pengkodean, testing, dan maintenance. Perancangan sistem informasi produksi ini menggunakan sistem berbasis web dengan bahasa pemrograman PHP dan MySQL. Hasil dari tugas akhir ini adalah perancangan sistem informasi produksi yang dapat membantu proses rekapitulasi pemesanan serta menyimpan data produksi jasa washing pakaian, sehingga informasi dapat disimpan, diakses, di-update secara realtime. Namun untuk melakukan implementasi diperlukan infrastruktur yang terdiri dari hardware dan software untuk menunjang sistem, agar dapat berjalan dengan lancar sesuai fungsi nya.Kata Kunci— sistem informasi produksi, knowledge, seci, washing, waterfall
Pemetaan Potensi Wisata Budaya di Rembang Berbasis Geographic Information System (GIS) Dengan Metode Scrum Abdullah, Charisma Zaafira; Rumanti, Augustina Asih; Rizana, Afrin Fauzya
eProceedings of Engineering Vol. 10 No. 3 (2023): Juni 2023
Publisher : eProceedings of Engineering

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Abstrak-Rembang memiliki potensi wisata yang lebih unggul dari Kabupaten Kota Provinsi Jawa Tengah yang ada disekitarnya yaitu Blora dan Pati. Namun berdasarkan Draft Buku Pariwisata Jawa Tengah wisata budaya di Rembang tidak terlalu diminati wisatawan dan wisatawan yang mengunjungi rembang lebih sering megalami penurunan setiap tahunnya. Salah satu penyebabnya adalah masih banyak wisata yang belum terekspos dan dimanfaatkan oleh pemerintahan Rembang. Maka, diperlukan sebuah pemetaan potensi berbasis sistem informasi geografis yang dapat menciptakan potensi wisata budaya baru di Rembang. Dalam perancangan sistem informasi geografis metode yang digunakan adalah Scrum yang terdiri dari 6 langkah kerja. Metode Scrum dipilih karena sesuai dengan pengerjaan tugas akhir yang dikerjakan secara tim. Dalam perancangan sistem yang dibuat proses verifikasi sistem dilakukan dengan mengggunakan metode greybox testing. Sedangkan proses validasi dilakukan dengan menggunakan metode User Test Acceptance (UAT). Adapun output dari Tugas Akhir yang dihasilkan adalah sebuah sistem informasi geografis mengenai pemetaan potensi wisata budaya di Rembang. Adanya sistem informasi geografis sebagai usulan diharapkan dapat digunakan untuk mengetahui persebaran area wisata budaya yang ada di Rembang, dan mengetahui area potential juga prioritas berdasarkan nilai yang telah ditentukan. Sehingga sistem ini diharapkan dapat membantu DISPARBUD Rembang sebagai alat bantu pendukung keputusan dalam menentukan pembangunan pariwisata berkelanjutan.Kata Kunci-rembang, geographic information system, metode scrum, metode grey box, User Acceptance Test (UAT).