Claim Missing Document
Check
Articles

Pemilihan Kegiatan Pemberdayaan Masyarakat Pada Program Corporate Sosial Responsibility Arwan Chrysdeckie Suratmodjo; Iwan Vanany
Jurnal Ilmiah Teknik Industri Vol. 17, No. 1, Juni 2018
Publisher : Department of Industrial Engineering Universitas Muhammadiyah Surakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.23917/jiti.v17i1.4890

Abstract

Community development (Comdev) is company’s obligation and responsibility to the community. Advancing the community towards an independent one and preserving the environment through CSR also contribute towards building a corporate’s reputation. Proper is an award granted by the Ministry of Environment, while PROPER Emas (Gold Proper) is the highest-rank award with a significant impact on the company’s reputation. Community development programs are essential in achieving PROPER Emas. This research selects a community development (comdev) program suitable to the criteria in oil distribution company using the AHP Expert Choice method, so that the corporate obtains recommendations and a framework to be used for the comdev program. A superior program is necessity for the PROPER Emas judgement, and this research recommends community development activities to be featured as the superior program. This study concludes that the suggested top program to be carried out by fuel oil distribution companyis the eco-friendly waste bank as a first priority, and the river bank forest program as the second. This research expects to feed into the corporate’s CSR programs towards achieving gold proper.
Model Six Sigma Untuk Mengurangi Produk Cacat Karena Faktor Ketidakhalalan Firman Mega Pahlawan; Iwan Vanany
Jurnal Ilmiah Teknik Industri Vol. 18, No. 1, Juni 2019
Publisher : Department of Industrial Engineering Universitas Muhammadiyah Surakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.23917/jiti.v18i1.7504

Abstract

In recent years, the halal food issue is an interesting for researchers and practitionaires.  Halal food market was growing significantly and food industries are becoming more aware of halal food improvement and certification.  The food industries need to follow the rules of halal assurance system for the halal institution regulation.  The purpose of this paper is proposesix sigma model for product defect reduction in halal food.  The four steps are used to reduce halal product defect such as (1) Define, (2) Measure, (3) Analyze, and (4) Improve.  Several tools are used in proposed model such as brainstorming, pareto diagram, RCA whys and others.  The proposed six sigma model is applied in chicken slaughtering industry as case study in this research.  There are types of product defect due to non-halal factor, such as (1) chicken do not pass antemortem checks result, (2) chicken die before slaughtering, (3) the slaughter process is not done by cutting off 3 channels at once (blood vessels, trachea, and esophagus), (4) the meat produced is not suitable for consumption (not toyyib).  Based on processing stage, the biggest loss occurs at the meat processing stage, which is due to the quality of chicken meat are not toyyib.  Based on each component of costs, the biggest loss occurs in the component of raw material costs.
Strategic Analysis on Start-Up Business Using Objectives and Key Results Method in Rumah Kapas Holding Bassam Muhammad Drehem; Iwan Vanany
IPTEK Journal of Proceedings Series No 3 (2020): International Conference on Management of Technology, Innovation, and Project (MOTIP) 2
Publisher : Institut Teknologi Sepuluh Nopember

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.12962/j23546026.y2020i3.11209

Abstract

The Textile and Garment Industry is one of the industrial sectors in Indonesia which is a priority by the Ministry of Industry in the "Making Indonesia 4.0" program. This causes the higher demand for better product quality. By asking for quality demand it will become a hot segment for garment companies. Seeing this opportunity, Rumah Kapas as a company in the garment field needs to improve its strategy to meet new challenges and demands from the textile and garment industry. This research is going to be conducted by analysing internal and external data from the company. Resulting data will be processed using SWOT Analysis and Five Forces Analysis. Those will provide an output in a form of generic strategies by Porter and give strategic recommendation that will be translated to objectives and key result using Objectives and Key Result (OKR) method. Strategy analysis usage in this research aim the capability of Rumah Kapas to determine the company position and the availability of recommendation and evaluation for company to achieve its ideal condition.
Development of Supply Chain Risks Interrelationships Model using Interpretive Structural Modeling and Analytical Network Process Chatarina Dian Indrawati; Putu Dana Karningsih; Iwan Vanany
IPTEK Journal of Proceedings Series Vol 1, No 1 (2014): International Seminar on Applied Technology, Science, and Arts (APTECS) 2013
Publisher : Institut Teknologi Sepuluh Nopember

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.12962/j23546026.y2014i1.375

Abstract

Globalization and vast changing of business nature nowadays makes interdependence between organizations who shares the same supply network is becoming stronger.  Any risk that occurs in one point of a supply chain could affect to the whole network.  As a result, risk in supply chain is getting more complex and unpredictable. Since any kind of risk could potentially impede or even stop business activities of the whole supply chain therefore managing supply chain risk is essential. Moreover, to handle supply chain risk properly, the interrelationships between these risks should be identified. However, there is only few study which cover interrelationships between supply chain risks. This research is aiming to provide a proposed model of a supply chain interrelation risks based on case study in an petrochemical industry.   Interpretive Approach Structural Modeling is utilized to develop the relationships between risks while weight determination for risk relationship is conducted using Analytical Network Process.  The case study of this research identifies that there are 14 supply chain risks which are grouped as driver, dependent, autonomous and linkage. The weight of risk interrelations are then considered when quantify each risk.  Calculation of risk priority number is not only taking into account its own probability and consequence but also the probability and weight of affected risk.
Consumable Material Spare Part Management Control in Electricity Transmission System Widi Riskianto; Iwan Vanany; Niniet Indah Arvitrida
IPTEK Journal of Proceedings Series No 7 (2020): The 2nd International Conference on Global Development (ICODEV) 2020
Publisher : Institut Teknologi Sepuluh Nopember

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.12962/j23546026.y2020i7.9539

Abstract

Overstock spare part in the Electric Power Transmission System will affect the inefficiency in the asset management of the company. While the spare part stockouts in the company will disrupt the maintenance process of the electric transmission system, which then lead to power outages. Overstock spare parts are caused by several factors, such as forecasting errors in material requirements, intermittent requests, so it is difficult to determine the optimal order quantity. On the other hand, the unavailability of spare parts will affect the reliability of the electrical energy transmission system, which has the potential in causing a massive power outage. Monte Carlo simulations help to show the more concrete picture of the spare parts inventory condition using a periodic review (R, S) system approach. Divination of the combination of S and R parameters is very influential on the success of spare part control. Spare part classification is used for understanding the demand characteristics and the level of criticism. Moreover, the analysis of simulation results will show the information on supply fulfilment strategies to overcome the problems of either spare parts availability or spare parts overstock.
Application of Value Stream Mapping on Operating Project Business Process at Nickel Mining Industry Aristo Andryanto; Iwan Vanany
IPTEK Journal of Proceedings Series No 6 (2020): 6th International Seminar on Science and Technology 2020 (ISST 2020)
Publisher : Institut Teknologi Sepuluh Nopember

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.12962/j23546026.y2020i6.11113

Abstract

This study investigated the usage of manhours against project cost impact in the business process of capital and operating project in mining industry. The case study in this study is nickel mining company in Indonesia. The waste identification and elimination are used on the business process operations and capital project delivery system using lean thinking in project management and Analytical Hierarchy Process (AHP). The study results shows that in current business process state, 95% project expenditure in case study on 2019 was spent for capital project and 5% for project operations. This results of this study is quite different with the manhours spent each on operating and capital project. In 2019, both the Capital Project Management and Engineering Services department spent 70% of their manhours on Capital Project and 30% on Operating Project. It shows that in managing 5% of their project budget, the company’s case study had to spent 30% of their project team manhours. With the proposed business process, the company’s case study should be able to optimize their manhours usage proportionally to the project cost impact.
An Optimization Model for Container Capacity in New Sorong-Papua Port Iwan Vanany; Duha Awaluddin Kurniatullah; Edi Jadmiko; Dody Hartanto; zulfiyah Musfiroh
IPTEK Journal of Proceedings Series Vol 1, No 1 (2014): International Seminar on Applied Technology, Science, and Arts (APTECS) 2013
Publisher : Institut Teknologi Sepuluh Nopember

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.12962/j23546026.y2014i1.231

Abstract

The issue of the logistics system is an important issue for the state of Indonesia as an archipelago. Effort to distribute commodities to destinations across the island and attempted export of transport costs become cheaper and faster is a thing to be achieved by all parties including the government of Indonesia. Logistical problems in eastern Indonesia are more complex than the western part of Indonesia. For example, the cost of transport from eastern Indonesia is more expensive than the western part of Indonesia. Therefore, PELINDO II as the company seeks to make the country a new facility in the form of New-port that will replace the port of Sorong Sorong. New-Sorong port will be the largest port in Eastern Indonesia. This paper makes an optimization model with the goal of optimizing shipping container and determines how much capacity should be made to the port of New-Sorong.
Planning & Controlling Tourism Landscape Design Project using Critical Chain Project Management (CCPM) Schedulling Alivia Rosy Walidonna; Iwan Vanany
IPTEK Journal of Proceedings Series No 3 (2020): International Conference on Management of Technology, Innovation, and Project (MOTIP) 2
Publisher : Institut Teknologi Sepuluh Nopember

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.12962/j23546026.y2020i3.11205

Abstract

Project Management must meet the performance criteria of timeliness and budget control agreed between the project owner, contractor and supervisor. However, the level of uncertainty in the project implementation process is very high and causes delays and over budgeting. The Village Nongkojajar is a Proposed Integrated Agropark Project as a result of the revitalization of the non-productive land of the Horticultural Seed Farm owned by the Government of East Java Province. The Landscape Architecture Project has a Creative Value Chain which is divided into Creation - Implementation - Management. Therefore scheduling and controlling the project becomes important in order to to estimate working time and the project remains in accordance with the predetermined project timeline and whenever corrective action is needed. The relevance of Project Management in this research is that with high project problems, require a good planning process. The Project can be completed quickly than the specified time and more cost effective. Critical Chain Project Management (CCPM) is one method for completing and preparing projects that focus on the resource requirements for implementing projects by adding project buffers, feeding buffers and resource buffers. By analyzing using CCPM, researchers can look for optimization and control in implementing project scheduling.
The Proposed Model of Suppliers Performance Measurement for Vendor Held Stock (VHS) in Mining Industry Sri Wahyuni; Suparno Suparno; Iwan Vanany
IPTEK Journal of Proceedings Series No 6 (2020): 6th International Seminar on Science and Technology 2020 (ISST 2020)
Publisher : Institut Teknologi Sepuluh Nopember

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.12962/j23546026.y2020i6.11129

Abstract

Vendor Held Stock (VHS) is the storage and management a system for spare parts and other material must prepared and managed with the suppliers in case study. The case study in this research is in nickel mining company in Indonesia. The company’s case study requires all suppliers should provide the spare parts and other materials in their warehouses. The purpose of this study is to develop VHS supplier’s performance measurement system in case study. The key performance indicators (KPI’s) in VHS’s supplier performance measurement system are determined to ensure the buyer demand can be fulfilled in a timely, systematic and well organized with the correct quantity and maintained quality. The method used in measuring supplier performance is a combination of the Analytical Hierarchy Process (AHP), The Objective Matrix (OMAX) and Fishbone Diagram Methods. The results of this research are expected to obtain measurement models and find the root cause and solutions to the current problem to improve overall supplier performance.
Performance Improvement for Port Loading and Unloading Process with Process Mining Amanda Dewi Paramita; Iwan Vanany
IPTEK Journal of Proceedings Series No 5 (2019): The 1st International Conference on Business and Management of Technology (IConBMT)
Publisher : Institut Teknologi Sepuluh Nopember

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (1005.185 KB) | DOI: 10.12962/j23546026.y2019i5.6364

Abstract

Port is one of the important things in trade and logistics. The major influence factor of port productivity is the cycle time for loading and unloading. The container activity in port logistics consists of several activities, such as discharging, loading, receiving, delivery, gate-in, and gate-out, among others. These activities using various equipment including container cranes, Rubber Tyred Gantry (RTG), trucks, and other related machinery. The availability of equipment is one of the factors the influence delays in container activities, which can negatively affect productivity. The productivity of the port will affect to Key Performance Indicator (KPI) of the port. The purpose of this study is to analyze the flow of containers that used process mining. Moreover, it provides a recommendation to increase the productivity at Terminal Nilam Multipurpose Port of Tanjung Perak. Process mining method includes many of other analysis, that is discovery, prediction and real-time, bottlenecks and deviation analysis. Disco program used to analyze container activity, besides this, the disco program also use to determine bottleneck mapping that effect to port productivity. The result show delivery and receiving are the cause of the bottleneck. Delivery cancel is known as an activity that inappropriate with the ideal process and indicates as an error in the flow of container activities. The improvement scenario carried out from the results of the analysis obtained is to minimize the occurrence of cancel loading delivery, to obtain a time reduction of ± 11.6 hours. This will affect the productivity of container activities
Co-Authors Adi Soeprijanto Ahmad Rusdiansyah AHMADI Ahmadi Ahmadi Alivia Rosy Walidonna Amanda Dewi Paramita Andri, Kuntoro Boga Anindita Etri Wulandari Annisa Eviondra Antasena Thabit Abisha Aristo Andryanto Arvitrida, Niniet Indah Arwan Chrysdeckie Suratmodjo Astawa, Nyoman Awaluddin Bin Mohamed Shaharoun Awaluddin Bin Mohamed Shaharoun Bassam Muhammad Drehem Berto Mulia Wibawa Budisantoso Wirjodirdjo Chatarina Dian Indrawati Desy Emilasari Desy Emilasari Dian Tanukhidah Dian Tanukhidah Dian Wahyu Adriyanti Dimas Prasetyo Dody Hartanto Duha Awaluddin Kurniatullah Edi Jadmiko Enggar, Yohannes Fakhri Anggara Firman Mega Pahlawan Firman Mega Pahlawan, Firman Mega Hary Nurdi Hendrik Vicarlo Saragih Hidayati, Muthia Putri Husodo, Mohammad Bimo I Nyoman Pujawan Iskandar Iskandar Jeremi, Nofariza Aulia Johan Krisnanto Runtuk Koerniawan, Heri Krisdiono, Eko Lilik Fatmawati, Lilik Meilanitasari, Prita Meuthia, Meuthia Moch. Khoirul Anwar Mochamad Nizar Palefi Ma’ady Mukhlis Mukhlis Niken Anggraini Savitri Nilda Tri Putri Niniek Fajar Puspita, Niniek Fajar Nisa Isrofi Nur Wakhid Habibullah Okol Sri Suharyo Paramaditya Arismawati Pardede, Sri Rahayu Putera, Rizki Revianto Putu Dana Karningsih Rafsanjani , Hasemy Rafsanjani, Hasemy Rahmahdian S, Rini Rien Sofia Devi Riyanto, Anisah Rizki Revianto Putera Ronny Mardiyanto, Ronny Saputra, Ikhsan Rapi Satria*, Bangkit Nata Savitri, Niken Anggraini Sholichah, Wildatus Sri Wahyuni Suparno Suparno Suparno Suparno Supartono - Suratmodjo, Arwan Chrysdeckie Tola, Alimuddin Trihanyndio Rendy S, Trihanyndio Rendy Widi Riskianto Winarsih, Wiwik Heny Zakuan, Norhayati zulfiyah Musfiroh