Claim Missing Document
Check
Articles

Found 8 Documents
Search
Journal : Mining Science and Technology Journal

Evaluasi Penggunaan Bahan Peledak Pada Penambangan Batu Gamping Untuk Memenuhi Target Produksi Peledakan Pada PT. Diamond Alfa Propertindo Dodi, La; Rembah, Rina; Hasriyanti, Hasriyanti
Mining Science And Technology Journal Vol 2 No 1 (2023): Mining Science and Technology Journal
Publisher : Program Studi Teknik Pertambangan, Fakultas Teknik, Universitas Sulawesi Tenggara

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (278.747 KB) | DOI: 10.54297/minetech-journal.v2i1.446

Abstract

Diamond alfa propertindo merupakan salah satu perusahaan yang bergerak dibidang pertambangan batu gamping, didalam kegiatanya penambangannya menggunakan bahan peledak ANFO. dengan luas wilayah 4.509 ha dimana lokasi penelitan ini terletak pada blok A2Tujuan dari penelitian ini untuk mengetahui geometri peledakan produksi peledakan berupa jumlah penggunaan bahan peledak yang digunakan. Berdasarkan hasil penelitian yang dilakukan diketahui bahwa rata-rata geometri peledakan yaitu Burden (B) 2 meter, Spasi (S)2,37 meter, kedalaman (H) 4,76 meter, panjang colum isian (PC) 4 meter, dan tinggi jenjang 7,38 meter. Dengan rata-rata produktivitas peledakan yang terjadi di lapangan sebesar 4.146 bcm/hari kerja dan jumlah penggunaan bahan peledak dengan rata-rata sebesar 877 kg, dengan rata-rata nilai blasting rasio 0,21 kg/bcm artinya perbandinagan antara jumlah batuan yang terbongkar dengan jumlah bahan peledak yang digunakan menghasilkan rata-rata ukuran fragmentasi 38,50 cm3, dimana hasil ukuran fragmentasi dilapangan sesuai dengan standar ukuran maksimum crusher yaitu 50 cm3. Penentuan geometri peledakan sangat berpengaruh dalam tercapainya suatu produktivitas peledakan, dimana geometri peledakan menentukan banyaknya bahan peledak yang digunakan terhadap batuan yang akan diledakan, sementara blasting rasio ditentukan dari hasil perbandingan penggunaan bahan peledak dengan volume batuan yang dibongkar.
Pengaruh Koefisien Seismic Load Terhadap Faktor Keamanan Lereng Pada Penambangan Nikel Di Kecamatan Palangga Selatan Kabupaten Konawe Selatan Dzakir, La Ode; Rembah, Rina; Salu, Sahrul Poalahi; Kadar, Muhammad Ilham
Mining Science And Technology Journal Vol 2 No 1 (2023): Mining Science and Technology Journal
Publisher : Program Studi Teknik Pertambangan, Fakultas Teknik, Universitas Sulawesi Tenggara

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (826.243 KB) | DOI: 10.54297/minetech-journal.v2i1.448

Abstract

Kestabilan lereng dipengaruhi oleh faktor alam seperti kondisi hirdrologi dan hidrogeologi, kondisi struktur geologi dan beban dinamis yang disebabkan oleh getaran alat berat maupun getaran akibat gempa bumi. Penelitian ini dilakukan untuk mengetahui pengaruh koefisien seismik load terhadap faktor keamanan lereng. Penelitian diawali dengan melakukan pengujian laboratorium terhadap sampel tanah untuk mengetahui sifat fisik dan sifat mekanik tanah. Setelah memperoleh data sifat fisik dan mekanik tanah, selanjutnya dilakukan analisis kestabilan lereng menggunakan metode limit equilibrium dengan bantuan software slide. Berdasarkan hasil penelitian yang dilakukan diketahui bahwa pengaruh koefisien seismic load terhadap faktor keamanan lereng sangat signifikan. Dari hasil penelitian ini diperoleh kesimpulan bahwa semakin besar beban seismik yang bekerja pada lereng maka semakin rendah nilai faktor keamanan lerengnya (kondisi lereng semakin tidak stabil).
Analisis Perbandingan Metode Inverse Distance Weight (IDW) dan Kriging pada Estimasi Cadangan Nikel Larerit di PT. Karyatama Konawe Utara Desa Tambakua Kecamatan Langgikima Kabupaten Konawe Utara Hamsir, La Ode; Rembah, Rina; Arif, Arif
Mining Science And Technology Journal Vol 2 No 3 (2023): Mining Science and Technology Journal
Publisher : Program Studi Teknik Pertambangan, Fakultas Teknik, Universitas Sulawesi Tenggara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.54297/minetech-journal.v2i3.490

Abstract

PT. Karyatama konawe utara merupakan salah satu perusahaan pemilik IUP untuk komoditas mineral logam nikel yang berada di kabupaten konawe utara, provinsi sulawesi tenggara. IUP PT. Karyatama konawe utara memiliki total luasan IUP sebesar 3.119 ha yang terbentang dari kecanatan Asera hingga kecanatan Langgikima, kabupaten konawe utara. Tujuan dari penelitian ini adalah untuk mengetahui estimasi cadangan di blok A, berapa volume dan tonase endapan nikel laterit dan berapa selisih cadangan nikel laterit dengan menggunakan metode Inverse Distance Weight dan metode kriging. Data yang dibutuhkan dalam penelitian ini adalah data assay, collar, geology dan survey menggunakan Software Surpac 6.6. Dari data yang diperoleh yaitu estimasi cadangan dengan menggunakan metode Inverse Distance Weight adalah sebesar 371.280 ton dan volume 232.051 m3 dengan kadar 1,5% - 1,7% atau low grade ore 178.660 ton, kadar 1,7%-1,9% atau medium grade ore 143.670 ton, kadar >1,9% atau high grade ore 48.950 ton. Hasil estimasi cadangan menggunakan metode Kriging sebesar 685.425 ton dan volume 428.392 m3, dengan kadar 1,5%- 1,7% atau low grade ore 234.538 ton, kadar 1,7%-1,9% atau medium grade ore 110.394 ton dan kadar >1,9% atau high grade ore 83.460 ton. Berdasarkan hasil Estimasi cadangan terdapat perbedaan selisih cadangan antara metode IDW dan Kriging yaitu, untuk cadangan kadar 1,5% - 1,7% atau low grade ore sebesar 196.600 ton, 1,7%-1,9% atau medium grade ore sebesar 32.960 ton, dan kadar >1,9% atau high grade ore sebesar 84.585 ton.
Evaluasi Perencanaan dan Realisasi Produksi Nikel pada Pit Beryl di PT. Manunggal Sarana Surya Pratama Candra, Wahyu; Rembah, Rina; Nurfasiha, Nurfasiha
Mining Science And Technology Journal Vol 2 No 3 (2023): Mining Science and Technology Journal
Publisher : Program Studi Teknik Pertambangan, Fakultas Teknik, Universitas Sulawesi Tenggara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.54297/minetech-journal.v2i3.546

Abstract

Perencanaan tambang dilakukan untuk menjamin operasi penambangan yang akan dilakukan terkoordinasi dan sesuai dengan target yang direncanakan. Namun, pada realisasinya seringkali ditemukan adanya ketidaksesuaian antara perencanaan tambang dan realisasi di lapangan. Pada penelitian kali ini pokok permasalahan yang diangkat yaitu, apa saja bentuk ketidaksesuaian antara perencanaan dan realiasi yang terjadi dilapangan, serta mengetahui faktor faktor apa saja yang menyebabkan sering tidak tercapainya perencanaan dan realisasi. Dengan itu penulis dapat memberikan solusi dan saran berdasarkan hasil evaluasi yang telah dilakukan untuk meningkatkan ketercapaian rencan dan realisasi yang terjadi dilapangan Berdasarkan evaluasi yang dilakukan didapatkan adanya ketidak sesuaian perencaan dan realisasi yang terjadi dilapangan, yaitu dengan presentase ketercapaian produksi pada bulan januari 19%. Pada bulan februari 42%, dan pada bulan maret 39%. Adapun faktor yang menjadi penyebabnya yaitu, Ketebalan Overburde, Slippery, Kemacetan, Unit Support, Efesiensi Kerja, dan skill operator. berdasarkan faktor faktor tersebut Upaya yang dilakukan peneliti untuk meningkatkan target produksi yaitu dengan memperbaiki waktu kerja
Rancangan Teknis Penambangan dan Penjadwalan Produksi Jangka Pendek (Short Term Scheduling) pada Penambangan Bijih Nikel PT. Gerbang Multi Sejahtera Aprilia, Aprilia; Rembah, Rina; Nurfasiha, Nurfasiha
Mining Science And Technology Journal Vol 3 No 1 (2024): Mining Science and Technology Journal
Publisher : Program Studi Teknik Pertambangan, Fakultas Teknik, Universitas Sulawesi Tenggara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.54297/minetech-journal.v3i1.550

Abstract

Block U8 is one of the front of PT. Gerbang Multi Sejahtera which is still virgin condition with an area 14,5 ha. The aim of this research is to estimate reserves, design mining techniques, and make production cheduling based on the design result. The data needed in this research is drill logs. Data from the result of estimating laterite nikel reserve using the Kriging method using Surpac 6.5.1 software shows that the one tonnage is 1.063.919 tons with an average Ni content of 1,80%. The tier geometry used is in accordance with the company’s geotechnical records, namely a tier height of 5 m, a tier depth of 2 m and a single tier slope of 50o. The width of the haul road on a straight road is 12,63 m dan the width of the haul road on bends is 13,97 m, the road grade used is 12%. The planned mining method is open pit which is divided into 3 sequences and consists of 21 ming pushback with a minr life 21 month. The need for Excavator Doosan DX 200A must-dig tools for the progress of the mine from the 1st moth to the 21st month are constant. 1 unit OB digging tool, 1 unit of Ore digging tool, and 1 unit of mush material Ore. The mean of transportation killed were 3 unit in Pit 1 and Pit 2, while in Pit 3 it was 4 units.
Evaluasi Perhitungan Biaya Operasional Penambangan pada PT Putra Mekongga Sejahtera Kecamatan Pomalaa Kabupaten Kolaka Provinsi Sulawesi Tenggara Mulimin, Muslimin; Rembah, Rina; Hasriyanti, Hasriyanti
Mining Science And Technology Journal Vol 3 No 1 (2024): Mining Science and Technology Journal
Publisher : Program Studi Teknik Pertambangan, Fakultas Teknik, Universitas Sulawesi Tenggara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.54297/minetech-journal.v3i1.568

Abstract

ABSTRAKEVALUASI PERHITUNGAN BIAYA OPERASIONAL PENAMBANGAN PADA PT. PUTRA MEKONGGA SEJAHTERA KECAMATAN POMALAA KABUPATEN KOLAKA PROVINSI SULAWESI TENGGARA OLEH:MUSLIMIN170920197(Program Studi Teknik Pertambangan)Wilayah Izin Usaha Pertambangan (WIUP) PT. Putra Mekongga Sejahtera berada pada status Operasi Produksi, sesuai Surat Keputusan Bupati Kolaka Nomor: 155 tahun 2010 dengan luas 388 ha, berlaku selama 10 tahun. Kegiatan penambangan yang dilakukan oleh PT. Putra Mekongga Sejahtera terdiri dari tahapan sebagai berikut: pembukaan lahan, penambangan, pengangkutan bijih nikel dari front tambang sampai stock yard pelabuhan serta kegiatan pengapalan (eksport bijih). Sebelum melaksanakan kegiatan penambangan, perlu dibuat suatu rencana anggaran biaya penambangan. Tujuannya agar dapat memberikan gambaran biaya yang akan dikeluarkan oleh perusahaan untuk kegiatan penambangan. Salah satu biaya kegiatan penambangan yang harus direncanakan adalah biaya operasional penambangan.Berdasarkan pengamatan yang dilakukan di PT. Putra Mekongga Sejahtera maka di dapatkan hasil produktivitas alat Stripping OB yaitu : Untuk melakukan Stripping OB dengan menguunakan alat excavator Komatsu PC 200 dapat diperoleh yaitu : 22.272,48 ton/bulan dan untuk melakukan Ore Getting dengan mengunakan alat excavator Komatsu PC 200 dapat diperoleh yaitu : 18.809,28 ton/bulan Untuk pengamatan yang dilakukan di PT. Putra Mekongga Sejahtera maka, didapatkan hasil biaya operasional stripping OB yaitu, untuk alat Excavator Komatsu menggunakan 1 unit Alat sebesar Rp. 74.874.800/bulan Dan untuk biaya operasional ore getting yaitu, untuk alat Excavator Komatsu menggunakan 1 unit Alat sebesar Rp. 72.427.000/bulanDapat kita simpulkan bahawa produksi pada bulan Juli 2023 melebihi target produksinya. Sedangkan produksi Ore Getting pada bulan agustus 2023 tidak melebihi target produksi setiap bulannyaKata Kunci: Biaya Produksi Dan Biaya Operasional, Cycle Time, Produktivitas
Estimasi Cadangan dan Desain Tambang Nikel Laterit Menggunakan Software Surpac Pada PT. Hikari Jeindo Kabupaten Konawe Utara Sulawesi Tenggara Asliadi, Amril; Rembah, Rina; Nurfasiha, Nurfasiha
Mining Science And Technology Journal Vol 3 No 1 (2024): Mining Science and Technology Journal
Publisher : Program Studi Teknik Pertambangan, Fakultas Teknik, Universitas Sulawesi Tenggara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.54297/minetech-journal.v3i1.569

Abstract

Hikari Jeindo is a private company engaged in nickel mining with its head office in the city of Kendari, Southeast Sulawesi and a mining location in the Langgikima sub-district. North Konawe Regency. This research was carried out in block 4 with a block area of ​​48 hectares. For the IUP area of ​​PT. Hikari Jeindo has an IUP area of ​​177.70 Ha. In this research, the problem is how to design a laterite nickel deposit pit in the research area using the Inverse Distance Weight (IDW) method and what the volume and tonnage of reserves should be. The aim of this research is to create a pit design for laterite nickel deposits in the research area and to estimate the volume and tonnage of reserves in the research area The research results obtained during the final assignment research at PT. Hikari Jeindo in block 4 where a pit design is carried out which functions to limit the mining block that will be carried out, with a pit opening area of ​​48 Ha. Where the height of the ladder is 5 m, the width of the ladder is 2.5 m and the slope of the ladder is 45%. Estimations were carried out with the help of Surpac 6.3 software by using the method and what was obtained was a volume of 258,593 m3 with a tonnage of 387,890 m3/ton with an average Ni content of 1.82% and Fe 11.18%.
Studi Teknis Kegiatan Pengeboran Nikel Laterit pada PT Rista Anugerah Resources di Kecamatan Langgikima, Kabupaten Konawe Utara, Provinsi Sulawesi Tenggara Rizkal, Rizkal; Kumalasari, Rizki; Rembah, Rina
Mining Science And Technology Journal Vol 4 No 1 (2025): Mining Science and Technology Journal
Publisher : Program Studi Teknik Pertambangan, Fakultas Teknik, Universitas Sulawesi Tenggara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.54297/minetech-journal.v4i1.933

Abstract

Provinsi Sulawesi Tenggara memiliki sumber daya alam yang melimpah, salah satunya adalah bijih nikel. Pembentukan nikel laterit dimulai dengan proses pelapukan batuan ultrabasa, khususnya batuan harzburgit. Dalam Penelitian ini berfokus pada tahapan pengeboran eksplorasi nikel laterit di PT. Rista Anugerah Resources, yang terletak di Kabupaten Konawe Utara, Sulawesi Tenggara. Tujuan dari penelitian ini adalah untuk memahami tahapan pengeboran, kecepatan, efektivitas dan produktivitas yang dicapai selama proses kegiatan eksplorasi pengeboran. Metodologi yang digunakan adalah kualitatif dan kuantitatif, yang melibatkan observasi dan pengumpulan data dari lima titik pengeboran (G33013, G33014, G33015, G33113, dan G33114) serta melakukan analisis hasil perhitungan produktivitas pengeboran. Data yang dikumpulkan meliputi waktu pengeboran, kedalaman pengeboran dan waktu standby. Proses pengeboran melibatkan beberapa tahapan teknis yang meliputi; penentuan titik pengeboran, pemindahan peralatan, pengeboran, penempatan core dalam core box, deskripsi sampel, pemindahan sampel ke kantong, dan pemasangan patok. Hasil penelitian dari 5 titik bor menunjukkan kecepatan pengeboran rata-rata 3,630 m/jam, efektivitas 69,40%, dan produktivitas 2,481 m/jam di seluruh titik pengeboran. Temuan tersebut menyoroti dampak kondisi tanah dan keterampilan operator terhadap kinerja pengeboran, dengan variasi kecepatan dan efektivitas yang diamati di antara lokasi pengeboran yang berbeda.
Co-Authors Abd Gani Baeda Abdul Hamid S. Abdul Salam Munir Al Tafakur La Ode Anis Ribcalia Septiana Aprilia Aprilia, Aprilia Arif Arif Arif Arif Arif Arif Arman Hidayat Arya Dirgantara Asliadi, Amril Bagus Eko Prasetyo Besse Putrilia Candra, Wahyu Carla Sabandar Dirgantara, Arya Dodi, La Dzakir, Laode Eko Bambang Murdiansyah Evodius Nasus Fathur Rahman Rustan H, Hasriyanti Haerul Purnama Hamsir, La Ode Hasriyanti Hasriyanti Hasriyanti Ica Aprilia Seleng Irabiah Isram Yano Yatjong Isramyano Yatjong Jayanti Yusmah Sari Jayawarsa, A.A. Ketut Kadar, Muhammad Ilham Kamaruddin, Harni Sartika Khafidzah Yusuf Kumalasari, Rizki Kumalasari, Rizky La Ode Dzakir Mansyur Mansyur Mansyur Mansyur Masgode , Muhammad Buttomi Masgode, Muhammad Buttomi Megawati Megawati Muh Syahruddin Muh. Ansar Azali Muhamad Jalil Baari Muhammad Rayzhal Faturahman Muhdar Mulimin, Muslimin Mursalim Ninoy La Ola N, Nurfasiha Noorhasanah Zainuddin Novianti, Yuniar Siska Nun Ainun Arap Nur Afifa Nurfasiha Nurfasiha Nurfasiha, Nurfasiha Nurliana Nurliana Nursyafika, Nursyafika Ode Dzakir, La Poalahi Salu, Sahrul Prasetyo, Bagus Eko Puspaningtyas, Retno Renaldi, Ahmad Retno Puspaningtyas Retno Wahyuningrum Rezkiya Nur Insani Rina Hardianti Pratiwi Rizkal, Rizkal Rizki Kumalasari S, Suwarto Sahrul Sahrul Salu, Sahrul Poalahi Sehan, Sahara Sri Gita Handayani Suharsono Bantun Susianti Susianti Suwarto Sunandar Suwarto Suwarto Suwarto Suwarto Syahrul Syahrul Syahrul Syahrul Syahrul Tulak, Grace Tedy Usriadi Usriadi Wahyuni Hakim Yatjong, Isramyano Yayang Rahmadani Zakina, Besse Ririn Zulfahmi Zulfahmi