Claim Missing Document
Check
Articles

Pemanfaatan Media Sosial Instagram dalam Personal Branding dan Pengembangan Karier Gen Z: (Studi Kasus Akun @meisyasallwa) Thresia Sungkono; Decky Cipta Indrashwara
Al-Zayn: Jurnal Ilmu Sosial, Hukum & Politik Vol 4 No 1 (2026): 2026
Publisher : Yayasan pendidikan dzurriyatul Quran

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.61104/alz.v4i1.3362

Abstract

Penelitian ini bertujuan untuk menganalisis bagaimana Meisya Sallwa memanfaatkan media sosial Instagram dalam membangun personal branding dan mendukung pengembangan kariernya sebagai representasi GenZ. Penelitian ini menggunakan pendekatan kualitatif dengan metode studi kasus deskriptif. Data dikumpulkan melalui wawancara mendalam terhadap enam informan yang terdiri atas lima pengikut akun @meisyasallwa sebagai partisipan utama dan satu praktisi komunikasi sebagai narasumber ahli yang memberikan penilaian profesional serta perspektif akademik terhadap kredibilitas dan kesan awal (first impression) personal branding Meisya Sallwa. Data tambahan diperoleh melalui observasi konten dan dokumentasi akun Instagram. Hasil penelitian menunjukkan bahwa Meisya Sallwa secara konsisten memanfaatkan fitur-fitur Instagram seperti feeds, reels, stories, dan channel sebagai inovasi komunikasi yang efektif untuk memperkuat citra diri. Berdasarkan teori Difusi Inovasi Rogers, Meisya menunjukkan karakter early adopter yang adaptif terhadap perkembangan platform. Penerapan 8 Laws of Personal Branding Montoya tercermin pada Hukum Spesialisasi, Hukum Diferensiasi, Hukum Visibilitas, dan Hukum Nama Baik, yang membangun citra profesional, kredibel, serta inspiratif di mata audiens. Strategi personal branding yang kuat tersebut turut membuka peluang kolaborasi dengan berbagai merek dan memperkuat reputasi kariernya. Penelitian ini menegaskan bahwa personal branding yang konsisten, positif, dan autentik di media sosial berperan penting dalam pengembangan karier Gen Z.
Sosialisasi pengelolaan sampah sebagai upaya peningkatan peran masyarakat di desa Sukawati Tapa, I Gede Fery Surya; Putra, I Ketut Anzas Dwi Anggara; Kumara, I Nyoman Indra; Indrashwara, Decky Cipta; Mahaswari, Ida Ayu Mirah
SELAPARANG: Jurnal Pengabdian Masyarakat Berkemajuan Vol 8, No 3 (2024): September
Publisher : Universitas Muhammadiyah Mataram

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31764/jpmb.v8i3.26140

Abstract

Abstrak Program Sosialisasi Pengelolaan Sampah Sebagai Upaya Peningkatan Peran Masyarakat di Desa Sukawati bertujuan untuk memperbaiki pengelolaan sampah di desa tersebut melalui pendekatan edukasi dan aksi lingkungan. Desa Sukawati, yang dikenal dengan potensi seni dan budayanya, menghadapi tantangan serius terkait pengelolaan sampah akibat kurangnya kesadaran dan pengetahuan masyarakat. Metode pelaksanaan yang digunakan yaitu, melibatkan tiga tahap utama. Pertama, tahap sosialisasi dan edukasi akan dilakukan melalui seminar dan lokakarya. Selanjutnya, tahap implementasi aksi lingkungan akan mencakup kegiatan gotong royong membersihkan lingkungan. Terakhir, evaluasi dan keberlanjutan program akan dilakukan dengan survei dan observasi untuk menilai dampak program serta pembentukan tim pengelola lingkungan desa yang akan mengawasi pelaksanaan dan memastikan program berjalan berkelanjutan. Melalui tahap sosialisasi dan edukasi, masyarakat menunjukkan peningkatan pemahaman tentang pentingnya pemilahan sampah dan cara melakukannya. Implementasi aksi lingkungan, termasuk gotong royong, lomba kebersihan, dan pembentukan bank sampah, memperlihatkan partisipasi aktif warga dalam pengelolaan sampah, yang berdampak positif pada penurunan volume sampah yang dibuang ke TPA dan peningkatan daur ulang. Kata kunci: sosialisasi; pengelolaan sampah; desa sukawati Abstract Program Sosialisasi Pengelolaan Sampah Sebagai Upaya Peningkatan Peran Masyarakat di Desa Sukawati bertujuan untuk memperbaiki pengelolaan sampah di desa tersebut melalui pendekatan edukasi dan aksi lingkungan. Desa Sukawati, yang dikenal dengan potensi seni dan budayanya, menghadapi tantangan serius terkait pengelolaan sampah karena kurangnya kesadaran dan pengetahuan masyarakat. Metode pelaksanaannya yaitu melibatkan tiga tahap utama. Pertama, tahap sosialisasi dan edukasi akan dilakukan melalui seminar dan lokakarya. Selanjutnya tahap implementasi aksi lingkungan akan mencakup kegiatan gotong royong membersihkan lingkungan. Terakhir, evaluasi dan penghentian program akan dilakukan dengan survei dan observasi untuk menilai dampak program serta pembentukan tim pengelola lingkungan desa yang akan mengawasi pelaksanaan dan memastikan program berjalan berkelanjutan. Melalui tahap sosialisasi dan edukasi, masyarakat menunjukkan peningkatan pemahaman tentang pentingnya pemilahan sampah dan cara melakukannya. Implementasi aksi lingkungan, termasuk gotong royong, lomba kebersihan, dan pembentukan bank sampah, menampilkan partisipasi aktif warga dalam pengelolaan sampah, yang berdampak positif pada penurunan volume sampah yang dibuang ke TPA dan peningkatan daur ulang. Keywords: socialization; waste management; sukawati village
Analysis of labor productivity in the installation of walls with lightweight bricks in the construction project of Sudamala Resort Ubud Krisnantara, Pande Made Agus; Indrashwara, Decky Cipta; Ariana, I Komang Agus; Nuraga, I Ketut
Priviet Social Sciences Journal Vol. 6 No. 2 (2026): February 2026
Publisher : Privietlab

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.55942/pssj.v6i2.1372

Abstract

Labor productivity is an important indicator for controlling time, cost, and quality in construction projects. The installation of lightweight brick walls requires a high level of efficiency; however, in practice, there is often a discrepancy between the actual productivity in the field and applicable standards. This study aims to analyze labor productivity in lightweight brick wall installation work and compare it with the standards set out in Regulation of the Minister of Public Works and Public Housing (Permen PUPR) Number 01 of 2022. The study was conducted on the Sudamala Resort Ubud construction project using direct observation and a work sampling approach. Observations were made for 14 working days during normal working hours to obtain data on the number of workers, effective working time, and volume of work produced. The data were analyzed to determine the productivity value and coefficient of workers, which consisted of foremen, master craftsmen, craftsmen, and laborers. The results of the study show that the average productivity of workers in the field is 18.175 m²/day for foremen, 19.123 m²/day for master craftsmen, and 18.546 m²/day for craftsmen and workers, with productivity coefficients of 0.055, 0.041, and 0.239, respectively. Compared to the standard of Permen PUPR 01 of 2022, there are differences in productivity values and coefficients in each labor category. These differences are influenced by the field conditions, workforce composition, and work implementation methods. 
Analysis of the application of value engineering in the building construction project of State Elementary School 1 Padang Sambian Matung, Ronaldi; Kumara, I Nyoman Indra; Indrashwara, Decky Cipta; Wedagama, Dewa Ayu Trisna Adhiswari
Priviet Social Sciences Journal Vol. 6 No. 3 (2026): March 2026
Publisher : Privietlab

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.55942/pssj.v6i3.1258

Abstract

Cost efficiency is an important aspect of project planning. One common approach to increasing cost efficiency is value engineering. This study applies Value Engineering to the Padang Sambian 1 Public Elementary School Building Construction Project with a total planned budget of IDR. 10,019,488,000.00. The analysis was conducted using the Dell'Isola method, which consists of four stages: information, creative, analytical, and recommendation. Based on the results of the study, the items carried out by Value Engineering include concrete work items on floors 1, 2, 3 and the roof, wooden plank truss work and roof tiles (roof work), door window hanging and locking work on floors 1, 2, and 3, masonry and plastering work (wall work) on floors 1, 2, and 3, paving block installation, ceramic floor and wall installation on floors 1, 2, and 3, and ceiling work on floor 3. The cost efficiency obtained using the Dell’Isola theory value engineering method is IDR. 224,566,091.39 or 2.24% of the total project cost with details of savings of IDR. 69,226,207.23 on concrete work on floors 1, 2, 3, and roof, IDR. 58,015,626.87 on truss work, wooden planks and roof tiles (roof work), IDR. 6,890,888.88 on door and window hanging and locking work on floors 1, 2, and 3, IDR. 1,160,097.63 on masonry and plastering work (wall work) on floors 1, 2, and 3, IDR. 48,561,507.2 on paving block masonry, IDR. 18,528,260.2 on ceramic floor and wall masonry on floors 1, 2, and 3, and IDR. 22,183,503.3 on the 3rd floor ceiling work. The benefits of applying value engineering are that it can reduce project costs without reducing the function, quality, and performance of the building, while providing a more efficient technical basis for decision-making at the planning and construction implementation stages.
The implementation of crisis communication strategies by PLN UID Bali in handling the 2025 Bali Blackout Fidyariska, Priskylia Jenia; Indrashwara, Decky Cipta
Bricolage : Jurnal Magister Ilmu Komunikasi Vol 12, No 1 (2026): Accredited by Kemenristekdikti RI SK No.152/E/KPT/2023
Publisher : Universitas Bunda Mulia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30813/bricolage.v12i1.8905

Abstract

Crises in the public service sector not only require a technical handling strategy, but also include responsive and accountable communication aspects. This study aims to analyze the public communication strategy by PLN UID Bali in responding to the blackout incident that occurred on May 2, 2025. The incident resulted in a mass power outage for nearly twelve hours in most areas of Bali. The research method used a qualitative approach and a case study design. Data was collected through in-depth interviews with PLN UID Bali Public Relations and documentation of official PLN UID Bali social media uploads. The study's findings show that applying Situational Crisis Communication Theory (SCCT), PLN UID Bali adaptively manages the flow of information and public perception by combining four main strategies: deny, diminish, rebuild, and reinforce. The study also found that time is a crucial element in crisis communication. The speed of conveying valid information can suppress the potential to escalate public unrest. For this reason, updates to crisis communication SOPs have begun to be carried out, including planning to use digital-based monitoring devices to map public perception in real-time. In general, the success of crisis handling by PLN UID Bali depends not only on the technical aspects of service recovery but also on the effectiveness of public communication built on the principles of openness, empathy, and consistency.
Performance Analysis Of Urban Transport Network In Denpasar City I Gede Fery Surya Tapa; I Ketut Sutapa; Gede Teguh Prasetya Muttiwijaya; I Nyoman Indra Kumara; Decky Cipta Indrashwara
Civilla : Jurnal Teknik Sipil Universitas Islam Lamongan Vol 11 No 1 (2026): MARET
Publisher : Program Studi Teknik Sipil, Fakultas Teknik, Universitas Islam Lamongan

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30736/cvl.v11i1.1419

Abstract

Denpasar City has experienced many changes in the use of public transportation. In the previous year 18 active routes operating, while currently there are only 5 active routes. Therefore, an analysis of the performance of transportation, route network plans, and operational systems of the transportation is needed. Primary data was obtained from headway surveys, interview surveys, and on-board surveys. Vehicle Operating Cost (VOC) calculations, route network planning, and operational systems used the Department of Transportation method. The results of the analysis showed that almost all routes did not meet the standards of both operational performance and service quality. In this study, 6 routes were planned centered on the east parking lot of Renon field. The results of the new route planning are: Renon-Penatih with a route length of 18.7 km, a circulation time of 61.5 minutes and a total of 13 vehicles; Renon-Ubung with a route length of 22 km, a circulation time of 69.8 minutes and a total of 46 vehicles; Renon-Sanur with a route length of 14.3 km, a circulation time of 45.6 minutes and a total of 3 vehicles.
Evaluation of parking space efficiency and sustainable land management strategies at Puri Raharja General Hospital in Denpasar Decky Cipta Indrashwara; Dewa Ayu Putu Adhiya Garini Putri; Dewa Ayu Trisna Adhiswari Wedagama; I Gede Fery Surya Tapa; I Nyoman Indra Kumara
Priviet Social Sciences Journal Vol. 5 No. 11 (2025): November 2025
Publisher : Privietlab

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.55942/pssj.v5i11.996

Abstract

Puri Raharja General Hospital, one of the primary healthcare facilities in Denpasar City, faces challenges related to insufficient parking. This study investigates the parking characteristics and requirements to support the planning of a multilevel parking facility as an alternative solution for optimizing limited parking areas. Data were collected through parking inventories, cordon, and patrol surveys. The analysis revealed the following characteristics for light vehicles and motorcycles in both on-street and off-street parking areas: total parking volumes of 326 light vehicles and 1,646 motorcycles; peak accumulations of 37 and 252 vehicles per hour; average parking durations ranging from 1.034–3.484 hours and 1.289–3.250 hours; peak duration distributions of 74.60% and 77.18%; turnover rates of 0.650 and 1.236 vehicles per parking space unit (PSU) per hour; maximum parking capacities of 18 and 74 PSUs per hour; parking provisions of 265 light vehicles and 1,071 motorcycles; and parking indices of 2.891 and 8.782, respectively. Based on these findings, the total parking area requirements are estimated at 1,090.63 m² for light vehicles and 1,517.89 m² for motorcycles. The proposed construction of a motorcycle parking building on the south side of the hospital and redesign of off-street parking parallel to Gadung Street are expected to reduce the motorcycle parking demand to approximately 1,127.89 m².
Analysis of the application of value engineering in the building construction project of State Elementary School 1 Padang Sambian Ronaldi Matung; I Nyoman Indra Kumara; Decky Cipta Indrashwara; Dewa Ayu Trisna Adhiswari Wedagama
Priviet Social Sciences Journal Vol. 6 No. 3 (2026): March 2026
Publisher : Privietlab

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.55942/pssj.v6i3.1258

Abstract

Cost efficiency is an important aspect of project planning. One common approach to increasing cost efficiency is value engineering. This study applies Value Engineering to the Padang Sambian 1 Public Elementary School Building Construction Project with a total planned budget of IDR. 10,019,488,000.00. The analysis was conducted using the Dell'Isola method, which consists of four stages: information, creative, analytical, and recommendation. Based on the results of the study, the items carried out by Value Engineering include concrete work items on floors 1, 2, 3 and the roof, wooden plank truss work and roof tiles (roof work), door window hanging and locking work on floors 1, 2, and 3, masonry and plastering work (wall work) on floors 1, 2, and 3, paving block installation, ceramic floor and wall installation on floors 1, 2, and 3, and ceiling work on floor 3. The cost efficiency obtained using the Dell’Isola theory value engineering method is IDR. 224,566,091.39 or 2.24% of the total project cost with details of savings of IDR. 69,226,207.23 on concrete work on floors 1, 2, 3, and roof, IDR. 58,015,626.87 on truss work, wooden planks and roof tiles (roof work), IDR. 6,890,888.88 on door and window hanging and locking work on floors 1, 2, and 3, IDR. 1,160,097.63 on masonry and plastering work (wall work) on floors 1, 2, and 3, IDR. 48,561,507.2 on paving block masonry, IDR. 18,528,260.2 on ceramic floor and wall masonry on floors 1, 2, and 3, and IDR. 22,183,503.3 on the 3rd floor ceiling work. The benefits of applying value engineering are that it can reduce project costs without reducing the function, quality, and performance of the building, while providing a more efficient technical basis for decision-making at the planning and construction implementation stages.
Sosialisasi dan Edukasi Anti Perundungan Berbasis Hak Anak pada Siswa Sekolah Dasar Negeri 1 Ubung Mahendra, I Gede Agus Surya; Indrashwara, Decky Cipta
BERNAS: Jurnal Pengabdian Kepada Masyarakat Vol. 7 No. 2 (2026)
Publisher : Universitas Majalengka

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31949/jb.v7i2.17754

Abstract

Perundungan merupakan salah satu permasalahan yang masih ditemukan di lingkungan sekolah dasar dan dapat berdampak negatif terhadap perkembangan psikologis, sosial, dan emosional anak. Oleh karena itu, diperlukan upaya preventif melalui kegiatan sosialisasi dan edukasi berbasis hak anak. Kegiatan Kuliah Kerja Nyata (KKN) ini dilaksanakan di Sekolah Dasar Negeri 1 Ubung dengan tujuan untuk meningkatkan pemahaman dan kesadaran siswa mengenai perundungan serta pentingnya perlindungan hak anak di lingkungan sekolah. Metode yang digunakan meliputi observasi, wawancara dengan pihak sekolah, serta pelaksanaan sosialisasi dan edukasi dengan pendekatan partisipatif melalui penyampaian materi, diskusi, dan interaksi langsung dengan siswa. Hasil kegiatan menunjukkan adanya peningkatan pemahaman siswa mengenai pengertian, bentuk, dan dampak perundungan, serta pentingnya saling menghargai dan menghormati hak sesama. Selain itu, kegiatan ini juga mendukung terciptanya lingkungan sekolah yang aman, nyaman, dan ramah anak. Dengan demikian, program sosialisasi dan edukasi anti perundungan berbasis hak anak terbukti efektif sebagai upaya preventif dalam mencegah perundungan serta meningkatkan kesadaran siswa terhadap perlindungan hak anak di lingkungan sekolah dasar.
ANALISIS KEKUATAN ATAP KUBAH DENGAN STRUKTUR RANGKA KAYU KELAPA P. Adi Yasa; Decky Cipta Indrashwara
PADURAKSA: Jurnal Teknik Sipil Universitas Warmadewa Vol. 12 No. 1 (2023)
Publisher : Program Studi Teknik Sipil, Fakultas Teknik dan Perencanaan, Universitas Warmadewa

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.22225/pd.12.1.6076.76-84

Abstract

The dome roof truss structure with coconut wood is an innovation initiated by CV. Bali Mandala on one of their projects located in Hawaii. Where the main material uses coconut wood which has been treated first to increase termite and fire resistance. This dome roof has a unique floral patterned truss structure, because of this unusual shape of the structure, so to ensure that the structure is safe and can be marketed widely, it is necessary to complete a feasibility test. The limited facilities for direct wind load testing are the reasons why analysis with three-dimensional (3D) computer modeling is needed. To be able to obtain the appropriate structural behavior between reality and the 3D model, validation was carried out by trial and error on the elasticity of the wood to obtain the appropriate deformation between the structure in the field and the 3D model. The validated 3D model is provided with roof loads, wind and snow loads following ASCE 7-22 provisions for the Hawaii area. From the combination of service load (D+Lr) the maximum deformation is 20.7 mm while the maximum allowable deflection is 30 mm. The tensile, compressive, shear, and flexural capacity of wooden elements, is checked based on the Allowable Stress Design Method (ASD) SNI 7973: 2013, where the compressive, tensile, shear, and flexural stresses due to the load are smaller than the allowable stress. So, from the results of stress control and deflection which are still below the limit value, it can be said that the dome roof with the coconut wood frame structure is safe and can be applied.